Phase 1:

Ground Floor
Preparing the Ground Beam - formwork
Preparing the Ground Beam – Steelworks & ready
for concreting
Preparing the slab - Soil Compacting
Preparing the slab - BRC (steel mesh) installation
- Type A @ B
- Single @ Double Layer
Interconnections
Preparing the slab – BRC (steel mesh) installation

Concrete Cover
Interconnections
Preparing the slab – Concreting
Preparing the slab – Concreting
Preparing the slab – Concreting
Phase 2:
Column
Preparing the Column – Steelworks
Preparing the Column – Formwork
Preparing the Column – Ready for concreting

Bracings

Shorings
Columns concreted – Ready for Upper Floor
Phase 3:
Upper Floor
Preparing Upper Beams - Formwork

scaffolding
Preparing Upper Beams - Formworks

Soffits
Preparing Upper Beams - Formworks
Preparing Upper Beams – Formworks & Steelworks
Preparing Upper Slab - Formworks
Preparing Upper Slab - Formworks

Soffits
Preparing Upper Slab - Formworks
Preparing Upper Slab – Services

TV/ Telco Cabling

Elecrical Conduits

Concrete Cover

Electrical Point
Preparing Upper Slab – Services & Steelworks
Preparing Upper Slab – Services & Steelworks
Toilet fittings basically consist of water supply
pipe & sanitary pipes.
Preparing Upper Slab – Services & Steelworks
-Type ‘B’ BRC/ Steel Mesh
- Double layer installed
Completion Upper Slab – Concreting
Completion - Monitoring
Completion - Monitoring
Ready for Upper Level Construction