Capacity
Peak Demand
Installed - 22,730 MW
Available - 14,458 MW
The country’s total peak demand in 2017 was recorded at 13,789 MW, which is 517 MW or 3.9% higher than the 13, 272 MW
in 2016. On the other hand, the total power supply, in terms of installed capacity, grew by 6.1% from 21,425 MW in 2016 to
22,730 MW in 2017. A total of 835 MW new capacities were added to the country’s supply base in 2017 which include coal-
fired (630 MW), solar (127 MW), oil-based (77 MW), and hydropower (1 MW). In terms of share by grid, Luzon contributed
392 MW or 47%, Mindanao at 337 MW or 40% and Visayas at 106 MW or 3%. The year also saw the end of the constrained
demand in Mindanao which grew by 6.5% or 107 MW from 1,653 MW in 2016 to 1,760 MW in 2017.
Philippine Power System continued to exhibit its resiliency and stakeholders’ unified actions in the onslaught of challenges
in 2017. Natural and man-made disasters hit some parts of the country, coupled with the continued concerns on forced
outages of large power generation plants, as well as the transmission and distribution system. The most notable of these is
the 6.5 magnitude earthquake in the Visayas (Jaro, Leyte) which occurred in the second half of 2017, damaging geothermal
power generation, transmission and distribution facilities, and resulted to the total loss of power in the provinces of Samar,
Leyte, and Bohol. In Mindanao, the Marawi Siege led to the multiple partial blackout in the franchise area of the Lanao Del
Sur Electric Cooperative (LASURECO) and total blackout in Marawi City. In view of these incidents, the DOE initiatives to
integrate in its plans, policies, and programs the energy resiliency, performance assessment of the power industry
participants to improve energy security and reliability were very timely.
The DOE published power-related development plans (Power Development Plan 2016-2040; Distribution Development Plan
2016-2025; and Missionary Electrification Development Plan 2016-2020) which laid down the basic data and information of
the Philippine Power System; power supply and demand outlook in grid and off-grid areas; and power sector roadmaps,
policies, and programs for the short-, medium- and long-term horizon. These serve as investors’ references in business
development in the country.
1|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
2017 POWER DEMAND AND SUPPLY HIGHLIGHTS
2016 vs. 2017 Peak Demand (in MW)
10,054
Luzon
9,726
1,975
Visayas
1,893
2017 2016
1,760
Mindanao
1,653
The country’s total peak demand in 2017 grew steadily by 3.9% or 517 MW from 13, 272 MW in 2016 to 13,789 MW in 2017.
Mindanao’s peak demand growth rate at 6.5% or 107 MW was the highest among the three grids. Total electricity
consumption likewise grew by 3.9% or 3,572,450 MWh, from 90,797,891 MWh in 2016 to 94,370,341 MWh in 2017. This
increase is largely attributed to the growth of the residential and industrial sectors which contributed 1.1 percentage points
to the overall growth rate. Expansion in the residential sector is associated with the increasing household electricity
consumption, rising income per capita, and intensification of household electrification, among others. Meanwhile, the high
industrialization target of the government boosted the performance of the industrial sector. Based on the 2017 National
Accounts, the industry sector grew by 7.2% fueled by the expansion in the manufacturing, and public construction
subsectors.1
26,782,033
Residential
25,631,254
22,767,981
Commercial
21,770,167
25,573,267
Industrial
24,116,820
2,669,529
Others
2,634,266
Own-Use
8,315,784 2017 2016
8,357,339
8,261,747
Systems Loss
8,288,045
1
2017 Full-year Economic Report Building on Resilience, Senate of the Philippines’ Economic Planning Office
2|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
2017 POWER DEMAND AND SUPPLY HIGHLIGHTS
2016 vs. 2017 Existing Installed, Dependable and Available Capacity (in MW)
Installed Dependable Available
Fuel Type
2016* 2017 2016* 2017 2016* 2017
Coal 7,419 8,049 6,979 7,674 5,391 6,773
Oil Based 3,616 4,154 2,821 3,287 2,041 2,282
Natural Gas 3,431 3,447 3,291 3,291 2,729 2,859
Renewable
6,959 7,080 6,004 6,263 4,297 4,314
Energy
Geothermal 1,916 1,916 1,689 1,752 1,300 1,339
Hydro 3,618 3,627 3,181 3,268 2,314 2,287
Biomass 233 224 157 160 112 101
Solar 765 886 594 700 431 513
Wind 427 427 383 383 140 74
TOTAL 21,425 22,730 19,095 20,515 14,458 16,228
*Grid only
The country’s total installed capacity grew by 6.1% from 21,425 MW in 2016
to 22,730 MW in 2017. This increase in capacity is brought about by the
100,000
94,370
90,798 commercial operation of large coal-fired power plants (630 MW) in Luzon
3% and Mindanao, a number of solar farms in Luzon and Visayas (127 MW),
90,000
3%
10%
9% and the entry of additional capacities from oil and hydro power plants (78
80,000
11% MW).
12%
70,000 The inclusion of off-grid power plants, primarily oil-based, solar, and hydro,
Generation (GWh)
also contributed to the increase in the total installed capacity for 2017. Off-
60,000
22% 22%
grid capacities constitute to about 2% or 465 MW of the total installed
50,000
4% capacity in 2017.
6%
*Grid only
40,000
On a per fuel-type basis, the share of coal to the total installed capacity
remains the largest at 36% (8,049 MW), followed by renewable energy at
201630,000
vs. 2017 Gross Power Generation (in GWh)
31% (7,079 MW), oil-based at 18% (4,153 MW), and natural gas at 15%
50%
20,000 48% (3,447 MW).
Meanwhile, power generation grew at a much lower pace at 3.9% from
10,000
90,798 GWh in 2016 to 94,370 GWh in 2017. Coal also remains the major
- source of electricity generation for Luzon, Visayas, and Mindanao with a
2016 2017
Year combined share of 50% (46,847,274 MWh).
Coal Oil-Based Natural Gas Committed capacities that will be coming in the pipeline are largely coal
Geothermal Hydro Biomass
Solar Wind power projects at 80% (5,190 MW), while the indicative capacities are
mainly renewables at 43% (7,518 MW).
Note: Some values may not correspond to the 2017 Power Statistics
and/or previous issuances due to rounding
3|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
2017 POWER DEMAND AND SUPPLY HIGHLIGHTS
2016 vs. 2017 Summary of Committed and Indicative Power Projects (in MW)*
4|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
2017 POWER DEMAND AND SUPPLY HIGHLIGHTS
Significant Incidents
Following are the significant incidents that affected the Philippine Power System
in 2017. These occurrences resulted to tight supply conditions, several automatic
load dropping incidents, issuance of yellow and red alert grid status, and power
interruptions, among others. A total of 4292 significant forced outages of power
generation plants were recorded in 2017. Meanwhile, 3 major earthquakes and 7
typhoons3 hit the country this year that caused significant damages to power
generation, transmission, and distribution facilities and infrastructure.
Transmission and
Forced Outages of
Distribution System
Power Generation Plants
Interruptions
Marawi Siege
Typhoons
(Mindanao)
2
Based on NGCP’s 2017 Grid Operating and Maintenance Program (GOMP)
3
Only includes natural disasters that significantly affected the power system in 2017
5|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
LUZON
15,000
5,000
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2017 2016
Source: NGCP
Electricity Sales and Consumption (in MWh) Luzon for 2017 reached a total of
69,624,603 MWh. This is 3.6% higher
than in 2016 at 67,220,596 MWh.
•
• • •
The residential and commercial sector
• 28% • 28% • 26% contributed the most to Luzon’s overall
• 19,626,457 • 19,600,604 • 18,028,994 growth rate at 1.0 percentage points
each.
6|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
LUZON
Existing Installed, Dependable and Available Capacity, January-December 2017 (in MW)
Renewable
4,156 26.40 3,757 26.05 2,395 20.93
Energy
Geothermal
8% 6,511 •Committed
6%
MW Projects
Coal
50%
Natural Gas
30%
17,444 •Indicative
Oil Based MW Projects
3%
7|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
LUZON
Committed Indicative
Type of Power Plant No. of No. of
Capacity (MW) % Share Capacity (MW) % Share
Proponents Proponents
Coal 8 5,190 79.70 9 6,660 38.20
Oil-Based 1 46 0.70 2 450 2.60
Natural Gas 1 650 10.00 4 2,816 16.10
Renewable Energy 36 625 9.60 57 7,518 43.10
Geothermal 2 43 0.70 1 130 0.70
Hydro 29 439 6.70 15 2,738 15.70
Biomass 4 50 0.80 10 114 0.70
Solar 1 93 1.40 25 3,260 18.70
Wind 0 0 0.00 6 1,276 7.30
2017 TOTAL 46 6,511 100.00 72 17,444 100.00
2016 TOTAL 19 3,528 100.00 72 12,076 100.0
Battery Storage* 1 10 2 230
* for accounting purposes; declared capacity for Ancillary Services (AS) to the system
8|D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
LUZON
Significant Grid Incidents
Shell Philippines Exploration B.V. (SPEX) conducted the Malampaya Gas Facility Scheduled Maintenance Shutdown
(SMS) on 28 January to 16 February 2017 which was safely completed ahead of the planned schedule. Despite this
SMS and the occurrence of forced outages of some major power plants, Luzon grid remained stable due to the low
demand during the period. During the SMS, Santa Rita, San Lorenzo and Avion Natural Gas-Fired Power Plants run on
liquid fuel while Ilijan Natural Gas-Fired Power Plant run on bio-diesel.
The 647 MW Sual Coal-Fired Power Plant (CFPP) Unit 2 went on forced outage on 14 June 2017 triggering an
Automatic Load Dropping (ALD) incident with recorded system frequency drop at 58.908 Hz. It was reported that the
primary cause of transformer failure was internal flash over on the high voltage (HV) winding which resulted to the
explosion of HV bushing. On-site repair was not recommended due to carbon deposits contamination all over the
internals. Sual CFPP Unit 2 went online on 10 November 2017.
Luzon grid experienced 11 yellow alerts and 2 red alerts brought about by forced outages of power plants, natural
disasters, and natural gas fuel restriction.
Luzon grid experienced 24 ALD for 2017. Most of ALDs occurred in the month of June with six (6) ALDs due to the
tripping of power plants with large capacities. On the average, most of the outages caused by the load dropping were
not sustained for more than 17 minutes.
Luzon grid experienced 7 major transmission system interruptions for 2017 brought about by system fault, disasters,
and line tripping. Some of the transmission system interruptions caused isolation and tripping of power plants.
Legend:
Typhoon
Earthquake
Manmade
Magnitude 5.6 and 6.0
earthquakes in Mabini, Batangas
on 8 April 2017 led to the outage of
Avion, Santa Rita, San Lorenzo,
San Gabriel and Ilijan Natutral Gas
9|D O E - E P I M B
Power Plants. 2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
2017 LUZON POWER DEMAND-SUPPLY SITUATION
10 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
VISAYAS
2,500
1,000
500
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2017 2016
Source: NGCP
• • •
11 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
VISAYAS
Existing Installed, Dependable and Available Capacity, January-December 2017 (in MW)
Renewable
1,641 47.88 1,454 48.42 1,128 46.79
Energy
3,399 •Indicative
Geothermal MW Projects
Oil Based
40%
4%
12 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
VISAYAS
Committed Indicative
Type of Power Plant No. of No. of
Capacity (MW) % Share Capacity (MW) % Share
Proponents Proponents
Coal 2 435 56.10 1 300 8.80
Oil-Based 1 8 1.00 4 96 2.80
Natural Gas 0 0 0.00 1 138 4.10
Renewable Energy 15 332 42.80 21 2,866 84.30
Geothermal 1 50 6.50 1 40 1.20
Hydro 3 103 13.30 3 622 18.30
Biomass 11 179 23.00 2 15 0.40
Solar 0 0 0.00 11 792 23.30
Wind 0 0 0.00 4 1,398 41.10
TOTAL 18 775 100.00 27 3,399 100.00
Battery Storage* 0 0 3 130
* for accounting purposes; declared capacity for Ancillary Services (AS) to the system
13 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
VISAYAS
For the first half of 2017, the power situation in the Visayas has been generally stable due to the additional capacities
that went on commercial operation. There are some instances where the Visayas grid experienced tight supply
conditions especially during the occurrence of simultaneous outages of large coal-fired and geothermal power plants.
However, during the second half of the year, natural disasters struck the Visayas region that damaged critical power
generation facilities, power lines and equipment especially in the areas of Samar-Leyte, Bohol, and Cebu.
o The occurrence of the 6.5 magnitude earthquake in Jaro, Leyte affected and damaged geothermal power
generation and transmission (HVDC, substations, towers, power lines) facilities that resulted to the total
loss of power in the Provinces of Samar, Leyte, and Bohol.
o Power was restored within the month of July in the affected areas but the various restoration activities of
the damaged facilities were carried out for the remainder of the year.
o Within the month of December, Typhoon Urduja heavily affected the Provinces of Samar and Leyte that
caused damages to power lines and steam lines of geothermal power plants.
o Restoration activities were carried out after the typhoon in order to repair the damages and restore the
output of the geothermal power plants.
