You are on page 1of 1
TELANGANA STATE POWER GENERATION CORPORATION LIMITED KOTHAGUDEM THERMAL POWER STATION - V & VI STAGES, PALONCHA Ojo. The Chief Engineer, Operation & Maintenance, KTPS V& VI Stages, Paloncha. Cir. Memo No. CE/O&M/KTPS V&VI/ DE/E&P/V&VI/F.No.cir. /D. No 44/20, Dt.2-9.09.2020 Sul KTPS V&VI Stages ~ Fulfilment of X2 Criteria for opening ESVs during absolute cold start-ups - OEM recommended procedure for pre warming control valves - Certain instructions ~ Issued - Regarding. It is noted by the undersigned that unwarranted delay is being caused for fulfilment of X2-Criteria for opening ESVs (Curve between Main steam saturation temperature and HP control valve midwall temperature) during absolute cold startups i., HP casing temperatures ~ 50°C In this regard, certain recommendations proposed for fulfilment of X2 criteria during cold startups by Original Equipment Manufacturer (OEM) ie., M/s.BHEL elaborating the procedure to be adopted for pre warming control values vide No. HIA/STE/SM/8300/Technical Circular No.X-133 dated 09.09.2013 is enclosed for ready reference. The Superintending Engineer/O&M/KTPS V_ Stage and The Superintending Engineer/O&MKTPS/VI Stage are directed to issue necessary instructions to the concerned Maintenance and Shift Engineers in this matter of concern so as to minimize startup time and oil consumption during cold start-ups. These instructions shall be followed scrupulously. Encl: No, HW/STE/SM/8300/Technical Circular No.X-133 [2 8-2 CHIEF ENGINEER O&M/KTPS V & VI STAGES To The Superintending Engineer/O&M/KTPS-V Stage. The Superintending Engineer/O&M/KTPS- VI Stage Copy communicated to Chief Engineer/Generation/TSGENCO/Vidyut Soudha/Hyderabad, Copy to DE/Technical to the Director/Thermal/TSGENCO/Vidyut Soudha/Hyderabad.

You might also like