Professional Documents
Culture Documents
Once printed this specification becomes an uncontrolled copy of the online version.
05.12.00.1110
NS-1™ Number: NS 05.12.00.1110
Revision Date: January 2013
Equipment Name: CEMENTING TOOLS
Manufacturer: GENERAL
Model/Type: VARIOUS
Material Group: LOW ALLOY STEEL
Service: NON-SOUR
Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service
NS 1 Page 1
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment
Once printed this specification becomes an uncontrolled copy of the online version.
SCOPE
This general NS-1™ specification specifies the minimum quality and inspection requirements applied to wrought
Low Alloy Steel Cementing Tools.
It applies to:
This equipment shall be in conformance with the requirements of API Spec. 7-1, API Spec.7-2, RP7G and the
requirements of this NS-1™ specification. If in conflict the requirements of this NS-1™ specification shall pre-
vail. The matrix of this NS-1™ specification provides a quality template that can be applied to any make and
type of Cementing Tools. When ordering spare parts or sub-assemblies, they should be ordered to this specification.
NOTES TO PURCHASER:
1. For more details regarding the application of this NS-1™ specification, reference can be made to the
"Introduction Section" to NS-1™ on the original document.
2. It is assumed that as part of compliance with ISO 9001 the manufacturer has conducted Design Performance
Verification Testing and has documented test results to demonstrate conformance of the product to design
requirements.
3. Fearnley Procter Group has a product approval scheme running under NS-1™ and any Supplier or
Manufacturer wishing to seek approval may do so by contacting NS1info@fearnleyproctergroup.com
Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service
NS 1 Page 2
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment
Once printed this specification becomes an uncontrolled copy of the online version.
SUPPLEMENTARY REQUIREMENTS
The following requirements are supplementary to and shall be applied in conjunction with the quality sub-
specifications called out in the matrix of this NS-1™ Specification.
2. Welding
No fabrication or repair welding shall be performed.
3. Threaded Connections
3.1 Threaded connections shall be inspected and gauged in accordance with Sub-spec 90.2.1.
3.2 Cementing Assemblies with rotary threaded connections as per API Spec.7-2, do not require stress
relief features.
3.3 All new rotary connections shall be provided with a benchmark in accordance with the requirements
of API RP7G as a minimum. The preferred form of benchmark is an indicator which provides a 360°
reference around the connection. This type of benchmark is superior to the API one, in that it reveals
not only the extent of refacing but also how perpendicular the refaced seal is to the pipe’s axis.
3.4 In designing service connections in the body of the tool, it is recognised that the manufacturer may
use proprietary styles of connection. In their design and testing, consideration must be given to
fatigue and minimising the risk of premature failure of such connections.
3.5 Connections shall be given a suitable corrosion resistant anti-galling surface finish.
Electro-copperplating and phosphating in accordance with recognised standards are considered
suitable. No other type of anti-galling treatment shall be used without prior written agreement from
the purchaser.
3.6 All threaded end connections shall be thoroughly coated with a protective layer of an agreed thread
compound or preservation compound prior to shipment.
3.7 The threaded end connections shall be protected with heavy-duty reinforced plastic or pressed steel
thread protectors.
4. Material Testing
(Ref. Sub-spec. 10.1 & Sub-spec. 10.4))
Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service
NS 1 Page 3
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment
Once printed this specification becomes an uncontrolled copy of the online version.
5. Marking
(Ref. Sub-spec. 20.3)
5.1 Each assembly shall be provided with a marking recess located at a point that will see little or no
stress or wear on the O.D. of the main body member.
5.2 The recess shall be stamped in accordance with the requirements of Sub-spec 20.3.
5.3 Size of the recess shall be in accordance with API Spec. 7-1.
6. Inspection
(Ref. Sub-Spec 40.1 & 50.1)
6.1 Ultrasonic Examination (UT) shall as a minimum, be carried out as per API Spec 7-1 for Ultrasonic
Evaluation.
6.2 The bore at each end shall be concentric with the centreline, eccentricity shall not exceed 1.6 mm
(1/16"). The bore shall also be drift tested.
6.3 The variation in wall thickness across any step in the bore shall not exceed 1.6 mm (1/16"). Steps
within the above acceptance criteria shall be dressed to a smooth finish.
6.4 A 100% wet magnetic particle inspection (MT) and visual examination (VE) shall be carried out post
machining process.
Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service
NS 1 Page 4
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment
Once printed this specification becomes an uncontrolled copy of the online version.
MATRIX
Equipment Name: Cementing Tools
Specification: 05.12.00.1110
Manufacturer: General
Model/Type: Various
Material Group: Low Alloy
Service: Non-Sour
Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service
NS 1 Page 5
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment
Once printed this specification becomes an uncontrolled copy of the online version.
Appendices
Appendix 1
Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service
NS 1 Page 6
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment
Once printed this specification becomes an uncontrolled copy of the online version.
Appendix 2
Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service
NS 1 Page 7