Typhoon Urduja
Partial and total blackout in the
franchise areas of BILECO, DORELCO,
LEYECO III, LEYECO V, ESAMELCO,
NORSAMELCO and SAMELCO caused
by transmission and distribution line
outages
Legend:
Typhoon
Earthquake
Manmade
14 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
2017 VISAYAS POWER DEMAND-SUPPLY SITUATION
MW
15 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
MINDANAO
3,000
2,500
1,500 1,653
1,590 1,585 1,582 1,592 1,645 1,642
1,497 1,472 1,485 1,514 1,536
1,000
500
-
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
2017 2016
Source: NGCP
6
Gross Domestic Product of the Philippines Highlights for 2017, Philippine Statistics Authority (PSA)
16 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
MINDANAO
Existing Installed, Dependable and Available Capacity, January-December 2017 (in MW)
Renewable
1,283 36.06 1,052 34.12 791 33.34
Energy
1,332 •Committed
Hydro MW Projects
32%
Coal
53%
1,981 •Indicative
Oil Based MW Projects
Geothermal 7%
7%
17 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
MINDANAO
Capacity (MW)
Power Plant
Owner/ Operator
Facility Name Installed Dependable
Committed Indicative
Type of Power Plant No. of No. of
Capacity (MW) % Share Capacity (MW) % Share
Proponents Proponents
Coal 2 700 52.50 4 1,138 57.50
Oil-Based 4 30 2.20 4 45 2.30
Natural Gas 0 0 0.00 0 0 0.00
Renewable Energy 22 603 45.20 21 797 40.30
Geothermal 0 0 0.00 1 30 1.50
Hydro 19 591 44.30 5 268 13.50
Biomass 3 12 0.90 6 89 4.50
Solar 0 0 0.00 9 410 20.70
Wind 0 0 0.00 0 0 0.00
TOTAL 28 1,332 100.00 29 1,981 100.00
18 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
MINDANAO
On 04 May 2017 (1250H), Zamboanga Peninsula was on total blackout due to the tripping of the Baloi-Aurora 138 kV
Line. Agus 5 – Aurora 138 kV line which also serves the Zamboanga Peninsula was also on outage due to a line to
line fault. System was restored on the same day at 1700H.
On 14 May 2017 (2122H), Zamboanga Peninsula was on partial blackout due to the tripping of Agus 5 – Aurora 138
kV Line and Baloi – Aurora 138 kV Line.
On 25 May 2017 (1750H), Agus 2 – Agus 1 138 kV Tie Line tripped which resulted to the isolation of both Agus 1 HEP
and Agus 1 Substation rendering Marawi City without power.
On 1 October 2017, South Eastern Mindanao Area (SEMA) was on partial system blackout due to the tripping of
Davao – Toril 138 kV Lines 1 and 2 and Kibawe – Tacurong line at 2204H. At 2230H, Red Alert Status was declared
for the Mindanao Grid.
On 23 May 2017, the Marawi Seige started which resulted to the multiple and partial blackout of the franchise area
of LASURECO.
19 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
2017 MINDANAO POWER DEMAND-SUPPLY SITUATION
MW
20 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annexes
Annex 1. Philippine Historical Electricity Consumption and Peak Demand to GDP Elasticity, 2004-2017
Electricity Electricity Peak Electricity Peak
Electricity Electricity Peak GDP Electricity
Sales Consumption Demand GDP Growth Consumption Demand to
YEAR Sales Consumption Demand (2000=100) Sales to GDP
Growth Rate Growth Rate Growth Rate Rate (%) to GDP GDP
(MWh) (MWh) (MW) Million Pesos Elasticity
(%) (%) (%) Elasticity Elasticity
2004 44,075,958 55,957,430 8,525 4,276,941
2005 45,159,402 2.46 56,567,741 1.1 8,629 1.2 4,481,279 4.8 0.5 0.2 0.3
2006 45,672,173 1.14 56,784,130 0.4 8,760 1.5 4,716,231 5.2 0.2 0.1 0.3
2007 48,009,038 5.12 59,611,788 5.0 8,987 2.6 5,028,288 6.6 0.8 0.8 0.4
2008 49,206,114 2.49 60,820,985 2.0 9,054 0.7 5,237,099 4.2 0.6 0.5 0.2
2009 50,867,842 3.38 61,934,432 1.8 9,472 4.6 5,297,240 1.1 2.9 1.6 4.0
2010 55,265,769 8.65 67,742,759 9.4 10,375 9.5 5,701,539 7.6 1.1 1.2 1.2
2011 56,097,592 1.51 69,175,650 2.1 10,379 0.0 5,910,201 3.7 0.4 0.6 0.0
2012 59,210,619 5.55 72,922,011 5.4 10,761 3.7 6,305,229 6.7 0.8 0.8 0.6
2013 61,565,612 3.98 75,265,842 3.2 11,305 5.1 6,750,631 7.1 0.6 0.5 0.7
2014 63,344,784 2.89 77,260,997 2.7 11,822 4.6 7,170,414 6.2 0.5 0.4 0.7
2015 67,807,747 7.05 82,413,213 6.7 12,213 3.3 7,600,175 6.0 1.2 1.1 0.6
2016 74,154,224 9.36 90,797,891 10.2 13,272 8.7 8,122,741 6.9 1.4 1.5 1.3
2017 77,792,810 4.91 94,370,341 3.9 13,789 3.9 8,665,708 6.7 0.7 0.6 0.6
22 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 2. Luzon Historical Electricity Consumption and Peak Demand to GRDP Elasticity, 2004-2017
2005 33,791,038 2.3 42,562,730 0.4 6,443 1.9 3,265,801 5.0 0.5 0.1 0.4
2006 33,941,398 0.4 42,424,421 (0.3) 6,466 0.4 3,435,661 5.2 0.1 (0.1) 0.1
2007 35,434,885 4.4 44,339,741 4.5 6,643 2.7 3,663,711 6.6 0.7 0.7 0.4
2008 36,615,419 3.3 45,316,792 2.2 6,674 0.5 3,814,637 4.1 0.8 0.5 0.1
2009 37,859,434 3.4 45,635,225 0.7 6,928 3.8 3,861,247 1.2 2.8 0.6 3.1
2010 41,388,794 9.3 50,322,077 10.3 7,656 10.5 4,174,036 8.1 1.2 1.3 1.3
2011 41,706,246 0.8 50,964,688 1.3 7,552 (1.4) 4,308,393 3.2 0.2 0.4 (0.4)
2012 44,063,677 5.7 53,723,136 5.4 7,889 4.5 4,598,670 6.7 0.8 0.8 0.7
2013 45,803,175 3.9 55,735,785 3.7 8,305 5.3 4,942,077 7.5 0.5 0.5 0.7
2014 47,240,505 3.1 57,488,739 3.1 8,717 5.0 5,246,187 6.2 0.5 0.5 0.8
2015 50,589,323 7.1 61,099,345 6.3 8,928 2.4 5,562,372 6.0 1.2 1.0 0.4
2016 55,413,149 9.5 67,220,596 10.0 9,726 8.9 5,937,278 6.7 1.4 1.5 1.3
2017 58,247,445 5.1 69,624,603 3.6 10,054 3.4 6,339,714 6.8 0.8 0.5 0.5
23 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 3. Visayas Historical Electricity Consumption and Peak Demand to GRDP Elasticity, 2004-2017
2005 5,284,359 5.02 6,762,352 4.3 1,037 1.2 574,164 4.6 1.1 0.9 0.3
2006 5,551,408 5.05 6,945,759 2.7 1,066 2.8 602,538 4.9 1.0 0.5 0.6
2007 6,017,151 8.39 7,381,763 6.3 1,102 3.4 639,203 6.1 1.4 1.0 0.6
2008 5,961,193 (0.93) 7,532,437 2.0 1,176 6.7 666,315 4.2 (0.2) 0.5 1.6
2009 6,309,113 5.84 8,063,929 7.1 1,241 5.5 665,784 (0.1) (73.2) (88.6) (69.3)
2010 7,036,059 11.52 9,017,913 11.8 1,431 15.3 718,742 8.0 1.4 1.5 1.9
2011 7,224,369 2.68 9,508,314 5.4 1,481 3.5 759,128 5.6 0.5 1.0 0.6
2012 7,646,701 5.85 10,072,003 5.9 1,551 4.7 799,533 5.3 1.1 1.1 0.9
2013 7,867,617 2.89 10,183,326 1.1 1,572 1.4 844,313 5.6 0.5 0.2 0.2
2014 8,039,020 2.18 10,291,667 1.1 1,636 4.0 888,023 5.2 0.4 0.2 0.8
2015 8,765,247 9.03 11,184,002 8.7 1,768 8.1 941,627 6.0 1.5 1.4 1.3
2016 9,598,851 9.51 12,231,839 9.4 1,893 7.1 1,019,743 8.3 1.1 1.1 0.9
2017 10,048,775 4.69 12,941,701 5.8 1,975 4.3 1,076,671 5.6 0.8 1.0 0.8
24 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 4. Mindanao Historical Electricity Consumption and Peak Demand to GRDP Elasticity, 2004-2017
2005 6,084,005 1.07 7,242,659 2.2 1,149 (2.4) 641,314 3.8 0.3 0.6 (0.6)
2006 6,179,367 1.57 7,413,949 2.4 1,228 6.9 678,031 5.7 0.3 0.4 1.2
2007 6,557,002 6.11 7,890,283 6.4 1,241 1.1 725,374 7.0 0.9 0.9 0.2
2008 6,629,502 1.11 7,971,756 1.0 1,204 (3.0) 756,147 4.2 0.3 0.2 (0.7)
2009 6,699,295 1.05 8,235,278 3.3 1,303 8.3 770,209 1.9 0.6 1.8 4.4
2010 6,840,916 2.11 8,402,769 2.0 1,288 (1.2) 808,762 5.0 0.4 0.4 (0.2)
2011 7,166,977 4.77 8,702,648 3.6 1,346 4.5 842,680 4.2 1.1 0.9 1.1
2012 7,500,241 4.65 9,126,871 4.9 1,321 (1.9) 907,026 7.6 0.6 0.6 (0.2)
2013 7,894,820 5.26 9,346,731 2.4 1,428 8.1 964,241 6.3 0.8 0.4 1.3
2014 8,065,259 2.16 9,480,592 1.4 1,469 2.9 1,036,204 7.5 0.3 0.2 0.4
2015 8,453,177 4.81 10,129,866 6.8 1,517 3.3 1,096,176 5.8 0.8 1.2 0.6
2016 9,142,225 8.15 11,345,457 12.0 1,653 9.0 1,165,721 6.3 1.3 1.9 1.4
2017 9,496,590 3.88 11,804,037 4.0 1,760 6.5 1,249,323 7.2 0.5 0.6 0.9
25 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 5. Electricity Sales and Consumption by Sector, 2004-2017 (in GWh)
Philippines 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Residential 15,920 16,031 15,830 16,376 16,644 17,504 18,833 18,694 19,695 20,614 20,969 22,747 25,631 26,782
Commercial 11,785 12,245 12,679 13,470 14,136 14,756 16,261 16,624 17,777 18,304 18,761 20,085 21,770 22,768
Industrial 15,012 15,705 15,888 16,522 17,031 17,084 18,576 19,334 20,071 20,677 21,429 22,514 24,117 25,573
Others 1,359 1,177 1,275 1,641 1,395 1,523 1,596 1,446 1,668 1,971 2,186 2,462 2,634 2,670
Total Sales 44,076 45,159 45,672 48,009 49,206 50,868 55,266 56,098 59,211 61,566 63,345 67,808 74,153 77,793
Own-Use 4,654 4,591 4,227 3,994 3,935 3,524 4,677 5,398 5,351 5,959 6,461 7,124 8,357 8,316
System Loss 7,228 6,817 6,885 7,608 7,680 7,542 7,800 7,680 8,360 7,741 7,455 7,481 8,288 8,262
Total
55,957 56,568 56,784 59,612 60,821 61,934 67,743 69,176 72,922 75,266 77,261 82,413 90,798 94,370
Consumption
26 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 6. Electricity Sales and Consumption by Sector, per Grid, 2004-2017 (in GWh)
Luzon 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Residential 12,115 12,038 11,802 12,129 12,236 12,801 13,865 13,558 14,262 15,056 15,304 16,528 18,650 19,626
Commercial 10,138 10,495 10,865 11,503 12,066 12,519 13,684 13,975 14,905 15,510 16,103 17,272 18,727 19,601
Industrial 10,149 10,670 10,563 11,034 11,522 11,745 13,030 13,394 14,086 14,379 14,939 15,876 17,094 18,029
Others 623 589 712 768 792 794 809 779 810 859 895 913 942 991
Total Sales 33,025 33,791 33,941 35,435 36,615 37,859 41,389 41,706 44,064 45,803 47,241 50,589 55,413 58,247
