You are on page 1of 1

ANSWER:

Desired cycle time = operating time per day/desired


output rate Number of stations = total work time / cycle
time
Balance Delay = idle time per cycle/N*cycle
time*100% Efficiency = 1-balance delay

Task time following tasks positional weight


A 3 4 23
B 2 3 20
C 4 2 18
D 7 3 25
E 4 2 18
F 5 4 29
G 6 3 24
H 9 1 14
I 5 0 5

A)

Work Station Time remaining Eligible Assign task Time left


1 14 A,F F 9
9 A A 6
2 14 B,D,G D 7
7 B,G G 1
3 14 B B 12
12 C,E C 8
8 E E 4
4 14 H,I H 5

B)
Work Station Time remaining Eligible Assign task Time left
1 14 F F 9
9 D D 2
2 14 G G 8
8 A A 5
5 B 2 3
3 14 C,E C 10
10 E E 6
4 14 H H 5
5 I I 0
Bold numbers are
idle times. c.
Balance delay = 11/56
Efficiency = 1 – balance delay = 45/56