You are on page 1of 4

VEDANTA LIMITED

4x600 MW TPP ,JHARSUGUDA


INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT: TPP- OPERATION
STANDARD OPERATING PROCEDURE OF H2 STORAGE TANK DRAINING, HYDROTEST
WORK INSTRUCTION TITLE:
& FILLING
VER.NO: 00 REV.NO : 01 TPP/WI-BTG/OPE/66 DATE: 11/11/ 2020 PAGES 1 of 4

STANDARD OPERATION PROCEDURE


H2 STORAGE TANK DRAINING, HYDROTEST & FILLING
4X600 MW TPP
VAL, JHARSUGUDA, ODISHA

SOP FOR HYDROGEN PLANT DRAINING, HYDRO TEST AND FILLING


1. DE PRESSURISATION
2. NITROGEN PURGING AND TANK DRAINING
3. WATER FILLING
4. HYDRO TEST
5. WATER DRAIN OUT
6. NITROGEN PURGING
7. H2 FILLING AND PURITY CHECKING

S No Amendment Description Page Number(s) Current Ver. Current Rev. No Issue Date
No.
1. SI system is change by SAP 06.11.2015
00 00
System.
2. Periodic review 01 11.11.2020

Prepared By Reviewed by Approved by


PMPL PMPL VL PMPL VL

1
VEDANTA LIMITED
4x600 MW TPP ,JHARSUGUDA
INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT: TPP- OPERATION
STANDARD OPERATING PROCEDURE OF H2 STORAGE TANK DRAINING, HYDROTEST
WORK INSTRUCTION TITLE:
& FILLING
VER.NO: 00 REV.NO : 01 TPP/WI-BTG/OPE/66 DATE: 11/11/ 2020 PAGES 2 of 4

BEFORE DRAINING THE FOLLOWING PRECAUTION SHOULD BE


TAKEN
 Unauthorized entry is prohibited.
 No one should have mobile in plant area & storage area.
 There should be no inflammable material in the area.

DE PRESSURISATION:

After maximum possible use of hydrogen from the tank the tank will be isolated
at pressure about 0.5 Mpa. For isolation, ensure following valves to be in closed
condition.
 Tank inlet valve
 Tank outlet valve
 Tank safety isolation valve

The following steps to be taken for venting & draining in presence of the
departments TMD, Fire Fighting and Safety.

 Open the atmosphere vent at tank pressure 0.5mpa.


 After reaching pressure 0.1mpa start the draining procedure.
 Drain line pipe immersed in water bucket.
 Firefighting person ready for spray water in the bucket.
 Drain line 1st manual valve fully open.
 Drain line 2nd manual valve to be kept crack open.
 As the bubbles seen in the bucket H2 should be detect by Detector.

The draining procedure continue till the pressure come to 0.0 Mpa in local
pressure gauge.

NITROGEN PURGING AND DRAINING:

Prepared By Reviewed by Approved by


PMPL PMPL VL PMPL VL

2
VEDANTA LIMITED
4x600 MW TPP ,JHARSUGUDA
INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT: TPP- OPERATION
STANDARD OPERATING PROCEDURE OF H2 STORAGE TANK DRAINING, HYDROTEST
WORK INSTRUCTION TITLE:
& FILLING
VER.NO: 00 REV.NO : 01 TPP/WI-BTG/OPE/66 DATE: 11/11/ 2020 PAGES 3 of 4

 After getting pressure 0.05Mpa in local pressure gauge on the tank, Close the isolation
valve of safety valve. Connect the N2 cylinder in SV port.
 Fill the nitrogen in tank through safety valve port by operating its isolation valve so as
to maintain 0.05 to 0.03Mpa (Entire process) and start purging out H2.
 Sample (H2 & N2 gas mixture) to be checked with H2 detector.
 Ensure H2 is completely emptied then depressurize the tank completely.

WATER FILLING & HYDROTEST:

 DM water to be filled in the tank through the drain line and vent line is opened & the
tank should be completely filled with DM water.
 Connect the hydro pump through SRV port.
 Raise the pressure up to Hydrostatic Test Pressure (42.9 Kg/Cm2).
 Observe for half an hour (30 Min) for any pressure drop from the tank.
 If any noticeable leakage is not found or no drop of pressure is observed then hydro
test of the tank is successfully completed.

WATER DRAIN OUT:

 Water to be drained out completely after completion of hydro-test through the tanks
drain & all dummies to be removed from the tank.
 All the fittings (except safety valve) to be connected with the tank.

NITROGEN PURGING & HYDROGEN FILLING:

 Fill the nitrogen in tank through safety valve port.


 Raise the pressure upto 6-7 kg/cm2.
 Connect the safety valve at the port of the tank.

 Check any leakage at all flanges by using soap water solution.

Prepared By Reviewed by Approved by


PMPL PMPL VL PMPL VL

3
VEDANTA LIMITED
4x600 MW TPP ,JHARSUGUDA
INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT: TPP- OPERATION
STANDARD OPERATING PROCEDURE OF H2 STORAGE TANK DRAINING, HYDROTEST
WORK INSTRUCTION TITLE:
& FILLING
VER.NO: 00 REV.NO : 01 TPP/WI-BTG/OPE/66 DATE: 11/11/ 2020 PAGES 4 of 4

 Drain out nitrogen from the drain line of the tank and fill gradually hydrogen in the
tank.
 Check the purity of hydrogen upto 99.5%.

Job Safety Safety Ear muff Respirator/ Leather Safety Safety


description/ Helmet Harness Dust Mask gloves Goggle Shoes
PPE ->

H2 tank
draining & Y Y N N Y Y Y

filling

Prepared By Reviewed by Approved by


PMPL PMPL VL PMPL VL