Own-Use 3,856 3,738 3,444 3,141 3,069 2,666 3,729 4,114 3,952 4,550 5,040 5,598 6,518 5,940
System Loss 5,509 5,033 5,039 5,764 5,632 5,110 5,204 5,145 5,707 5,383 5,208 4,912 5,290 5,437
Total Consumption 42,390 42,563 42,424 44,340 45,317 45,635 50,322 50,965 53,723 55,736 57,489 61,099 67,221 69,625
Visayas 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Residential 1,873 1,999 2,036 2,157 2,208 2,341 2,523 2,527 2,668 2,735 2,770 3,068 3,508 3,615
Commercial 783 861 910 1,003 1,044 1,094 1,312 1,324 1,426 1,446 1,302 1,418 1,555 1,642
Industrial 1,999 2,104 2,340 2,402 2,416 2,562 2,770 3,038 3,032 3,137 3,214 3,268 3,470 3,590
Others 377 320 265 455 293 313 431 336 521 550 753 1,011 1,065 1,202
Total Sales 5,032 5,284 5,551 6,017 5,961 6,309 7,036 7,224 7,647 7,868 8,039 8,765 9,599 10,049
Own-Use 661 679 606 574 589 565 665 996 1,092 1,055 1,049 1,131 1,189 1,516
System Loss 788 799 788 790 982 1,190 1,317 1,288 1,333 1,260 1,204 1,288 1,444 1,377
Total Consumption 6,481 6,762 6,946 7,382 7,532 8,064 9,018 9,508 10,072 10,183 10,292 11,184 12,232 12,942
Mindanao 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Residential 1,933 1,995 1,992 2,089 2,200 2,362 2,445 2,609 2,765 2,823 2,895 3,151 3,473 3,541
Commercial 864 889 904 964 1,026 1,143 1,265 1,324 1,446 1,348 1,357 1,394 1,488 1,525
Industrial 2,864 2,931 2,985 3,086 3,092 2,778 2,776 2,902 2,954 3,161 3,275 3,370 3,552 3,955
Others 359 269 298 418 311 417 356 332 336 563 538 538 627 476
Total Sales 6,020 6,084 6,179 6,557 6,630 6,699 6,841 7,167 7,500 7,895 8,065 8,453 9,141 9,497
Own-Use 137 173 178 279 277 293 282 289 306 355 372 395 651 860
System Loss 931 985 1,057 1,054 1,065 1,243 1,280 1,247 1,320 1,097 1,044 1,281 1,554 1,448
Total Consumption 7,087 7,243 7,414 7,890 7,972 8,235 8,403 8,703 9,127 9,347 9,481 10,130 11,345 11,804
27 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 7. Annual System Peak Demand per Grid, 1985-2017 (in MW)
Total Non-
% % % %
Year Luzon Visayas Mindanao Coincident Peak
AAGR AAGR AAGR AAGR
(Max)
1985 2,311 256 470 3,037
1986 2,435 5.4 284 10.9 484 3.0 3,203 5.5
1987 2,592 6.4 307 8.1 533 10.1 3,432 7.1
1988 2,780 7.3 333 8.5 571 7.1 3,684 7.3
1989 2,938 5.7 354 6.3 617 8.1 3,909 6.1
1990 2,973 1.2 380 7.3 621 0.6 3,974 1.7
1991 3,045 2.4 410 7.9 626 0.8 4,081 2.7
1992 3,250 6.7 472 15.1 573 (8.5) 4,295 5.2
1993 3,473 6.9 512 8.5 691 20.6 4,676 8.9
1994 3,561 2.5 557 8.8 696 0.7 4,814 3.0
1995 3,920 10.1 628 12.7 780 12.1 5,328 10.7
1996 4,306 9.8 647 3.0 828 6.2 5,781 8.5
1997 4,773 10.8 725 12.1 852 2.9 6,350 9.8
1998 4,863 1.9 707 (2.5) 868 1.9 6,438 1.4
1999 4,986 2.5 729 3.1 892 2.8 6,607 2.6
2000 5,450 9.3 749 2.7 939 5.3 7,138 8.0
2001 5,646 3.6 898 19.9 953 1.5 7,497 5.0
2002 5,823 3.1 903 0.6 995 4.4 7,721 3.0
2003 6,149 5.6 995 10.2 1,131 13.7 8,275 7.2
2004 6,323 2.8 1,025 3.0 1,177 4.1 8,525 3.0
2005 6,443 1.9 1,037 1.2 1,149 (2.4) 8,629 1.2
2006 6,466 0.4 1,066 2.8 1,228 6.9 8,760 1.5
2007 6,643 2.7 1,102 3.4 1,241 1.1 8,987 2.6
2008 6,674 0.5 1,176 6.7 1,204 (3.0) 9,054 0.7
2009 6,928 3.8 1,241 5.5 1,303 8.3 9,472 4.6
2010 7,656 10.5 1,431 15.3 1,288 (1.2) 10,375 9.5
2011 7,552 (1.4) 1,481 3.5 1,346 4.5 10,379 0.0
2012 7,889 4.5 1,551 4.7 1,321 (1.9) 10,761 3.7
2013 8,305 5.3 1,572 1.4 1,428 8.1 11,305 5.1
2014 8,717 5.0 1,636 4.1 1,469 2.9 11,822 4.6
2015 8,928 2.4 1,768 8.1 1,517 3.3 12,213 3.3
2016 9,726 8.9 1,893 7.1 1,653 9.0 13,272 8.7
2017 10,054 3.4 1,975 4.3 1,760 6.5 13,789 3.9
28 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 8. Visayas Annual System Peak Demand per Sub-Grid, 1995-2017 (in MW)
LEYTE- TOTAL
Year CEBU % AAGR NEGROS % AAGR PANAY % AAGR % AAGR BOHOL % AAGR % AAGR
SAMAR VISAYAS
1995 248 113 88 116 21 586
1996 272 9.73 127 12.61 95 7.03 116 0.30 22 5.69 632 7.87
1997 291 7.10 141 10.66 114 20.76 152 30.41 24 7.17 722 14.15
1998 297 2.06 136 (3.70) 114 (0.47) 127 (15.96) 28 15.90 702 (2.79)
1999 333 12.16 152 12.03 81 (28.65) 126 (1.10) 30 8.66 722 2.97
2000 353 6.04 156 2.45 84 3.45 122 (3.25) 32 4.98 746 3.33
2001 377 6.65 151 (2.78) 146 73.92 156 28.09 31 (3.39) 861 15.33
2002 349 (7.40) 178 17.45 113 (22.39) 162 3.91 40 30.88 842 (2.16)
2003 422 20.97 179 0.94 105 (7.61) 175 7.93 41 3.28 923 9.54
2004 417 (1.14) 199 10.86 122 16.68 167 (4.52) 49 18.73 955 3.46
2005 438 4.94 195 (2.03) 120 (1.91) 168 0.65 46 (6.33) 967 1.28
2006 458 4.68 199 1.87 123 2.64 171 1.43 46 0.44 997 3.09
2007 477 4.12 209 5.11 182 48.20 186 8.76 49 5.42 1,102 10.61
2008 522 9.39 218 4.30 203 11.49 182 (2.21) 52 6.17 1,176 6.68
2009 559 7.07 215 (1.13) 223 9.91 188 3.49 56 7.77 1,241 5.52
2010 674 20.56 263 22.29 243 8.68 204 8.33 48 (14.21) 1,431 15.31
2011 704 4.44 245 (6.75) 260 7.25 209 2.81 62 30.83 1,481 3.50
2012 747 6.20 256 4.45 262 0.48 221 5.65 65 3.42 1,551 4.71
2013 780 4.41 253 (1.40) 272 3.82 199 (10.08) 63 (2.25) 1,567 1.01
2014 862 10.45 266 5.38 264 (2.72) 181 (8.74) 62 (2.23) 1,636 4.40
2015 850 (1.34) 309 15.92 309 16.84 230 26.54 70 14.18 1,768 8.09
2016 936 10.09 316 2.17 331 7.12 241 4.96 69 (1.69) 1,893 7.05
2017 976 4.29 331 5.05 385 16.25 270 12.08 84 21.94 2,047 8.15
29 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 9. Luzon Monthly System Peak Demand, 2004-2017 (in MW)
LUZON
MONTH
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
JAN 5,511 5,471 5,619 5,819 5,972 6,118 6,407 6,594 7,027 7,079 7,121 7,315 8,175 8,249
FEB 5,701 5,853 5,776 6,115 6,094 6,452 6,878 6,877 7,162 7,214 7,545 7,610 8,229 8,668
MAR 6,065 6,210 6,186 6,157 6,211 6,642 7,057 7,006 7,503 7,720 7,655 7,878 8,806 9,459
APR 6,218 6,266 6,222 6,581 6,663 6,845 7,305 7,056 7,885 8,178 8,267 8,727 9,586 9,831
MAY 6,323 6,443 6,466 6,643 6,485 6,829 7,656 7,538 7,889 8,305 8,717 8,928 9,726 10,054
JUN 5,978 6,348 6,339 6,619 6,674 6,928 7,646 7,552 7,709 8,208 8,607 8,881 9,507 10,000
JUL 6,061 6,039 6,221 6,464 6,559 6,848 7,240 7,438 7,574 8,030 8,265 8,826 9,339 9,588
AUG 5,906 6,107 6,094 6,369 6,403 6,863 7,009 7,200 7,242 7,755 8,230 8,889 9,379 9,957
SEP 6,097 5,998 6,195 6,416 6,496 6,873 7,057 7,107 7,293 7,966 8,005 8,738 9,082 9,806
OCT 5,916 5,843 5,845 6,155 6,627 6,530 7,074 7,255 7,421 7,564 7,993 8,624 9,005 9,483
NOV 5,987 5,889 5,974 6,137 6,492 6,662 6,851 7,223 7,425 7,488 8,033 8,498 8,900 9,590
DEC 5,900 5,910 5,813 6,195 6,376 6,575 6,946 7,178 7,395 7,670 7,996 8,487 8,774 9,441
MAX 6,323 6,443 6,466 6,643 6,674 6,928 7,656 7,552 7,889 8,305 8,717 8,928 9,726 10,054
30 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 10. Visayas Monthly System Peak Demand, 2004-2017 (in MW)
VISAYAS
MONTH
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
JAN 866 890 906 946 1,067 1,122 1,219 1,324 1,391 1,463 1,331 1,476 1,693 1,804
FEB 839 892 929 969 1,069 1,159 1,199 1,356 1,386 1,446 1,362 1,479 1,669 1,747
MAR 878 899 949 972 1,092 1,166 1,254 1,370 1,370 1,528 1,411 1,528 1,749 1,829
APR 889 916 964 1,007 1,112 1,193 1,308 1,431 1,447 1,548 1,499 1,630 1,846 1,914
MAY 896 928 968 1,015 1,090 1,204 1,364 1,405 1,464 1,572 1,606 1,618 1,893 1,933
JUN 857 926 961 1,078 1,089 1,204 1,344 1,399 1,449 1,555 1,636 1,562 1,831 1,935
JUL 880 931 977 1,090 1,105 1,201 1,323 1,398 1,440 1,543 1,511 1,584 1,819 1,869
AUG 889 919 951 1,100 1,127 1,214 1,310 1,415 1,480 1,207 1,579 1,596 1,825 1,965
SEP 894 911 976 1,094 1,128 1,206 1,341 1,414 1,456 1,547 1,528 1,625 1,817 1,936
OCT 904 917 967 1,088 1,174 1,215 1,333 1,435 1,489 1,520 1,517 1,705 1,823 1,953
NOV 952 943 984 1,101 1,176 1,241 1,402 1,462 1,502 1,518 1,610 1,768 1,838 1,975
DEC 955 967 997 1,102 1,165 1,231 1,431 1,481 1,551 1,350 1,526 1,727 1,859 1,957
MAX 955 967 997 1,102 1,176 1,241 1,431 1,481 1,551 1,572 1,636 1,768 1,893 1,975
31 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 11. Mindanao Monthly System Peak Demand, 2004-2017 (in MW)
MINDANAO
MONTH
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
1,058 1,082 1,062 1,108 1,158 1,143 1,240 1,250 1,270 1,284 1,354 1,387
JAN 1,497 1,589
FEB 1,044 1,082 1,077 1,141 1,146 1,163 1,180 1,231 1,191 1,244 1,351 1,380 1,472 1,613
MAR 1,027 1,082 1,088 1,177 1,162 1,158 1,026 1,219 1,244 1,245 1,344 1,370 1,485 1,633
APR 1,051 1,087 1,090 1,167 1,190 1,186 1,009 1,253 1,232 1,226 1,310 1,406 1,514 1,697
MAY 1,099 1,055 1,118 1,109 1,159 1,194 1,211 1,253 1,301 1,366 1,339 1,438 1,590 1,692
JUN 1,035 1,072 1,100 1,145 1,188 1,220 1,238 1,264 1,309 1,364 1,416 1,435 1,585 1,675
JUL 1,025 1,045 1,093 1,141 1,163 1,198 1,214 1,298 1,289 1,384 1,390 1,397 1,536 1,624
AUG 1,086 1,061 1,119 1,141 1,147 1,208 1,221 1,290 1,306 1,326 1,386 1,446 1,582 1,705
SEP 1,102 1,078 1,090 1,203 1,163 1,217 1,235 1,288 1,268 1,256 1,391 1,453 1,592 1,708
OCT 1,134 1,122 1,130 1,193 1,156 1,292 1,263 1,290 1,319 1,219 1,441 1,507 1,645 1,699
NOV 1,155 1,149 1,147 1,158 1,204 1,303 1,286 1,326 1,321 1,397 1,469 1,517 1,642 1,726
DEC 1,177 1,105 1,228 1,241 1,175 1,282 1,288 1,346 1,318 1,428 1,453 1,510 1,653 1,760
MAX 1,177 1,149 1,228 1,241 1,204 1,303 1,288 1,346 1,321 1,428 1,469 1,517 1,653 1,760
32 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 12. Philippine Installed and Dependable Capacity by Plant Type, 2004-2017
