MEP CLEARANCE CHECKLIST ABOVE FALSE CEILING

PROJECT: Commercial Development at Al-Nasser, Doha - Qatar


Checklist Ref……………………. Date………………..….…………………. Area Ref……......….……….……….. Floor No…………..
Note: Before closing the false ceiling, the following check must be completed.
Status
S.no Inspection required Not Reference Remarks
Inspected inspected
A HVAC
Ducting
1 Ducting material
2 Ducts roots
3 Duct Insulation
4 Duct Installation
5 Duct Support
6 Volume Control Damper
7 Fire damper with access door
8 Bell mouth with wire mesh
9 Diffuser / Grill (Dropper / Plenum)
10 Exhaust duct
11 Return Duct
12 Flexible duct
13 Fresh air duct
14 Pressurization duct lobby
15 Pressurization duct stair case
16 Duct Risers
17 Smoke extract duct
CHILLED WATER PIPE
1 Pipe Material & sizes
2 Valve
3 Supports
4 Pressure test of piping
5 Chilled water circuit
6 Pressure test after valve fitting
7 Riser support
8 Maintenance access door (Builder work)
9 Labeling identification (Builder work)
Equipments
1 FCUs
2 AHUs
3 Fans

Inspected by: Name Signature Date


Civil Eng.

Electrical Eng.
Mechanical Eng.
Senior MEP
Project Manager

1/5
MEP Checklist Form: DARA/CSD/12
MEP CLEARANCE CHECKLIST ABOVE FALSE CEILING
PROJECT: Commercial Development at Al-Nasser, Doha - Qatar
Checklist Ref……………………. Date………………..….…………………. Area Ref……......….……….……….. Floor No…………..
Note: Before closing the false ceiling, the following check must be completed.
Status
S.no Inspection required Not Reference Remarks
Inspected inspected
B FIRE FIGHTING
1 Pipe Material & sizes
2 Sprinkler Point
3 Pressure test of main line loop
4 Riser support
5 Fire house Cabinet
6 Fire hose cabinet Connection
7 Pressure test after sprinkler fitting
8 Red oxide paint
9 Flushing connection
10 Inspection Test Connection
11 Zone Control Valve assembly
12 Interface of Zone Control Valve with FA
C PLUMPING
Water Supply
1 Water points hot and cold
2 Hot water return connection
3 WC point
4 Cold water/Hot water leak test
5 Risers with support
Drainage
1 Drainage connection
2 Floor drain points
3 Drainage joint leak test
4 Riser with support
D CIVIL WORK
1 Installation of pipe sleeves
2 Installation of duct sleeves
Closing around pipes sleeve with fire rated
3 materials
Closing around ducts sleeve with fire rated
4 materials
5 Opening through wall of retain air

Inspected by: Name Signature Date


Civil Eng.
Electrical Eng.
Mechanical Eng.
Senior MEP
Project Manager

2/5
MEP Checklist Form: DARA/CSD/12
MEP CLEARANCE CHECKLIST ABOVE FALSE CEILING
PROJECT: Commercial Development at Al-Nasser, Doha - Qatar
Checklist Ref……………………. Date………………..….…………………. Area Ref……......….……….……….. Floor No…………..
Note: Before closing the false ceiling, the following check must be completed.
Status
S.no Inspection required Not Reference Remarks
Inspected inspected
E ELECTRICAL
Light & Power
1 Wiring and Conduit s for Light points
2 Wiring & Conduits of Exit Light points
3 Wiring & Conduits of Emergency light points
4 Power supply for Fan coil unit.
5 Power supply for motorized damper.
6 Power supply for exhaust fan.
7 Contactors units for power saving card
Low Current
1 IPTV
2 Telephone
CCTV
1 wiring and Conduit s for Camera point
2 Power supply for CCTV points
Audio System
1 Wiring & Conduits for bathrooms Speaker.
Wiring & Conduits for voice evacuation
2 Speaker
Fire Alarm System
1 Wiring & Conduits for fire alarm detector point
2 Interfacing with zone control valve.
3 Interfacing with motorized damper.
4 Interfacing with FCUs / AHUs
BMS
1 Wiring and conduit of BMS DDC point for FCU
Wiring & conduits of BMS DDC point for Light
2 control panel
Wiring and conduit of BMS DDC point for
3 access door.
Wiring and conduit of BMS DDC point for
4 Power saving Card.

Inspected by: Name Signature Date


Civil Eng.
Electrical Eng.
Mechanical Eng.
Senior MEP
Project Manager

Notes

3/5
MEP Checklist Form: DARA/CSD/12
4/5
MEP Checklist Form: DARA/CSD/12
Doc.Name: DOC. NO :

CHECK LIST FOR HVAC AND OTHER


BG/QA/CL-304/13 Rev:00
RELATED ACCESSORIES

Project:
Date
Status
S.no Inspection required Initial Remarks
Not inspected
Inspected
A HVAC

1 Installation of package AC

2 Installation of spring Isolators

3 Fixing of flexible connector

4 Installation of fresh air intake

5 checking of Electrical Isolator & cable

6 Check refrigerant

7 check oil level

8 Check suction and discharge pressure

9 Instalation of fire damper

10 Fixing of insulation

11 Instalation of supply air duct, return air duct

12 Instalation of VCD & VAV

13 Instalation of Flexible connector,mixing box

14 Pressurization duct lobby

15 Pressurization duct stair case

16 Installation of supply air diffuser,RAD

17 Duct Risers

18 Smoke extract duct

Inspected by: Name Signature Date

Electrical Eng.
Mechanical Eng.
MEP Eng
Project Manager