SEWERAGE DISCHARGE CALCULATION

Project No. 3481 Date 08/05/2023


Project Name Serenia Living Prepared By MPT
Checked By DW
Issue IFC

1 Basis

NOTE: INFORMATION IS TAKEN FROM DUBAI MUNICIPALITY DRAINAGE AND IRRIGATION DEPARTMENT SEWERAGE AND DRAINAGE DESIGN CRITERIA

2 Calculation

Population for all 4 Towers = 1564 (Taken from Water Demand Calculation)

(-1/6)
Dubai Peaking Factor Formulae = 4.25 x (Population / 1000 )

Dubai Peaking Factor = 3.89

Average Domestic Water Demand = 557 m3/day (Taken from Water Demand Calculation)
= 0.0064 m3/second (Assumed consumption of 24 hours)
= 6.44 litres/second

Peak Drainage Flow Discharge from the Buildings = (Dubai Peaking Factor X Average Domestic Water Demand

Peak Drainage Flow Discharge from the Buildings = 25.03 litres/second

Peak Drainage Flow from the Swimming Pool back wash = 10.30 litres/second

Peak Drainage Flow from the car park sump pit = 15.80 litres/second

Peak Drainage Flow Discharge from the Buildings = 40.83 litres/second (added the worst scenario)

Total Daily Volume of Sewage Discharge Flowrate = 500.85 m3/day (90% of Total Daily Water Demand)

3 Conclusion

NOTE: INFORMATION TAKEN FROM BS EN 12056 PART 2


DN 250 pipe with 1:100 slope can accommodate = 44.9 l/s