Installed Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 3,967 3,967 4,177 4,213 4,213 4,277 4,867 4,917 5,568 5,568 5,708 5,963 7,419 8,049
Oil-Based 3,669 3,663 3,602 3,616 3,353 3,193 3,193 2,994 3,074 3,353 3,476 3,610 3,616 4,153
Natural Gas 2,763 2,763 2,763 2,834 2,831 2,831 2,861 2,861 2,862 2,862 2,862 2,862 3,431 3,447
Renewable Energy 5,149 5,226 5,261 5,277 5,284 5,309 5,437 5,391 5,521 5,541 5,898 6,330 6,958 7,079
Geothermal 1,932 1,978 1,978 1,958 1,958 1,953 1,966 1,783 1,848 1,868 1,918 1,917 1,916 1,916
Hydro 3,217 3,222 3,257 3,293 3,291 3,291 3,400 3,491 3,521 3,521 3,543 3,600 3,618 3,627
Biomass 0 0 0 0 0 30 38 83 119 119 131 221 233 224
Solar 0 1 1 1 1 1 1 1 1 1 23 165 765 885
Wind 0 25 25 25 33 33 33 33 33 33 283 427 427 427
Total Installed
15,548 15,619 15,803 15,941 15,681 15,610 16,358 16,162 17,025 17,325 17,944 18,765 21,423 22,728
Capacity
Dependable Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 3,696 3,432 3,638 3,467 3,412 3,813 4,245 4,651 5,206 5,206 5,378 5,613 6,979 7,674
Oil-Based 3,216 3,043 2,878 2,670 2,702 2,528 2,488 2,579 2,561 2,846 2,692 2,734 2,821 3,286
Natural Gas 2,703 2,703 2,703 2,703 2,562 2,700 2,756 2,770 2,760 2,760 2,760 2,759 3,291 3,291
Renewable Energy 4,178 4,417 4,419 4,639 4,372 4,278 4,413 4,477 4,539 4,559 4,789 5,325 6,005 6,264
Geothermal 1,568 1,683 1,683 1,667 1,388 1,321 1,351 1,434 1,462 1,482 1,607 1,601 1,689 1,752
Hydro 2,610 2,723 2,726 2,962 2,950 2,914 3,021 2,963 2,983 2,983 2,982 3,073 3,181 3,269
Biomass 0 0 0 0 0 10 20 46 76 76 81 146 157 160
Solar 0 1 1 1 1 1 1 1 0 0 17 125 594 700
Wind 0 9 9 9 33 33 20 33 17 17 103 379 383 383
Total Dependable
13,792 13,595 13,638 13,479 13,049 13,319 13,902 14,477 15,066 15,371 15,620 16,432 19,097 20,515
Capacity
33 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 13. Luzon Installed and Dependable Capacity by Plant Type, 2004-2017
Installed Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 3,769 3,769 3,769 3,783 3,783 3,849 3,849 3,879 4,531 4,531 4,671 4,812 5,294 5,625
Oil-Based 2,514 2,404 2,333 2,363 2,100 1,984 1,984 1,757 1,778 2,020 2,033 2,133 2,133 2,518
Natural Gas 2,763 2,763 2,763 2,834 2,831 2,831 2,861 2,861 2,861 2,861 2,861 2,861 3,430 3,446
Renewable Energy 3,115 3,192 3,226 3,194 3,199 3,199 3,287 3,242 3,358 3,378 3,649 3,863 4,120 4,156
Geothermal 907 954 954 886 886 886 899 751 824 844 844 844 843 843
Hydro 2,208 2,213 2,247 2,284 2,281 2,280 2,346 2,440 2,462 2,462 2,471 2,528 2,537 2,527
Biomass 0 0 0 0 0 1 9 17 38 38 50 83 95 87
Solar 0 0 0 0 0 0 0 0 0 0 0 70 307 362
Wind 0 25 25 25 33 33 33 33 33 33 283 337 337 337
Total Installed
12,162 12,128 12,092 12,174 11,913 11,863 11,981 11,739 12,528 12,790 13,213 13,668 14,977 15,743
Capacity
Dependable Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 3,551 3,287 3,287 3,112 3,056 3,450 3,531 3,664 4,219 4,219 4,391 4,512 4,970 5,404
Oil-Based 2,236 2,059 1,928 1,713 1,742 1,617 1,586 1,633 1,586 1,736 1,507 1,585 1,655 1,977
Natural Gas 2,703 2,703 2,703 2,703 2,562 2,700 2,756 2,770 2,759 2,759 2,759 2,759 3,291 3,291
Renewable Energy 2,381 2,547 2,548 2,783 2,507 2,464 2,626 2,757 2,785 2,805 2,965 3,322 3,684 3,758
Geothermal 604 727 726 714 439 431 500 587 587 607 692 691 777 782
Hydro 1,778 1,811 1,813 2,059 2,035 1,999 2,101 2,124 2,147 2,147 2,131 2,224 2,323 2,351
Biomass 0 0 0 0 0 1 5 13 34 34 39 60 71 66
Solar 0 0 0 0 0 0 0 0 0 0 0 54 220 265
Wind 0 9 9 9 33 33 20 33 17 17 103 293 293 293
Total Dependable
10,871 10,596 10,466 10,311 9,868 10,230 10,498 10,824 11,349 11,519 11,622 12,179 13,600 14,430
Capacity
34 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 14. Visayas Installed and Dependable Capacity by Plant Type, 2004-2017
Installed Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 198 198 198 198 198 196 786 806 806 806 806 769 1,054 1,054
Oil-Based 596 668 678 659 659 615 615 615 670 670 670 670 655 730
Natural Gas 0 0 0 0 0 0 0 0 1 1 1 1 1 1
Renewable Energy 927 927 927 976 977 1,007 1,006 981 971 971 1,043 1,242 1,574 1,640
Geothermal 916 916 916 964 964 964 964 923 915 915 965 965 965 965
Hydro 12 12 12 12 13 13 13 13 11 11 11 11 20 20
Biomass 0 0 0 0 0 29 29 44 44 44 44 101 101 101
Solar 0 0 0 0 0 0 0 0 0 0 22 75 399 465
Wind 0 0 0 0 0 0 0 0 0 0 0 90 90 90
Total Installed
1,721 1,793 1,803 1,833 1,835 1,818 2,407 2,402 2,448 2,448 2,520 2,683 3,284 3,425
Capacity
Dependable Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 145 145 140 155 155 153 501 777 777 777 777 761 1,050 1,050
Oil-Based 507 493 459 479 482 426 464 476 505 505 505 425 434 499
Natural Gas 0 0 0 0 0 0 0 0 1 1 1 0 0 0
Renewable Energy 868 868 868 865 862 813 779 784 820 820 877 1,042 1,329 1,454
Geothermal 856 856 856 853 849 792 751 745 777 777 817 813 813 870
Hydro 12 12 12 12 13 13 13 13 11 11 11 11 18 18
Biomass 0 0 0 0 0 9 15 26 32 32 32 77 77 84
Solar 0 0 0 0 0 0 0 0 0 0 17 56 331 392
Wind 0 0 0 0 0 0 0 0 0 0 0 86 90 90
Total Dependable
1,520 1,506 1,467 1,498 1,499 1,392 1,745 2,037 2,103 2,103 2,160 2,228 2,813 3,002
Capacity
35 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 15. Mindanao Installed and Dependable Capacity by Plant Type, 2004-2017
Installed Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 0 0 210 232 232 232 232 232 232 232 232 382 1,070 1,370
Oil-Based 559 591 591 594 594 594 594 622 625 663 773 807 828 906
Natural Gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Renewable Energy 1,106 1,107 1,107 1,107 1,107 1,103 1,145 1,168 1,192 1,192 1,206 1,225 1,264 1,284
Geothermal 108 108 108 108 108 103 103 108 108 108 108 108 108 108
Hydro 998 998 998 998 998 998 1,040 1,038 1,047 1,047 1,061 1,061 1,061 1,080
Biomass 0 0 0 0 0 0 0 21 36 36 36 36 36 36
Solar 0 1 1 1 1 1 1 1 1 1 1 20 59 59
Wind 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Installed
1,665 1,698 1,908 1,933 1,933 1,929 1,971 2,022 2,049 2,087 2,211 2,414 3,162 3,559
Capacity
Dependable Capacity
Plant Type
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 0 0 210 200 201 210 212 210 210 210 210 340 959 1,220
Oil-Based 473 491 491 478 478 485 438 469 470 605 680 724 733 811
Natural Gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Renewable Energy 929 1,002 1,004 992 1,003 1,001 1,008 937 934 934 948 961 993 1,052
Geothermal 108 100 101 100 100 98 100 102 98 98 98 98 100 100
Hydro 821 901 902 891 902 902 907 827 826 826 840 837 840 899
Biomass 0 0 0 0 0 0 0 7 10 10 10 10 10 10
Solar 0 1 1 1 1 1 1 1 0 0 0 15 43 43
Wind 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Dependable
1,402 1,493 1,705 1,670 1,682 1,697 1,658 1,616 1,614 1,749 1,838 2,025 2,684 3,083
Capacity
36 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 16. Philippine Gross Generation by Plant Type, 2004-2017 (in GWh)
PHILIPPINES by
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Plant Type
Coal 16,194 15,257 15,294 16,837 15,749 16,476 23,301 25,342 28,265 32,081 33,054 36,686 43,303 46,847
Oil-based 8,504 6,141 4,665 5,148 4,868 5,381 7,101 3,398 4,254 4,491 5,708 5,886 5,661 3,787
Combined Cycle 738 91 239 653 513 639 1,202 124 227 247 515 276 694 405
Diesel 6,253 5,717 4,152 4,162 3,660 3,771 4,532 2,762 3,332 3,805 4,730 5,521 4,722 3,100
Gas Turbine 82 25 0 9 36 62 3 0 0 0 0 10 0 0
Oil Thermal 1,431 309 274 324 658 909 1,364 512 695 438 463 80 245 282
Natural Gas 12,384 16,861 16,366 18,789 19,576 19,887 19,518 20,591 19,642 18,791 18,690 18,878 19,854 20,547
Renewable Energy 18,874 18,308 20,459 18,837 20,628 20,191 17,823 19,845 20,762 19,903 19,810 20,963 21,979 23,189
Geothermal 10,282 9,902 10,465 10,215 10,723 10,324 9,929 9,942 10,250 9,605 10,308 11,044 11,070 10,270
Hydro 8,593 8,387 9,939 8,563 9,843 9,788 7,803 9,698 10,252 10,019 9,137 8,665 8,111 9,611
Biomass 0 0 0 0 0 14 27 115 183 212 196 367 726 1,013
Solar 0 2 1 1 1 1 1 1 1 1 17 139 1,097 1,201
Wind 0 17 53 58 61 64 62 88 75 66 152 748 975 1,094
Total Generation 55,957 56,568 56,784 59,612 60,821 61,934 67,743 69,176 72,922 75,266 77,261 82,413 90,798 94,370
37 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 17. Luzon, Visayas and Mindanao Gross Generation by Plant Type, 2004-2017 (in GWh)
LUZON 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 15,548 14,653 14,099 14,418 13,504 14,091 20,047 19,681 21,878 25,756 27,346 29,680 33,143 33,953
Oil-based 4,591 2,022 1,711 2,192 1,928 1,864 3,287 1,291 1,800 1,601 2,342 1,845 2,562 2,379
Combined Cycle 738 91 239 653 513 639 1,202 124 227 247 515 276 694 405
Diesel 2,688 1,911 1,315 1,348 953 595 1,003 890 1,099 1,183 1,521 1,483 1,623 1,692
Gas Turbine 0 1 0 0 0 0 0 0 0 0 0 10 0 0
Oil Thermal 1,164 19 157 191 462 631 1,082 277 474 170 307 75 245 282
Natural Gas 12,384 16,861 16,366 18,789 19,576 19,887 19,518 20,591 19,642 18,783 18,686 18,878 19,854 20,547
Renewable Energy 7,330 7,091 9,065 8,221 9,192 9,132 7,413 8,454 8,993 8,679 8,392 9,711 10,938 11,633
Geothermal 3,033 2,742 3,519 3,601 3,730 3,516 3,323 3,486 3,588 3,399 3,817 4,096 4,227 3,910
Hydro 4,297 4,331 5,492 4,562 5,400 5,549 4,014 4,836 5,292 5,156 4,357 4,769 5,011 5,730
Biomass 0 0 0 0 0 3 14 44 37 60 65 187 439 599
Solar 0 0 0 0 0 0 0 0 0 0 0 66 495 496
Wind 0 17 53 58 61 64 62 88 75 66 152 592 767 899
