Professional Documents
Culture Documents
v=k7SXwQGijHU
Viewers no one, even a Metallurgist, can confirm the Properties of any Material by just having a look on
that. In order to confirm the Properties of the Material we have to go through an exercise that is called
Review of MTC (Mill Test Certificate or MTR Mill Test Report).
Now to perform this Reviewing Exercise it is necessary to become familiar with the MTC.
What is MTC?
Viewers MTC is a Document that is generated by the Product Manufacturers or Steel Mills for its
Purchasers. This document Declares Specific Information in accordance with the sole or the combination
of forth coming Documents
2. Type of MTC. Please see Details of BS EN 10204 on Internet or other source of information.
3. Material Specification of the Product Like ASTM or SA 106 Grade B with Year & Date
6. Chemical Test Results of the Product or the Chemical Composition of the Product
8. Supplementary Requirements by the Construction Code. Viewers please do not mix the Requirements
of Manufacturing Code & Construction Code together. SA 516 Grade 70 is a Manufacturing Code of Plate
whereas ASME VIII is a Construction Code for Vessel Fabrication similarly SA 106 Grade B is
Manufacturing Code for Pipe & ASME B31.3 is one of the Construction Codes for Piping Fabrication
12. Validation of the Product by the Product Manufacturer’s Authorized Inspector in accordance with
the Type of MTC. Viewers please do not forget to study BS EN 10204 for different Types of MTCs & their
Validation.
How to Review the MTC?
Viewers please keep in your mind that Reviewing Process becomes to completion when some
Prerequisites are met. Purchase Order or Other Ordering Info & the Latest Version of Product
Specification are the Prerequisites that should be available with you while reviewing the given MTC.
2. Type of MTC
5. Acceptable Comparison of Chemical & Mechanical Tests Results of MTC & Product Specification
8. Verification of Marking in compliant with Product Specification. Viewers this Verification of Marking is
very Important Exercise. And Lastly
9. Signing Off the MTC by putting Signatures, Name, Designation, Date, Stamp & Product Specification
with Year-Date against which the MTC is Reviewed.
1. What is MTC