S No Amendment Description Page Number(s) Current Ver. Current Rev. No Issue Date
No.
1. SI system is change by SAP 06.11.2015
00 00
System.
2. Periodic review 01 11.11.2020
1
VEDANTA LIMITED
4x600 MW TPP ,JHARSUGUDA
INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT: TPP- OPERATION
STANDARD OPERATING PROCEDURE OF H2 STORAGE TANK DRAINING, HYDROTEST
WORK INSTRUCTION TITLE:
& FILLING
VER.NO: 00 REV.NO : 01 TPP/WI-BTG/OPE/66 DATE: 11/11/ 2020 PAGES 2 of 4
DE PRESSURISATION:
After maximum possible use of hydrogen from the tank the tank will be isolated
at pressure about 0.5 Mpa. For isolation, ensure following valves to be in closed
condition.
Tank inlet valve
Tank outlet valve
Tank safety isolation valve
The following steps to be taken for venting & draining in presence of the
departments TMD, Fire Fighting and Safety.
The draining procedure continue till the pressure come to 0.0 Mpa in local
pressure gauge.
2
VEDANTA LIMITED
4x600 MW TPP ,JHARSUGUDA
INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT: TPP- OPERATION
STANDARD OPERATING PROCEDURE OF H2 STORAGE TANK DRAINING, HYDROTEST
WORK INSTRUCTION TITLE:
& FILLING
VER.NO: 00 REV.NO : 01 TPP/WI-BTG/OPE/66 DATE: 11/11/ 2020 PAGES 3 of 4
After getting pressure 0.05Mpa in local pressure gauge on the tank, Close the isolation
valve of safety valve. Connect the N2 cylinder in SV port.
Fill the nitrogen in tank through safety valve port by operating its isolation valve so as
to maintain 0.05 to 0.03Mpa (Entire process) and start purging out H2.
Sample (H2 & N2 gas mixture) to be checked with H2 detector.
Ensure H2 is completely emptied then depressurize the tank completely.
DM water to be filled in the tank through the drain line and vent line is opened & the
tank should be completely filled with DM water.
Connect the hydro pump through SRV port.
Raise the pressure up to Hydrostatic Test Pressure (42.9 Kg/Cm2).
Observe for half an hour (30 Min) for any pressure drop from the tank.
If any noticeable leakage is not found or no drop of pressure is observed then hydro
test of the tank is successfully completed.
Water to be drained out completely after completion of hydro-test through the tanks
drain & all dummies to be removed from the tank.
All the fittings (except safety valve) to be connected with the tank.
3
VEDANTA LIMITED
4x600 MW TPP ,JHARSUGUDA
INTEGRATED MANAGEMENT SYSTEM
DEPARTMENT: TPP- OPERATION
STANDARD OPERATING PROCEDURE OF H2 STORAGE TANK DRAINING, HYDROTEST
WORK INSTRUCTION TITLE:
& FILLING
VER.NO: 00 REV.NO : 01 TPP/WI-BTG/OPE/66 DATE: 11/11/ 2020 PAGES 4 of 4
Drain out nitrogen from the drain line of the tank and fill gradually hydrogen in the
tank.
Check the purity of hydrogen upto 99.5%.
H2 tank
draining & Y Y N N Y Y Y
filling