Total Generation 39,854 40,627 41,241 43,620 44,200 44,975 50,265 50,017 52,312 54,820 56,766 60,113 66,498 68,512
VISAYAS 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 646 604 719 848 746 822 1,529 4,032 4,701 4,690 4,449 4,968 5,270 6,624
Oil-based 1,998 1,800 1,282 1,477 1,665 1,864 1,727 683 734 796 766 672 637 541
Diesel 1,649 1,486 1,166 1,335 1,433 1,554 1,446 449 514 529 615 672 637 541
Gas Turbine 82 24 0 9 36 62 3 0 0 0 0 0 0 0
Oil Thermal 266 290 116 133 196 248 277 235 220 268 151 0 0 0
Natural Gas 0 0 0 0 0 0 0 0 0 8 4 0 0 0
Renewable Energy 6,373 6,295 6,128 5,776 6,239 6,038 5,820 5,740 6,047 5,606 5,794 6,530 7,047 6,889
Geothermal 6,338 6,267 6,100 5,747 6,199 5,985 5,771 5,616 5,930 5,463 5,627 6,105 5,974 5,564
Hydro 34 27 28 29 40 42 36 53 46 37 35 38 64 90
Biomass 0 0 0 0 0 11 13 72 71 106 117 159 276 414
Solar 0 0 0 0 0 0 0 0 0 0 15 71 525 627
Wind 0 0 0 0 0 0 0 0 0 0 0 157 209 194
Total Generation 9,016 8,698 8,129 8,102 8,650 8,724 9,075 10,456 11,483 11,100 11,014 12,170 12,955 14,054
38 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 17. Luzon, Visayas and Mindanao Gross Generation by Plant Type, 2004-2017 (in GWh)
MINDANAO 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Coal 0 0 476 1,571 1,499 1,563 1,726 1,629 1,686 1,635 1,258 2,038 4,890 6,271
Oil-based 1,916 2,320 1,672 1,479 1,275 1,652 2,087 1,424 1,720 2,094 2,599 3,369 2,462 867
Diesel 1,916 2,320 1,671 1,479 1,275 1,623 2,082 1,423 1,719 2,093 2,595 3,365 2,462 867
Oil Thermal 0 0 0 0 0 30 5 0 1 1 4 4 0 0
Natural Gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Renewable Energy 5,171 4,923 5,266 4,841 5,197 5,020 4,590 5,650 5,721 5,618 5,624 4,723 3,994 4,666
Geothermal 910 893 846 867 794 823 834 841 731 743 864 842 869 797
Hydro 4,262 4,028 4,419 3,972 4,402 4,196 3,754 4,808 4,913 4,827 4,745 3,858 3,036 3,791
Biomass 0 0 0 0 0 0 0 0 75 47 14 21 11 0
Solar 0 2 1 1 1 1 1 1 1 1 1 2 77 78
Wind 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Generation 7,087 7,243 7,414 7,890 7,972 8,235 8,403 8,703 9,127 9,347 9,481 10,130 11,345 11,804
39 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 18. Visayas Subgrid Gross Generation by Plant Type, 2007-2017 (in GWh)
SUBGRID 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
CEBU 1,567 1,647 1,902 2,434 3,651 4,158 4,197 3,811 4,154 4,209 4,560
Coal 848 746 822 1,499 3,249 3,674 3,652 3,354 3,868 3,915 4,192
Oil-based 714 895 1,074 930 395 477 532 448 282 253 286
Diesel 572 663 764 650 161 257 264 297 282 253 286
Gas Turbine 9 36 62 3 0 0 0 0 0 0 0
Oil Thermal 133 196 248 277 235 220 268 151 0 0 0
Natural Gas 0 0 0 0 0 0 8 4 0 0 0
Renewable Energy (RE) 5 6 6 5 6 7 5 4 4 41 83
Geothermal 0 0 0 0 0 0 0 0 0 0 0
Hydro 5 6 6 5 6 7 5 4 4 3 5
Biomass 0 0 0 0 0 0 0 0 0 0 0
Solar 0 0 0 0 0 0 0 0 0 38 78
Wind 0 0 0 0 0 0 0 0 0 0 0
NEGROS 1,460 1,344 1,356 1,425 1,452 1,600 1,552 1,743 1,940 2,437 2,446
Coal 0 0 0 0 0 0 0 0 0 0 0
Oil-based 0 0 0 0 0 0 0 0 0 9 14
Diesel 0 0 0 0 0 0 0 0 0 9 14
Gas Turbine 0 0 0 0 0 0 0 0 0 0 0
Oil Thermal 0 0 0 0 0 0 0 0 0 0 0
Natural Gas 0 0 0 0 0 0 0 0 0 0 0
Renewable Energy (RE) 1,460 1,344 1,356 1,425 1,452 1,600 1,552 1,743 1,940 2,428 2,432
Geothermal 1,458 1,343 1,344 1,411 1,404 1,572 1,491 1,657 1,767 1,797 1,612
Hydro 2 2 1 2 2 0 0 0 0 8 4
Biomass 0 0 11 13 47 28 62 70 131 233 372
Solar 0 0 0 0 0 0 0 15 42 390 445
Wind 0 0 0 0 0 0 0 0 0 0 0
PANAY 728 725 744 787 1,043 1,266 1,284 1,393 1,597 1,920 2,844
Coal 0 0 0 30 783 1,027 1,037 1,095 1,101 1,356 2,432
Oil-based 728 725 744 757 235 197 202 251 312 280 131
40 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 18. Visayas Subgrid Gross Generation by Plant Type, 2007-2017 (in GWh)
SUBGRID 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Diesel 728 725 744 757 235 197 202 251 312 280 131
Gas Turbine 0 0 0 0 0 0 0 0 0 0 0
Oil Thermal 0 0 0 0 0 0 0 0 0 0 0
Natural Gas 0 0 0 0 0 0 0 0 0 0 0
Renewable Energy (RE) 0 0 0 0 25 43 44 46 185 284 281
Geothermal 0 0 0 0 0 0 0 0 0 0 0
Hydro 0 0 0 0 0 0 0 0 0 28 35
Biomass 0 0 0 0 25 43 44 46 28 43 43
Solar 0 0 0 0 0 0 0 0 0 5 8
Wind 0 0 0 0 0 0 0 0 157 209 194
LEYTE-SAMAR 4,290 4,858 4,643 4,362 4,212 4,358 3,972 3,970 4,367 4,270 4,048
Coal 0 0 0 0 0 0 0 0 0 0 0
Oil-based 0 0 0 0 0 0 0 0 0 0 0
Diesel 0 0 0 0 0 0 0 0 0 0 0
Gas Turbine 0 0 0 0 0 0 0 0 0 0 0
Oil Thermal 0 0 0 0 0 0 0 0 0 0 0
Natural Gas 0 0 0 0 0 0 0 0 0 0 0
Renewable Energy (RE) 4,290 4,858 4,643 4,362 4,212 4,358 3,972 3,970 4,367 4,270 4,048
Geothermal 4,289 4,857 4,641 4,361 4,212 4,358 3,972 3,970 4,339 4,178 3,952
Hydro 1 2 2 1 0 0 0 0 0 0 0
Biomass 0 0 0 0 0 0 0 0 0 0 0
Solar 0 0 0 0 0 0 0 0 28 92 96
Wind 0 0 0 0 0 0 0 0 0 0 0
BOHOL 33 50 54 38 49 45 38 43 45 41 68
Coal 0 0 0 0 0 0 0 0 0 0 0
Oil-based 11 20 20 10 4 6 6 12 11 16 22
Diesel 11 20 20 10 4 6 6 12 11 16 22
Gas Turbine 0 0 0 0 0 0 0 0 0 0 0
Oil Thermal 0 0 0 0 0 0 0 0 0 0 0
Natural Gas 0 0 0 0 0 0 0 0 0 0 0
Renewable Energy (RE) 21 30 33 28 45 39 32 31 34 24 46
Geothermal 0 0 0 0 0 0 0 0 0 0 0
41 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 18. Visayas Subgrid Gross Generation by Plant Type, 2007-2017 (in GWh)
SUBGRID 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Hydro 21 30 33 28 45 39 32 31 34 24 46
Biomass 0 0 0 0 0 0 0 0 0 0 0
Solar 0 0 0 0 0 0 0 0 0 0 0
Wind 0 0 0 0 0 0 0 0 0 0 0
Hydro 21 30 33 28 45 39 32 31 34 24 46
Biomass 0 0 0 0 0 0 0 0 0 0 0
Solar 0 0 0 0 0 0 0 0 0 0 0
Wind 0 0 0 0 0 0 0 0 0 0 0
Summary per Visayas
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Subgrid
CEBU 1,567 1,647 1,902 2,434 3,651 4,158 4,197 3,811 4,154 4,209 4,560
NEGROS 1,460 1,344 1,356 1,425 1,452 1,600 1,552 1,743 1,940 2,437 2,446
PANAY 728 725 744 787 1,043 1,266 1,284 1,393 1,597 1,920 2,844
LEYTE-SAMAR 4,290 4,858 4,643 4,362 4,212 4,358 3,972 3,970 4,367 4,270 4,048
BOHOL 33 50 54 38 49 45 38 43 45 41 68
Total Visayas w/o SPUG 8,077 8,625 8,698 9,046 10,407 11,428 11,043 10,959 12,103 12,875 13,966
SPUG 24 25 26 30 49 55 56 55 67 80 88
Total Visayas w/ SPUG 8,102 8,650 8,724 9,075 10,456 11,483 11,100 11,014 12,170 12,955 14,054
42 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 19. Gross Power Generation by Ownership, 2004-2017 (in GWh)
Total PHILIPPINES 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
NPC 16,431 15,318 16,792 15,151 12,743 9,745 4,053 5,142 5,241 5,035 4,692 3,759 2,715 3,346
NPC-SPUG 395 462 507 437 448 474 522 543 466 423 416 405 440 411
NPC-IPP 25,133 24,717 23,173 26,156 27,972 27,400 14,725 9,536 9,875 8,912 8,382 8,747 7,223 6,968
Non-NPC 13,999 16,071 16,312 17,867 19,658 24,315 48,442 53,955 57,340 60,895 63,770 69,501 80,420 83,646
Total Generation 55,957 56,568 56,784 59,612 60,821 61,934 67,743 69,176 72,922 75,266 77,261 82,413 90,798 94,370
LUZON 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
NPC 9,816 8,941 10,151 8,754 6,018 3,834 225 527 514 474 212 243 0 0
NPC-SPUG 308 348 396 323 330 347 380 381 314 263 250 236 252 207
NPC-IPP 17,388 16,802 15,698 18,187 19,591 18,598 6,691 2,160 2,285 2,069 1,973 1,575 2,041 2,231
Non-NPC 12,342 14,535 14,997 16,357 18,260 22,195 42,969 46,949 49,200 52,014 54,332 58,059 64,205 66,075
Total Generation 39,854 40,627 41,241 43,620 44,200 44,975 50,265 50,017 52,312 54,820 56,766 60,113 66,498 68,512
VISAYAS 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
NPC 2,384 2,406 2,285 2,380 2,332 1,690 176 43 35 30 21 0 0 0
NPC-SPUG 26 35 28 24 25 26 30 49 32 33 34 22 23 27
NPC-IPP 4,987 4,783 4,568 4,255 4,983 4,967 4,482 4,174 4,274 3,581 3,364 3,576 3,454 3,378
Non-NPC 1,619 1,474 1,248 1,443 1,310 2,042 4,387 6,191 7,142 7,455 7,595 8,572 9,477 10,648
Total Generation 9,016 8,698 8,129 8,102 8,650 8,724 9,075 10,456 11,483 11,100 11,014 12,170 12,955 14,054
MINDANAO 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
NPC 4,231 3,971 4,356 4,017 4,393 4,221 3,652 4,572 4,692 4,531 4,458 3,516 2,715 3,346
NPC-SPUG 61 80 83 90 93 101 113 113 121 128 132 147 165 176
NPC-IPP 2,757 3,131 2,907 3,715 3,398 3,834 3,551 3,202 3,316 3,262 3,046 3,596 1,728 1,359
Non-NPC 38 61 67 68 88 79 1,086 815 998 1,426 1,844 2,870 6,738 6,923
Total Generation 7,087 7,243 7,414 7,890 7,972 8,235 8,403 8,703 9,127 9,347 9,481 10,130 11,345 11,804
NPC – National Power Corporation; SPUG-Small Power Utilities Group; IPP-Independent Power Producer
43 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
COAL 5,190
Limay Power Plant SMC Consolidated Brgy. Lamao, Limay, Unit 3 - December 2017 Unit 3 - March 2018
300
Project Phase II Power Corporation Bataan Unit 4 - August 2019 Unit 4 - December 2019
San Buenaventura
San Buenaventura Barangay Cagsiay 1,
Power Ltd. Co. (SBPL) 500 December 2018 December 2019
Power Ltd. Co. (SBPL) Mauban, Quezon
Project
December 2019
Masinloc Expansion AES Masinloc Power Unit 3 - September
Zambales 300 (Target Testing and
Project Partners Co., Inc. 2019
Commissioning)
Unit I - October 2018
Sitio Naglatore, Cawag, Unit II - December
RPEI Coal-Fired Power Redondo Peninsula
Subic Bay Freeport 600 2018 2019
Plant Energy, Inc.
Zone (Target Commencement
of Construction will be
44 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
Dependent on Supreme
Court decision on Writ
of Kalikasan Case.)
