You are on page 1of 14

MASSA MARITIME ACADEMY

Lesson Plan
FUNCTION: NAVIGATION AT THE MANAGEMENT LEVEL

SUBJECT AREA: ENGINEERING KNOWLEDGE, INSTRUMENTS & CONTROL SYSTEM

TRAINING AREA:

MAIN ELEMENT TEACHING TEXT DGS/ST- A /v INSTRU TIME


SPECIFIC LEARNING OBJECTIVE METHOD BOOK CW REF AID CTOR HRS
IN TEACHING SEQUENCE GUIDEL
WITH MEMORY KEYS INES
H=hour

DGS
LECTURE T- 1,T-2,T-3 CIR LCD/OHP
11/2012 Projector,
Appendix Slides
M-II/2A

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 1 of 14


MASSA MARITIME ACADEMY
Competence No. 11: Operate remote controls of
propulsion plant and engineering systems and services
11.1 Marine Engineering Terms and Fuel
Consumption)
11.1 Marine engineering terms:
Define: LECTURE T- 1 DGS LCD/OHP 1
CIR Projector,
- Mass, Force, Work, Power,
11/2012 Slides
- Energy, Stress, Strain, heat, Appendix
- Efficiency of a machine M-II/2A

- Indicated power, shaft power,


- Propeller power and thrust

11.1.2 Fuel consumption:


Define
DGS LCD/OHP
- Admiralty coefficient, Fuel coefficient, Thermal
CIR Projector, 2[T]+
Efficiency, Specific Fuel Consumption LECTURE T- 1 11/2012 Slides 4[N]
Explain Appendix
- Effect of condition of hull, tips of propeller on fuel M-II/2A
coefficient, fuel consumption, and propeller
efficiency.

Describe
- Indicator diagrams and the information obtained
MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 2 of 14


MASSA MARITIME ACADEMY
Calculate
- Power output from indicator diagrams
- Daily consumption at service speed
- Bunker fuel required for the voyage LECTURE T- 1 & T -2 DGS LCD/OHP CONT’D
- Speed for a given daily consumption CIR Projector,
Speed required to complete a voyage with given 11/2012 Slides
consumption. Appendix
M-II/2A

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 3 of 14


MASSA MARITIME ACADEMY
11.2 Auxiliaries :
11.2.1 Auxiliary boilers:
Describe
DGS LCD/OHP
- Water tube boiler
LECTURE T-1& T-3 CIR Projector,
- Fire tube boilers 11/2012 Slides
- Exhaust gas boiler Appendix 4
- Importance of maintaining correct water level and M-II/2A
function of safety valve
Distinguish
- Between water tube and fire tube boiler
Describe
The procedure of flashing the boiler from cold .
Effects of salts in boiler feed water and procedure
for treatment of feed

11.2.2 Distillation and fresh-water systems:


Explain with sketch as necessary LECTURE T-1& T-3 LCD/OHP 2
DGS Projector,
- Principle of operation of a low pressure Fresh
CIR Slides
Water Generator 11/2012
- Principle of Reverse osmosis Appendix
- Hydrophore system for domestic water supply. M-II/2A
- Drinking Water Treatment

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 4 of 14


MASSA MARITIME ACADEMY
11.2.3 Pumps and pumping systems:
Describe with sketch the principle of working of DGS LCD/OHP 4
LECTURE T-1& T-3 CIR Projector,
- Reciprocating pump/Gear pump/Screw pump
11/2012 Slides
- Centrifugal pump [including Hydraulic Aggregate Appendix
pump M-II/2A
(Hydraulically driven submerged pump – trade
name Framo), Submersible, and Deepwell
pumps]
- Fire pumps
- Emergency Fire pump and its pumping
arrangement
Describe
- Typical bilge system of a ship.
- - Typical ballast system of a ship

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 5 of 14


MASSA MARITIME ACADEMY
11.2.4 Steering gears:
Describe with sketch
LECTURE T-1 &SOLAS DGS LCD/OHP 4
- Ram type hydraulic steering gear
CIR Projector,
- Rotary vane steering gear 11/2012 Slides
- Electrical steering gear Appendix
- Telemotor system M-II/2A
- Fail safe arrangement
State
- IMO requirements for auxiliary steering gears
- IMO requirement for testing steering gears
- Requirements for Emergency Control

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 6 of 14


MASSA MARITIME ACADEMY
11.2.5 Generators, alternators and electrical
distribution:
LECTURE T-1& T-3 DGS LCD/OHP 3
Explain
CIR Projector,
- Operation of an alternator 11/2012 Slides
- Electrical distribution systems Appendix
- Use of circuit breaker & fuses. M-II/2A
- Procedure for maintenance of batteries
- Operation of Emergency Compressor
- Purpose and operation of purifiers
Describe with sketch
- Navigation light circuit with indicators/ alarms
and alternative power supply
List
- Services to be supplied from Emergency
Generator
Describe
Procedure for starting emergency generator manually.

