Project Client Project code.

: : :

Upgrade Water Injection Project Daleel Petroleum Company LLC 8212

Requisition / Datasheet for DP Transmitter for Flow Doc no. : 3623-DAL-F-J-112

DPC Project Engineer : Sunny George

1
Rev

Issued for Enquiry


Description Prepd By Chkd Appd By By Telephone Fax Date Daleel Appd 24523864 24523954 Date

Daleel Petroleum LLC P O Box 543, Seeb, Muscat Postal Code 112 Sultanate of Oman

Daleel Petroleum Co. LLC Requisition Datasheet for DP Transmitter for Flow J3623 - B-Block Station (Upgrade Water injection Project)

Doc No. Rev. No. Page No.

: 3623-DAL-F-J-112 :O : 1 of 6

TABLE OF CONTENTS
DATA SHEET .. . 3 REQUISITION FOR ENGINEERING DOCUMENT (RED) FORM........4 LIST OF APPROVED VENDORS.............................................................5

Daleel Petroleum Co. LLC Requisition Datasheet for DP Transmitter for Flow Upgrade Water Injection Project

Doc No. Rev. No. Page No.

: 3623-DAL-F-J-112 :1 : 2 of 6

Requisition Item No.

Daleel Petroleum Co. LLC Requisition Datasheet for DP Transmitter for Flow Upgrade Water Injection Project

Doc No. Rev. No. Page No.

: 3623-DAL-F-J-112 :1 : 3 of 6

G E N

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Quantity Tag No. Service Instrument type

4 15-FZA-44/46, 15-FIC-45/47 Injection water Non Sour Differential pressure Tx(for flow), Smart (HART) On 5-valve manifold with 1 / 2 NPT(F), to be provided with the transmitter SS 316 S 316 L No Kidney flanges for direct mounting as per DIN 19213, 54 mm centers. 5-valve manifold with 2 NB pipe mounting brackets 4 20 mA dc, Smart Smart (HART protocol) IP-65 to IEC-60529 Note - 4 20 mm ISO Zone-2 EExd, IIB, T4 ATEX / CENELEC 0.25 % of span Note - 4 Note - 4 15 : 1 Internal 0 to 24 (0 to 5724 cu.m/d) Required (in engg. units cu.m/hr or cu.m/d or bbld for flow) Injection Water-Non Sour 12990/--/11240 14,250 50 / 40 / 20 82 / 5

B O D Y

Type of mounting Body material Diaphragm material NACE required Process connection Accessories

Note-3

T R A N S M I T T E R

Transmitter output Note-1 Transmitter type Enclosure class Enclosure case Electronic connection Note-2 Electrical safety Type of protection Approval authority Accuracy including linearity, repeatability and hysteresis Linearity Repeatability Rangeability Calibration adjustment Calibrated range kPa Integral LCD meter Note-5

28 Fluid 29 Operating Pressure kPa(g) Max/Nor/Min 30 Design Pressure kPa(g) 31 Operating Temp C Max/Nor/Min 32 Design Temp C Max / Min 33 34 35 C 36 O 37 Ambient temp (shade) C 5 to 60 N 38 Ambient Temp black bulb C Note 5 82 D 39 General requirements Note 6 I 40 T 41 I 42 O 43 N 44 S 45 Notes : 1. Transmitter shall be loop powered two wire system with 750 ohms maximum load. No separate power supply shall be required and shall be battery operated. Vendor shall supply the battery 2. Approved adaptor for conduit connection shall be supplied if required. 3. No body vent or drain connections shall be provided, these shall be plugged. 4. Vendor standard. 5. Vendor to specify if shade is required. 6. Dx as per IEC 60654 and 4K6, 4Z2, 4Z4, 4Z6, 4C2, 4S4, 4M1 as per IEC 60721-3-4.

P R O C E S S

Daleel Petroleum Co. LLC Requisition Datasheet for DP Transmitter for Flow Upgrade Water Injection Project

Doc No. Rev. No. Page No.