GNPower Dinginin 2 x
GNPower Dinginin Coal Unit I - Oct 2018 Unit I - March 2019
660 MW Supercritical Mariveles, Bataan 1,200
Plant Ltd. Co. Unit II - Dec 2019 Unit II -January 2020
Coal-Fired Power Plant
Meralco PowerGen
Unit 1 - June 2021 Unit 1 - June 2021
AOE Coal-Fired Power Corporation (Project
Atimonan, Quezon 1,200 Unit 2 - TBD Unit 2 - TBD
Plant Company: Atimonan
One Energy)
Global Luzon Energy Brgys. Carisquis and
Global Luzon Coal-Fired
Development Nalvo Sur, Luna, La 670 November 2021 January 2022
Power Plant
Corporation Union
OIL 46
45 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
Pagbilao Combined
Cycle Gas Fired Power
Brgy. Ibabang Polo,
Plant Energy World
Grande Island, Pagbilao, 650 2018 2018
Corporation
Quezon
Proposed 3x200 MW
CCGT Power Plant
HYDROPOWER 439.23
December 2018
Tubao Mini-Hydro
Tubao Tubao, La Union 1.5 December 2018 (Target Testing and
Electric Corporation
Commissioning)
46 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2018
Majayjay Hydro Power Majayjay,
Majayjay 3 December 2018 (Target Testing and
Company, Inc. Laguna
Commissioning)
December 2019
Benguet Electric
Man-Asok Buguias, Benguet 3 December 2019 (Target Testing and
Cooperative
Commissioning)
December 2019
Dupinga Hydroelectric Constellation Energy
Gabaldon, Nueva Ecija 3 December 2019 (Target Testing and
Power Project Corporation
Commissioning)
47 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2019
Lalawinan Mini-Hydro Repower Energy
Real, Quezon 3 December 2019 (Target Testing and
Power Project Development
Commissioning)
December 2020
Didipio 1 AT Dinum Company Kasibu, Nueva Vizcaya 2.1 December 2020 (Target Testing and
Commissioning)
December 2020
Ibulao Hydroelectric
Hydrocore, Inc. Lagawe, Ifugao 4.5 December 2020 (Target Testing and
Power Project
Commissioning)
December 2020
AV Garcia Power Tabaan Sur, Tuba,
Abdao HEP 2 December 2020 (Target Testing and
Systems Corp. Benguet
Commissioning)
Barit (Irrigation
December 2020
Discharge)
Nascent Technologies Buhi, Camarines Sur 0.4 December 2020 (Target Testing and
Hydroelectric Power
Commissioning)
Project
48 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2020
Greenpower Resources
Dibuluan San Agustin, Isabela 5 December 2020 (Target Testing and
Corp
Commissioning)
December 2020
Kabayan 2 (Natalang
Hedcor Cordillera, Inc. Kabayan, Benguet 38 December 2020 (Target Testing and
HEP)
Commissioning)
December 2020
Didipio 2 AT Dinum Company Kasibu, Nueva Vizcaya 9.4 December 2020 (Target Testing and
Commissioning)
December 2021
Enervantage Suppliers
Laguio Malaki 1 Mauban, Quezon 1.6 December 2021 (Target Testing and
Co., Inc.
Commissioning)
49 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2021
Sunwest Water &
Pinacanauan Peñablanca, Cagayan 6 December 2021 (Target Testing and
Electric Co., Inc.
Commissioning)
December 2021
Enervantage Suppliers
Laguio Malaki 2 Mauban, Quezon 3.1 December 2021 (Target Testing and
Co., Inc.
Commissioning)
December 2021
Davidavilan PTC Energy, Inc. Mauban, Quezon 1 December 2021 (Target Testing and
Commissioning)
December 2021
Smith Bell Mini Hydro Ambaguio, Nueva
Matuno 1 7.4 December 2021 (Target Testing and
Corporation Vizcaya
Commissioning)
December 2021
Sta. Clara Power
Matibuey Matibuey, Ilocos Sur 16 December 2021 (Target Testing and
Corporation
Commissioning)
December 2021
Repower Energy
Tibag Real, Quezon 4.40 December 2021 (Target Testing and
Developement
Commissioning)
50 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2021
Repower Energy
Lower Labayat Real, Quezon 1.40 December 2021 (Target Testing and
Developement
Commissioning)
BIMAKA Renewable December 2021
Besao, Mountain
Besao 2 Energy Development 7.00 December 2021 (Target Testing and
Province
Corporation Commissioning)
BIMAKA Renewable December 2021
Besao, Mountain
Besao 1 Energy Development 1.00 December 2021 (Target Testing and
Province
Corporation Commissioning)
BIMAKA Renewable December 2021
Besao, Mountain
Besao 3 Energy Development 4.50 December 2021 (Target Testing and
Province
Corporation Commissioning)
BIMAKA Renewable December 2021
Besao, Mountain
Besao 1B Energy Development 1.70 December 2021 (Target Testing and
Province
Corporation Commissioning)
December 2021
BIMAKA Renewable Besao, Mountain
Besao 2A 1.50 December 2021 (Target Testing and
Energy Develop Province
Commissioning)
51 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2021
BIMAKA Renewable Besao, Mountain
Besao 1A 2.30 December 2021 (Target Testing and
Energy Develop Province
Commissioning)
December 2021
Kiangan Mini Hydro
Ibulao 1 Kiangan, Ifugao 6.75 December 2021 (Target Testing and
Corporaion
Commissioning)
December 2021
Enerhighland
Lamut Asipulo & Lamut, Ifugao 6.00 December 2021 (Target Testing and
Corporation
Commissioning)
December 2021
Kiangan Mini Hydro
Hungduan Kiangan, Ifugao 4.04 December 2021 (Target Testing and
Corporaion
Commissioning)
December 2022
Philnew Hydro Power
Alilem Alilem, Ilocos Sur 16.2 December 2022 (Target Testing and
Corporation
Commissioning)
December 2022
Isabela Power San Mariano & San
Ilaguen 19 December 2022 (Target Testing and
Corporation Guillermo
Commissioning)
52 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2022
Epower Technologies
Matuno Bambang, Nueva Ecija 8 December 2022 (Target Testing and
Corporation
Commissioning)
December 2022
Greenpower Resources
Disabungan San Mariano, Isabela 4.8 December 2022 (Target Testing and
Corporation
Commissioning)
December 2022
Sunwest Water &
Cawayan 2 Sorsogon, Sorsogon 1 December 2022 (Target Testing and
Electric Co., Inc.
Commissioning)
December 2022
Philnewriver Power
Quirino Quirino, Ilocos Sur 11.5 December 2022 (Target Testing and
Corp.
Commissioning)
December 2022
Smith Bell Mini Hydro
Matuno 2 Bambang, Nueva Ecija 7.9 December 2022 (Target Testing and
Corporation
Commissioning)
53 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2022
Repower Energy
Piapi Mauban, Quezon 3.30 December 2022 (Target Testing and
Developement
Commissioning)
December 2022
Tignoan River (Upper Repower Energy
Real, Quezon 1.5 December 2022 (Target Testing and
Cascade) HEP Development Corp
Commissioning)
December 2022
Kiangan Mini Hydro
Asin Kiangan, Ifugao 7.04 December 2022 (Target Testing and
Corporaion
Commissioning)
December 2022
Isabela Power
Ilaguen 3 Echague, Isabela 11.00 December 2022 (Target Testing and
Corporation
Commissioning)
December 2022
Quirino Resources
Addalam Aglipay, Quirino 14.20 December 2022 (Target Testing and
Development Corp.
Commissioning)
54 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2023
Cordillera Hydro Electric Kapangan & Kibungan,
Kapangan 60 December 2023 (Target Testing and
Power Corporation Benguet
Commissioning)
Municipalities of
December 2023
Enerhighland Kiangan, Lamut and
Ibulao 2 7.40 December 2023 (Target Testing and
Corporation Lagawe , Province of
Commissioning)
Ifugao
December 2024
Quirino Power Energy
Addalam Aglipay, Quirino 3.80 December 2024 (Target Testing and
Corporation
Commissioning)
December 2025
Tinoc 1 Quadriver Energy Corp. Tinoc, Ifugao 4.1 December 2025 (Target Testing and
Commissioning)
December 2025
Philnew Hydro Power
Tinoc 4 Tinoc, Ifugao 5 December 2025 (Target Testing and
Corporation
Commissioning)
55 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2025
Philnew Hydro Power
Tinoc 2 Tinoc, Ifugao 11 December 2025 (Target Testing and
Corporation
Commissioning)
December 2025
Tinoc 3 Quadriver Energy Corp. Tinoc, Ifugao 8 December 2025 (Target Testing and
Commissioning)
December 2025
Tumauini (Lower
Quadriver Energy Corp. Tumauini, Isabela 7.8 December 2025 (Target Testing and
Cascade)
Commissioning)
December 2025
Tumauini (Upper Philnew Hydro Power
Tumauini, Isabela 14 December 2025 (Target Testing and
Cascade) Corporation
Commissioning)
December 2025
Philnew River Power
Tinoc 5 Tinoc, Ifugao 6.9 December 2025 (Target Testing and
Corporation
Commissioning)
December 2025
Philnew River Power
Tinoc 6 Tinoc, Ifugao 8 December 2025 (Target Testing and
Corporation
Commissioning)
56 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
December 2025
Isabela Power
Ilaguen 2 Dinapique, Isabela 14 December 2025 (Target Testing and
Corporation
Commissioning)
December 2025
Philnewriver Power
Danac Sugpon, Ilocos Sur 13.2 December 2025 (Target Testing and
Corp.
Commissioning)
SOLAR 92.86
January 2018
Sta. Rita Solar Power Mt. Sta. Rita, Morong
Jobin-Sqm Inc. (JOBIN) 92.86 January 2018 (Target Testing and
Project - Phase II and Hermosa, Bataan
Commissioning)
WIND 0
GEOTHERMAL 43
December 2022
Bacman 3 (Tanawon) Energy Development
Guinlajon, Sorsogon 31 December 2022 (Target Testing and
Geothermal Project Corporation
Commissioning)
BIOMASS 49.875
57 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 20. Luzon Committed Power Projects as of 31 December 2017
Central Azucarera
Central Azucarera Don
Bagasse-Fired Power Batangas 31.875 January 2018 March 2018
Pedro, Inc.
Plant Project
Battery 10
TOTAL 6,510.97
58 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 21. Visayas Committed Power Projects as of 31 December 2017
COAL 435
Therma Visayas Energy Brgy. Bato, Toledo City, Unit 1: January 2018
Therma Visayas Inc. 300 January 2018
Project Cebu Unit 2: March 2018
Palm Concepcion
Palm Concepcion Coal- Power Corp. (Formerly Brgy. Nipa, Concepcion,
135 Unit II - March 2018 Unit II - December 2018
Fired Power Plant DMCI Concepcion Iloilo
Power Corp.)
OIL 8
Brgy. Calumangan,
CENPRI Diesel Power Central Negros Power
Bago City, Negros 8
Plant Reliability, Inc. Unit 5 - February 2018 Unit 5 - March 2018
Occidental
GEOTHERMAL 50
Unit 1 (5 MW) -
September 2018
Unit 2 (5 MW) - March
Biliran Geothermal Plant Biliran Geothermal
Biliran, Biliran 50 September 2018 2019
Project Incorporated
Unit 3 (7 MW) - July
2021
Unit 4 (11 MW) -
59 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 21. Visayas Committed Power Projects as of 31 December 2017
November 2022
Unit 5 (14 MW) -
January 2023
Unit 6 (7 MW) - July
2023
HYDROPOWER 103.38
December 2020
Cantakoy Quadriver Energy Corp. Danao, Bohol 8 December 2020 (Target Testing and
Commissioning)
December 2020
Natural Power Sources
Amlan (Plant A) Amlan, Negros Oriental 3.2 December 2020 (Target Testing and
Integration, Inc.
Commissioning)
60 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 21. Visayas Committed Power Projects as of 31 December 2017
December 2020
Natural Power Sources
Amlan (Plant C) Amlan, Negros Oriental 0.8 December 2020 (Target Testing and
Integration, Inc.
Commissioning)
December 2020
Vivant-Malogo
Malugo Silay City, Negros 6 December 2020 (Target Testing and
Hydropower, Inc
Commissioning)
December 2020
Loboc Hydroelectric Sta. Clara Power
Loboc, Bohol 1.2 December 2020 (Target Testing and
Power Project Corporation
Commissioning)
December 2020
Antique electric
Caroan Sebaste, Antique 0.84 December 2020 (Target Testing and
Cooperative
Commissioning)
December 2020
Antique electric
Ipayo Sebaste, Antique 0.84 December 2020 (Target Testing and
Cooperative
Commissioning)
61 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 21. Visayas Committed Power Projects as of 31 December 2017
December 2021
Isabela Power
Ilaguen 4 Echague 10 December 2021 (Target Testing and
Corporation
Commissioning)
December 2022
Sagay, Negros
Lower Himogaan LGU Sagay 4 December 2022 (Target Testing and
Occidental
Commissioning)
December 2022
Sunwest Water & Bansud & Gloria,
Bansud 1.5 December 2022 (Target Testing and
Electric Company, Inc. Oriental Mindoro
Commissioning)
December 2025
Meadowland
Basak II Badian, Cebu 0.5 December 2025 (Target Testing and
Developers, Inc.
Commissioning)
62 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 21. Visayas Committed Power Projects as of 31 December 2017
December 2025
Natural Power Sources
Amlan (Plant B) Amlan, Negros Oriental 1.5 December 2025 (Target Testing and
Integration, Inc.
