PR PO Material Description Packing: Inspection Memorandum
PR PO Material Description Packing: Inspection Memorandum
To : Hamid Sb
Material against following order has been received. Please plan inspection activity so WH may shift /
place material at designated places.
It is mandatory to carry out inspection within 7 days of issuance of this inspection note. Purpose of
inspection is to note whether the product conforms or not to the specified quality limits expressed in the
specifications or standards. Units conforming are accepted and units not conforming to standards will be
rejected.
Please ensure that quality is never compromised.
PR PO MATERIAL DESCRIPTION PACKING
Circuit Breaker Earth –Leakage Pole 2 Phase Single
10100012 EA
Voltage240 f 50/60 Hz
10100012 Cable Jointing Kit For Armoured Cable,Size 1 Core x 25 SQMM EA
10100012 Others Material
Store Assistant
M. Ayaz