: 3623-DAL-F-J-112 :1 : 4 of 6

REQUISITION FOR ENGINEERING DOCUMENTS


Purchasing (Procurement) Office Daleel Petroleum Company, PO Box 543, PC 112, Ruwi, Sultanate of Oman. SPECIAL INSTRUCTIONS Production Schedule Manufacturing, Inspection and testing sequence plan DRAWINGS Approval drawings/Final drawings To be submitted under cover of an ADS form/ FDS form respectively
General arrangement drawings Calculation sheets Technical datasheets Static calculations Anchor bolt location plan Foundation loading plan Welding procedures Factory Inspection Plan Pneumatic Schematic Wiring Diagram Test report

RED form
Distribution Office Daleel Petroleum Company, PO Box 543, PC 112, Ruwi, Sultanate of Oman. Attn.: Mr. Sunny George Documents shall be submitted to:
Distribution office.

Principal (Purchaser) Daleel Petroleum Company, PO Box 543, PC 112, Ruwi, Sultanate of Oman. Attn.: Mr. Sunny George Prints

Required number for Approval Final issue Transparencies Prints


3 3

TIMING FOR SUBMITTAL - for approval 2 weeks after order date - final issue 2 weeks after approval/order date Documents shall be submitted to :
Distribution office.

Originals (Note 1)

Prints
3 3

SPARE PARTS DOCUMENTS


Electronic Copy 1

TEST AND INSPECTION DOCUMENTS Approval/Final documents to be submitted under cover of an ADS/FDS form respectively
Manufacturing report to applicable standards Material certificates to ISO 10474: Type-3.1 B (pressure parts), ISO 10474 Type 2.1/2.2 (non pressure parts) Electrical certificates to Cenelec/PTB/Baseefa/Compliance Static/dynamic balancing certificates Test certificates Heat treatment graphs Test data/curves

Prints Documents shall be submitted to:


Distribution office within 2 weeks of test. 3 3 3

OPERATING DOCUMENTS Installation instructions Operating instructions Maintenance instructions 3 3 3

Documents shall be submitted to: To be included with equipment.

ADDITIONAL REQUIREMENTS Note 1: If the document is available in electronic form, a diskette containing the electronic file shall also be submitted. REMARKS
Invoice must certify that the drawings and engineering documents specified above have been despatched to all parties concerned. Any deviation from the timing for submittal of documents shall be notified to the Approval/Distribution Offices by E-mail or fax. Shop fabrication shall not be started before the required approval drawings have been released for construction by the party concerned, unless otherwise stated on the Approval Drawing Specification. Each document shall bear the item/tag and order reference number, and shall be despatched by air mail unless specified otherwise. Units/dimensions used on Engineering documents shall be SI. Exceptions to SI units are standardized imperial units for nominal sizes of pipe, valves flanges, bolting etc. The documents shall be in English. Description on drawings and similar documents may be in other languages provided English translations are also given. Drawings and documents shall be suitable for microfilming and comply with accepted national or international standards for the preparation of technical drawings. Only the following standard sizes should be used : A4, A3, A2, A1.

Daleel Petroleum Co. LLC Requisition Datasheet for DP Transmitter for Flow Upgrade Water Injection Project

Doc No. Rev. No. Page No.

: 3623-DAL-F-J-112 :1 : 5 of 6

LIST OF RECOMMENDED VENDORS Manufacturer Honeywell Emerson (Rosemount) Foxboro Yokogawa ABB Local Agent Honeywell Oman LLC Seven Seas Petroleum OOISS Hi-Tech Engineering Services Orbital Projects and Services LLC

Daleel Petroleum Co. LLC Requisition Datasheet for DP Transmitter for Flow Upgrade Water Injection Project

Doc No. Rev. No. Page No.

: 3623-DAL-F-J-112 :1 : 6 of 6