Commissioning)
December 2025
Hilabangan (Lower Century Peak Energy Kabankalan, Negros
3 December 2025 (Target Testing and
Cascade) Corporation Occidental
Commissioning)
December 2025
Hilabangan (Upper Century Peak Energy Kabankalan, Negros
4.8 December 2025 (Target Testing and
Cascade) Corporation Occidental
Commissioning)
December 2025
Maninila (Lower Century Peak Energy
San Remigio, Antique 4.5 December 2025 (Target Testing and
Cascade) Corporation
Commissioning)
December 2025
Maninila (Upper Century Peak Energy
San Remigio, Antique 3.1 December 2025 (Target Testing and
Cascade) Corporation
Commissioning)
63 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 21. Visayas Committed Power Projects as of 31 December 2017
December 2025
Sibalom (Upper Century Peak Energy
San Remigio, Antique 4.2 December 2025 (Target Testing and
Cascade) Corporation
Commissioning)
December 2025
Sibalom (Middle Century Peak Energy
San Remigio, Antique 4 December 2025 (Target Testing and
Cascade) Corporation
Commissioning)
December 2025
Sibalom (Lower Century Peak Energy
San Remigio, Antique 3.3 December 2025 (Target Testing and
Cascade) Corporation
Commissioning)
SOLAR 0
WIND 0
BIOMASS 178.58
64 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 21. Visayas Committed Power Projects as of 31 December 2017
SCBI Multi-Feedstock
San Carlos Biopower,
Biomass Power Plant Negros Occidental 20 January 2018 March 2018
Inc.
Project
December 2018
BISCOM Cogeneration Binalbagan, Negros
BISCOM, Inc. 48 December 2018 (Target Testing and
Power Plant Project Occidental
Commissioning)
TOTAL 774.96
65 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
COAL 700
GNPower Kauswagan
GN Power Kauswagan Kauswagan, Lanao del
Clean Coal-Fired Power 600 December 2017 March 2018
Ltd. Co. Norte
Plant
OIL 29.54
Peakpower Soccsargen,
January 2018
Inc. Bunker Fired Power Peakpower Soccsargen, General Santos City,
13.94 January 2018 (Target Testing and
Plant (PSI Expansion Inc. South Cotabato
Commissioning)
Project)
Peakpower San
January 2018
Francisco, Inc. Bunker Peakpower San San Francisco, Agusan
5.2 January 2018 (Target Testing and
Fired Power Plant (PSI Francisco, Inc. del Sur
Commissioning)
Expansion Project)
66 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
HYDROPOWER 590.89
Manolo Fortich I Hedcor Bukidnon, Inc. Santiago, Bukidnon 43.4 January 2018 March 2018
Manolo Fortich 2 Hedcor Bukidnon, Inc. Santiago, Bukidnon 25.4 January 2018 March 2018
67 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
August 2019
Asiga Green Energy Santiago, Agusan del
Asiga 8 August 2019 (Target Testing and
Corp. Norte
Commissioning)
December 2021
Katipunan River Mini Repower Energy
Cabanglasan, Bukidnon 6.2 December 2021 (Target Testing and
Hydro Power Project Development
Commissioning)
December 2022
Bukidnon II Electric
Upper Manupali Valencia City, Bukidnon 4.4 December 2022 (Target Testing and
Cooperative, Inc.
Commissioning)
68 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
December 2022
Mangima Hydroelectric Philnew Hydro Power Manolo Fortich,
10 December 2022 (Target Testing and
Power Project Corporation Bukidnon
Commissioning)
December 2022
Philnew Hydro Power Cagayan de Oro,
Mat-i-2 1.6 December 2022 (Target Testing and
Corporation Misamis Oriental
Commissioning)
December 2022
Philnew Hydro Power Cagayan de Oro,
Mat-i-3 3.25 December 2022 (Target Testing and
Corporation Misamis Oriental
Commissioning)
69 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
December 2022
Maramag Mini-Hydro
Maramag Maramag, Bukidnon 1.4 December 2022 (Target Testing and
Corp
Commissioning)
December 2022
Manupali Matic Hydropower Corp Valencia, Bukidnon 9 December 2022 (Target Testing and
Commissioning)
December 2022
Philnewriver Power
Malitbog Malitbog, Bukidnon 3.4 December 2022 (Target Testing and
Corp.
Commissioning)
December 2022
Repower Energy
Pulanai Valencia, Bukidnon 10.6 December 2022 (Target Testing and
Development
Commissioning)
December 2022
Kaltimex Langaran Calamba, Misamis
Langaran 3.60 December 2022 (Target Testing and
Hydro, Inc. Occidental
Commissioning)
70 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
December 2022
Euro Hydro Power Alamada, North
Alamada 2.84 December 2022 (Target Testing and
(Asia) Holdings, Inc. Cotabato
Commissioning)
December 2022
Euro Hydro Power Leon Postigo,
Polandoc 5.70 December 2022 (Target Testing and
(Asia) Holdings, Inc. Zamboanga del Norte
Commissioning)
December 2022
Euro Hydro Power Kolambogan, Lanao del
Titunod 3.60 December 2022 (Target Testing and
(Asia) Holdings, Inc. Norte
Commissioning)
December 2022
Euro Hydro Power
Bayug Iligan, Lanao del Norte 17.81 December 2022 (Target Testing and
(Asia) Holdings, Inc.
Commissioning)
December 2022
Alsons Energy
Kalaong 1 Maitum, Sarangani 7.40 December 2022 (Target Testing and
Development Corp.
Commissioning)
71 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
December 2023
Puyo Hydroelectric First Gen Mindanao Jabonga, Agusan del
30 December 2023 (Target Testing and
Power Project Hydropower Corp. Norte
Commissioning)
December 2023
Alsons Energy
Kalaong 2 Maitum, Sarangani 4.80 December 2023 (Target Testing and
Development Corp.
Commissioning)
December 2024
Sawaga River Mini Repower Energy
Malaybalay, Bukidnon 4.5 December 2024 (Target Testing and
Hydro Power Project Development
Commissioning)
December 2024
Maco, Compostela
Tagum Sta. Clara Power Corp. 2.60 December 2024 (Target Testing and
Valley
Commissioning)
December 2025
First Gen Mindanao Impasugong & Sumilao,
Tagoloan 39 December 2025 (Target Testing and
Hydropower Corp. Bukidnon
Commissioning)
72 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
December 2025
Pasonanca Philcarbon, Inc. Zamboanga City 0.5 December 2025 (Target Testing and
Commissioning)
December 2025
Philnew Hydro Power Clarin, Misamis
Clarin 5 December 2025 (Target Testing and
Corporation Occidental
Commissioning)
December 2025
Philnew Hydro Power Claveria, Cagayan de
Mat-i-I 4.85 December 2025 (Target Testing and
Corporation Oro
Commissioning)
December 2025
Euro Hydro Power Lake Sebu, South
Lanon (Lam-alu) 9.5 December 2025 (Target Testing and
(Asia) Holdings, Inc. Cotabato
Commissioning)
December 2025
Philnewriver Power
Silo-o Malitbog, Bukidnon 3.29 December 2025 (Target Testing and
Corp.
Commissioning)
73 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 22. Mindanao Committed Power Projects as of 31 December 2017
SOLAR 0
BIOMASS 12
May 2017
GEEC Biomass Green Earth Enersource
Maguindanao 3.5 (On-going Testing and March 2018
Cogeneration System Corporation
Commissioning)
TOTAL 1,332.43
74 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
COAL 6,660
SRPGC 2x350MW
St. Raphael Power Brgy. San Rafael,
Coal-Fired Power 700 July 2019 December 2019
Generation Corporation Calaca, Batangas
Plant Project
December 2020
Masinloc Expansion AES Masinloc Power
Zambales 300 (Target Testing and
Project Partners Co., Inc. Unit 4 - June 2020
Commissioning)
SMC Circulating
Brgy. Ibabang Polo,
Fluidized Bed Coal- SMC Global Power 600 TBD TBD
Pagbilao, Quezon
Fired Power Plant
75 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
SMC Circulating
SMC Global Power
Fluidized Bed Coal- Sariaya, Quezon 600 TBD TBD
Holdings Corp.
Fired Power Plant
Quezon Coal Fired
Orion Pacific Prime
Thermal Plant Tagkawayan, Quezon 1,200 TBD TBD
Energy, Inc.
Project
Zestpower Coal
Zestpower Corporation Mariveles, Bataan 660 TBD TBD
Thermal Plant
2x500 MW KEPCO
KEPCO Philippines
Pangasinan Coal- Sual, Pangasinan 1,000 TBD TBD
Corporation
Fired Power Plant
OIL 450
Aero Derivative
Calamba Aero Power
Combined Cycle Calamba, Laguna 150 TBD TBD
Corporation
Power Plant
AC Energy Modular
Genset (Diesel) AC Energy DevCo, Inc. Pililia, Rizal 300 TBD TBD
Power Plant
76 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
GEOTHERMAL 130
77 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
December 2025
Kayabon Energy Development
Manito, Albay 30 December 2025 (Target Testing and
Geothermal Project Corporation
Commissioning)
Bacon-Manito
Energy Development Bacon-Manito,
Geothermal Power 80 TBD TBD
Corporation Sorsogon
Project
HYDROPOWER 2,738.33
March 2019
Kabayan 1 Hedcor Benguet, Inc. Kabayan, Benguet 20 March 2019 (Target Testing and
Commissioning)
March 2019
Kabayan 3 Hedcor Benguet, Inc. Kabayan, Benguet 27 March 2019 (Target Testing and
Commissioning)
March 2019
Bineng 1-2b
Hedcor, Inc. La Trinidad, Benguet 19 March 2019 (Target Testing and
Combination HEPP
Commissioning)
78 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
July 2019
Aurora All Asia Energy
Tignoan HEP Real, Quezon 20 July 2019 (Target Testing and
Corp.
Commissioning)
August 2019
AV Garcia Power
Biyao Balbalan, Kalinga 0.8 August 2019 (Target Testing and
Systems Corp.
Commissioning)
January 2020
Clean and Green Goa & Tigaon,
Ranggas 1.5 January 2020 (Target Testing and
Energy Solutions, Inc. Camarines Sur
Commissioning)
October 2020
Bansud PTC Energy, Inc. Mauban, Quezon 1 October 2020 (Target Testing and
Commissioning)
December 2020
Maris Main Canal2 SN Aboitiz Power
Alfonso Lista, Ifugao 1.75 December 2020 (Target Testing and
HEP Generation
Commissioning)
79 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
January 2021
SN Aboitiz Power-
100 MW Alimit Lagawe, Ifugao 100 January 2021 (Target Testing and
Ifugao
Commissioning)
January 2021
SN Aboitiz Power-
240 MW Alimit Lagawe, Ifugao 240 January 2021 (Target Testing and
Ifugao
Commissioning)
January 2021
SN Aboitiz Power-
Olilicon HEPP Lagawe, Ifugao 10 January 2021 (Target Testing and
Ifugao
Commissioning)
December 2023
Chico Hydroelectric San Lorenzo Ruiz Piat
Tabuk, Kalinga 150 December 2023 (Target Testing and
Power Project & Water
Commissioning)
80 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
81 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
SOLAR 3,259.82
2018
Botolan Solar Solar Power Utilities Brgy. San Juan,
39.27 2018 (Target Testing and
Power Project Generator Corporation Botolan, Zambales
Commissioning)
February 2019
Cordon Solar PV Greenergy Solutions,
Cordon, Isabela 50 February 2019 (Target Testing and
Power Project Inc.
Commissioning)
82 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
May 2019
Earthenergy Solar
Earthenergy Corp. Balayan, Batangas 30 May 2019 (Target Testing and
Power Plant
Commissioning)
December 2019
V-Mars Solar Power V-Mars Solar Energy San Jose/Lupao, Nueva
10 December 2019 (Target Testing and
Project Corporation Ecija
Commissioning)
December 2019
SJC Solar Power SJC Solar Power San Jose City, Nueva
10 December 2019 (Target Testing and
Project Corporation Ecija
Commissioning)
December 2019
RGEC Solar Power Roxas Green Energy Nasugbu and Tuy,
30 December 2019 (Target Testing and
Project Corporation Province of Batangas
Commissioning)
December 2019
Calabanga Solar Calabanga Renewable Calabanga, Camarines
50 December 2019 (Target Testing and
Power Project Energy Inc. Sur
Commissioning)
December 2019
FPI Solar PV Power
Firmgreen Phils. Inc. Tarlac City, Tarlac 50 December 2019 (Target Testing and
Project
Commissioning)
83 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
December 2019
Nueva Ecija Solar Pantabangan, Nueva
Firmgreen Phils. Inc. 100 December 2019 (Target Testing and
Power Project Ecija
Commissioning)
December 2019
Sta. Maria Solar PV Greenergy Solutions,
Sta. Maria, Isabela 125 December 2019 (Target Testing and
Power Project Inc.
Commissioning)
March 2020
Santa Solar Power Satrap Power Brgy. Nagpanaoan,
20 March 2020 (Target Testing and
Project Corporation Santa, Ilocos Sur
Commissioning)
84 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
May 2020
Talugtug Solar PV Greenergy Solutions,
Talugtug, Nueva Ecija 125 May 2020 (Target Testing and
Power Project Inc.
Commissioning)
May 2020
Greenergy Capas Greenergy Solutions,
Capas, Tarlac 50 May 2020 (Target Testing and
Solar Power Project Inc.
Commissioning)
May 2020
Ilagan II Solar PV Greenergy Solutions,
Ilagan City, Isabela 100 May 2020 (Target Testing and
Power Project Inc.