11.2.6 Refrigeration, air-conditioning and ventilation:


State LECTURE T-1& T-3 DGS LCD/OHP 2
CIR Projector,
- Properties of a refrigerant
11/2012 Slides
Describe with sketch Appendix
- Simple refrigeration cycle for domestic M-II/2A
refrigeration and cargo spaces
- Working principle of air conditioning plant
MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 7 of 14


MASSA MARITIME ACADEMY
11.2.7 Stabilisers: DGS CIR LCD/OHP 1
Describe LECTURE T-1& T-2 11/2012 Projector,
Appendix Slides
- Construction and operation of fin stabiliser
M-II/2A
11.2.8 Sewage treatment plants:
Describe with sketch LECTURE T-1& T-2 DGS LCD/OHP 2
CIR Projector,
- Operation of chemical sewage treatment plant
11/2012 Slides
- Operation of biological sewage treatment plant Appendix
M-II/2A
11.2.9 Oily-water Separators and oil filtering equipment:
Describe with sketch LECTURE T-1& T-3 DGS LCD/OHP 2
CIR Projector,
- Construction and operation of Oily Water
11/2012 Slides
Separator Appendix
- Construction and operation of ODMCS. M-II/2A
11.2.10 Incinerators:
Draw
Block diagram for the operation of a waste
incinerator.

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 8 of 14


MASSA MARITIME ACADEMY
11.2.11 Deck machinery:
Explain
LECTURE T-1& T-2 DGS LCD/OHP 2
- Advantages and disadvantages of steam, electric
CIR Projector,
and hydraulic drive for winches 11/2012 Slides
Describe Appendix
- Routine maintenance including lubrication of deck M-II/2A
machinery (windlass, mooring winch, cranes,
cargo winches)
Describe with sketch
- Windlass drive system
11.2.12 Hydraulic systems:
Describe
- Hydraulic accumulator
- Ram and rotary vane actuators
- Common failures of system and remedial
measures
State
- Necessity for cooling/ heating of hydraulic oil

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 9 of 14


MASSA MARITIME ACADEMY
11.3 Marine Power plants :
11.3.1 Diesel engines:
Describe DGS
- Working principle of two stroke and four stroke LECTURE T-1& T-2 CIR LCD/OHP 12
11/2012 Projector,
internal combustion engines Appendix Slides
- Compare and contrast M-II/2A
- Two stroke and Four stroke internal combustion
engines
- Explain
- Causes of Scavenge fires and remedial actions
- Causes of Crankcase explosions
- Super charging (constant pressure and pulse type)
Describe
- Preparation of Diesel Engine for Standby mode
- Procedure for starting and reversing
State
- Number of starts is limited by capacity of starting
air reservoir
Draw a block diagram of
- Fuel oil system from bunker tank to injection
- Lubricating oil system
- Cooling water system

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 10 of 14


MASSA MARITIME ACADEMY
11.3.2 Steam turbine systems
Explain LECTURE T-1& T-3 DGS LCD/OHP
CIR Projector, 4
- Working principle of
11/2012 Slides
- Impulse turbine Appendix
- Reaction turbine M-II/2A
Describe
- Steam turbine and its bearing
- Procedure for warming through a steam turbine
for manoeuvring
- Procedure for manoeuvring using a steam turbine
(forward and astern
11.3.3 Propeller and propeller shaft:
Define LECTURE T-1& T-2 DGS LCD/OHP 3[T]+
CIR Projector, 3[N]
- Pitch, slip and efficiency of a propeller
11/2012 Slides
Calculate Appendix
- Percentage apparent slip, real slip M-II/2A
- Ship’s speed given rpm, mean pitch and
percentage slip
- Indicated power, shaft power, delivered power
and effective power
Explain
- How propeller thrust is transmitted to the hull
- How propeller shaft is supported
- How propeller (keyless) is secured to tail shaft

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 11 of 14


MASSA MARITIME ACADEMY
Describe
- Operation of a controllable pitch propeller

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 12 of 14


MASSA MARITIME ACADEMY
11.3.4 Bridge control:
Describe with block diagram DGS LCD/OHP
LECTURE T-1, T-2& T-3 CIR Projector, 3
- Control systems for Main Engine (including
11/2012 Slides
control from bridge, ECR and local) Appendix
- Bridge control of controllable pitch propeller, M-II/2A
List
- Indicators and alarms provided with bridge
control
- Indicators for lateral thrusters.
Explain
- Arrangements and operation of lateral thrusters
- Main Engine starting arrangement
- Purpose of turbocharger and need to control
. rpm whilst carrying out turbocharger .
. washing.

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 13 of 14


MASSA MARITIME ACADEMY

11.4 Engine room watchkeeping

11.4.1 LECTURE T-1 DGS LCD/OHP 2


- Describe arrangements necessary for CIR Projector,
11/2012 Slides
. appropriate and effective engineering
Appendix
. watchesto be maintained M-II/2A

- for the purpose of safety under normal


circumstances and UMS operations.
11.4.2
- Describe arrangements necessary to ensure a .
safe engineering watch is maintained when . . .
carrying dangerous cargo
T=THEOY,
N=NUMER
TOTAL ICAL 53[T]+7
[N]=60
H
BOOKS : T -1 BASIC ENGINEERING KNOWLEDGE - BY MR. J.K.DHAR
T- 2 NAVAL ARCHITECTURE - BY MR. REEDS VOLUME 4
T – 3 MARINE ELECTRICAL TECHNOLOGY - BY MR. ELSTAN A. FERNANDEZ

MASSA/CHIEF MATES PHASE-II / LESSON PLAN

Approval Date : 06.02.2012 Version No. : 000 Page 14 of 14

You might also like