Commissioning)
Magsingal Solar
Neoenergy Corporation Magsingal, Ilocos Sur 100 TBD TBD
Power Plant
Calamba and
Solar Philippines
Tanauan Solar Tanauan, Batangas 100 TBD TBD
Tanauan Corporation
Power Project
Capas Solar PV Sindicatum C-Solar
Capas, Tarlac 22 TBD TBD
Power Project Power Inc.
85 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
Laguna Lake
Nuevo Solar Energy Calacan and Victoria,
Bangyas Solar 25 TBD TBD
Corporation Laguna
Power Plant
Lumban Solar Nuevo Solar Energy
Lumban, Laguna 37 TBD TBD
Power Plant Corporation
San Miguel Solar Powersource First
San Miguel, Bulacan 50 TBD TBD
Power Plant Bulacan Solar Inc.
Solar Philippines
Tarlac Solar Power
Commercial Rooftop Tarlac City, Tarlac 100 TBD TBD
Project
Projects, Inc.
86 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
87 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
WIND 1,275.4
Energy Development
December 2019
Burgos 2 Wind Corporation Pagali
Burgos, Ilocos Norte 183 December 2019 (Target Testing and
Power Project Burgos Wind Power
Commissioning)
Corporation
88 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
August 2020
Matnog 1 Wind Energy Development
Matnog, Sorsogon 153 August 2020 (Target Testing and
Power Project Corporation
Commissioning)
August 2020
Matnog 2 Wind Energy Development
Matnog, Sorsogon 206 August 2020 (Target Testing and
Power Project Corporation
Commissioning)
August 2020
Matnog 3 Wind Energy Development
Matnog, Sorsogon 206 August 2020 (Target Testing and
Power Project Corporation
Commissioning)
Talisay Wind Power Currimao Solar Energy
Camarines Norte 50 TBD TBD
Project Corp.
Talim Wind Power Currimao Solar Energy
Rizal 140 TBD TBD
Project Corp.
Calatagan Wind Currimao Solar Energy
Batangas 80 TBD TBD
Power Project Corp.
BIOMASS 114.2
May 2019
Polillo Biomass Renesons Energy
Quezon 1.5 May 2019 (Target Testing and
Power Plant Project Polillo, Inc.
Commissioning)
89 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
June 2019
Santa Biomass Satrap Power Brgy. Nagpanaoan,
10 June 2019 (Target Testing and
Power Project Corporation Santa, Ilocos Sur
Commissioning)
EcoMarket
Solutions Coconut December 2019
EcoMarket Solutions,
Waste-Fired Aurora 2.5 December 2019 (Target Testing and
Inc.
Biomass Power Commissioning)
Project
CJ Global Waste-to- December 2020
CJ Global Green Energy
Energy Power Camarines Sur 20 December 2020 (Target Testing and
Philippines Corp.
Project Commissioning)
December 2020
FQBC Biogas Power First Quezon Biogas
Quezon 1.2 December 2020 (Target Testing and
Plant Project Corporation
Commissioning)
90 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
BATTERY 230
AES Battery
AES Philippines Power
Storage - Laoag Laoag, Ilocos Norte 40 TBD TBD
Partners Co. Ltd.
Project
AES Battery
AES Philippines Power
Storage - Bantay Bantay, Ilocos Norte 40 TBD TBD
Partners Co., LTD.
Project
AES Battery
AES Philippines Power
Storage - Masinloc Masinloc, Zambales 10 TBD TBD
Partners Co., LTD.
Project Unit 2
91 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 23. Luzon Indicative Power Projects as of 31 December 2017
AES Battery
AES Philippines Power
Storage - Masinloc Masinloc, Zambales 10 TBD TBD
Partners Co., LTD.
Project Unit 3
AES Battery
AES Philippines Power
Storage - Masinloc Masinloc, Zambales 10 TBD TBD
Partners Co., LTD.
Project Unit 4
Enerhiya Central
Battery Energy SunAsia Energy Inc. Concepcion, Tarlac 40 TBD TBD
Storage Project
Enerhiya Sur I
Lemery and Tuy,
Battery Energy SunAsia Energy Inc. 40 TBD TBD
Calaca, Batangas
Storage Project
Enerhiya Sur II
Battery Energy SunAsia Energy Inc. Lumban, Laguna 40 TBD TBD
Storage Project
TOTAL 17,443.75
*TBD – To be Determined
92 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
COAL 300
SPC Expansion
SPC Power Brgy. Colon, Naga
Coal Power Plant 300 TBD TBD
Corporation City, Cebu
Project
NATURAL GAS 138
Argao Floating PHINMA Energy Brgy. Bulasa, Argao,
138 TBD TBD
CCGT Power Plant Corporation Cebu
OIL 95.7
Datem Energy
Northern Samar Datem Energy
Northern Samar 10 TBD TBD
Diesel Power Plant Corporation
Project
Marubeni Diesel
Marubeni Corporation Isabel, Leyte 70 TBD TBD
Genset Facility
SPC Ubay Diesel
Supreme Power
Power Plant Ubay, Bohol 7.2 TBD TBD
Corporation
Project
93 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
GEOTHERMAL 40
December 2025
Dauin Geothermal Energy Development Dauin, Negros
40 December 2025 (Target Testing and
Project Corporation Oriental
Commissioning)
HYDROPOWER 621.6
March 2024
Bolusao Pumped San Lorenzo Samar Lawaan, Eastern
300 March 2024 (Target Testing and
Storage and Water, Inc. Samar
Commissioning)
94 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
Ilog Hydroelectric
PHINMA Energy Mabinay, Negros
Power Plant 21.6 TBD TBD
Corporation Occidental
SOLAR 791.63
December 2018
Grid Tied Solar E & P Green Energy,
Biliran, Biliran 25 December 2018 (Target Testing and
Farm Inc.
Commisioning)
Ceko Solar PV
Project April 2019
CEKO Solar Farm Brgy. Tominjao, Daan
(Daanbantayan 100 April 2019 (Target Testing and
Systems Corp. Bantayan, Cebu
Solar PV Power Commisioning)
Project)
95 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
April 2019
Silay Phase II Solar Silay City, Negros
Silay Solar Power Inc. 10 April 2019 (Target Testing and
Power Project Occidental
Commisioning)
December 2019
Mabinay Solar Lohas and Soul Mabinay, Negros
90 December 2019 (Target Testing and
Power Project Lighting, Inc. Oriental
Commissioning)
May 2020
Bogo V Solar Sun Premier Bogo
Bogo , Cebu 16.7 May 2020 (Target Testing and
Power Project Philippine Corporation
Commisioning)
May 2020
Bogo 3 Solar Power Sun Premier Bogo
Bogo , Cebu 15 May 2020 (Target Testing and
Plant Philippine Corporation
Commisioning)
September 2020
Sanpalo Solar Sunpalo Solar Energy,
San Miguel, Leyte 100 September 2020 (Target Testing and
Power Plant Inc.
Commisioning)
Medellin Solar
Solar Philippines, Inc. Medellin, Cebu 300 TBD TBD
Power Plant
96 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
WIND 1,398
Calatrava, Salvador
February 2020
Bronzeoak Wind Bronzeoak Benedicto and San
100 Februrary 2020 (Target Testing and
Power Project Philippines, Inc. Carlos, Negros
Commissioning)
Occidental
August 2020
Iloilo 1 Wind Power Energy Development Batad & San Dionisio,
213 August 2020 (Target Testing and
Project Corporation Iloilo
Commissioning)
97 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
August 2020
Iloilo 2 Wind Power Energy Development
Concepcion, Iloilo 500 August 2020 (Target Testing and
Project Corporation
Commissioning)
August 2020
Negros Wind Energy Development Manapla & Cadiz,
262 August 2020 (Target Testing and
Power Project Corporation Negros Occidental
Commissioning)
98 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
Tri-Conti ECC
Ivisan Wind Power
Renewables Ivisan, Capiz 50 TBD TBD
Project
Corporation
BIOMASS 14.5
MCEI Multi-
December 2020
Feedstock Biomass Megawatt Clean
Negros Occidental 12 December 2020 (Target Testing and
Power Plant Energy, Inc.
Commissioning)
Project
UGEP Rice Husk-
December 2020
Fired Biomass UGEP Ormoc Biomass
Leyte 2.5 December 2020 (Target Testing and
Power Plant Power
Commissioning)
Project
BATTERY 130
Enerhiya Delas
Islas I Battery Amlan, Negros
SunAsia Energy Inc. 15 TBD TBD
Energy Storage Oriental
Project
99 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 24. Visayas Indicative Power Projects as of 31 December 2017
Enerhiya Delas
Islas II Battery
SunAsia Energy Inc. Ormoc, Leyte 15 TBD TBD
Energy Storage
Project
Enerhiya Delas
Islas III Battery
SunAsia Energy Inc. Compostela, Cebu 15 TBD TBD
Energy Storage
Project
Cadiz Energy Cadiz City, Negros
EQ Energy Storage Inc 15 TBD TBD
Storage Project Occidental
Silay Battery
Global Silay Energy Silay, Negros
Energy Storage 30 TBD TBD
Solutions Occidental
Project
TOTAL 3,529.43
100 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 25. Mindanao Indicative Power Projects as of 31 December 2017
COAL 1,138
ZAM 100 MW
Circulating Sitio San Ramon, Bgry.
Fluidized Bed (CFB) San Ramon Power Inc. Talisayan, Zamboanga 100 TBD TBD
Coal-Fired Power City
Station
Brgy. Mandangoa,
Balingasag Coal- Minergy Coal
Balingasag, Misamis 110 TBD TBD
Fired Power Plant Corporation
Oriental
101 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 25. Mindanao Indicative Power Projects as of 31 December 2017
OIL-BASED 45.216
Panasia Malita
Panasia Energy, Inc. Malita, Davao 20 TBD TBD
Diesel Power Plant
GEOTHERMAL 30
HYDROPOWER 268
Limbatangon 2018
Turbines Resource & Cagayan de Oro City,
Hydroelectric Power 9 2018 (Target Testing and
Development Corp. Misamis Oriental
Project Commissioning)
102 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 25. Mindanao Indicative Power Projects as of 31 December 2017
Tumalaong 2018
First Gen Mindanao
Hydroelectric Power Baungon, Bukidnon 9 2018 (Target Testing and
Hydropower Corp.
Project Commissioning)
March 2019
Kitaotao 1 Hedcor Bukidnon, Inc. Bukidnon 70 March 2019 (Target Testing and
Commissioning)
10 MW Cabulig-2
Mindanao Energy Jasaan, Misamis
Hydroelectric Power 10 December 2018 March 2019
Systems, Inc. Oriental
Plant Project
December 2019
Puyo Hydroelectric First Gen Mindanao Jabonga, Agusan del
30 December 2019 (Target Testing and
Power Project Hydropower Corp. Norte
Commissioning)
December 2023
Davao Hydroelectric San Lorenzo Ruiz
Davao City 140 December 2023 (Target Testing and
Power Project Olympia
Commissioning)
SOLAR 410
July 2018
Sumilao Solar San Vicente, Sumilao,
Sunasia Energy, Inc. 2 July 2018 (Target Testing and
Power Project Bukidnon
Commissioning)
103 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 25. Mindanao Indicative Power Projects as of 31 December 2017
December 2018
San Francisco Solar San Francisco, Agusan
Gpower Inc. 10 December 2018 (Target Testing and
Power Project del Sur
Commissioning)
December 2019
Jasaan Solar Power Lohas and Soul Jasaan, Misamis
60 December 2019 (Target Testing and
Project Lighting, Inc. Oriental
Commissioning)
Natures Renewable
Lal-lo Solar PV
Energy & Development Maasim, Sarangani 100 TBD TBD
Power Plant
(NAREDCO) Corp.
104 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 25. Mindanao Indicative Power Projects as of 31 December 2017
Zamboanga City
Solar Power Plant Ecoglobal, Inc 30 TBD TBD
Special Economic Zone
BIOMASS 89.4
12 MW Napier
Manolo Fortich 2018
Grass-Fired
Biomass Energy Bukidnon 12 2018 (Target Testing and
Biomass Power
Corporation Commissioning)
Plant Project
10MW Malay-balay
Bio-Energy December 2020
Malaybalay Bio-Energy
Corporation Multi Bukidnon 10 December 2020 (Target Testing and
Corporation
Feedstock Commissioning)
Generating Facility
105 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
Annex 25. Mindanao Indicative Power Projects as of 31 December 2017
Bagasse-Fired Co-
generation Power Crystal Sugar, Inc. Maramag, Bukidnon 14.9 TBD TBD
Plant
TOTAL 1,980.62
106 | D O E - E P I M B
2 0 1 7 P o w e r D e m a n d a n d S u p p l y H i g h l i g h t s
For inquiries, please contact:
Redentor E. Delola
Assistant Secretary
Irma C. Exconde
Assistant Director, Electric Power Industry Management Bureau
Thelma B. Ejercito
OIC-Chief, Power Planning and Development Division
Department of Energy
Energy Center, Rizal Drive, Bonifacio Global City (BGC)
Taguig City, Philippines 1632
Tel. Nos.: 840-2173; 479-2900 local 386, 202
Website: http://www.doe.gov.ph
Facebook: http://www.facebook.com/doe.gov.ph
Instagram: @DOE_PH
Twitter: @DOE_PH