Professional Documents
Culture Documents
Sheet 05
Sheet 05
1. Using the Dodge-Romig tables, determine the double sampling plan for
AOQL = 3.0% when the process average is 0.80 % and the lot size is 2500. What
is the LTPD?
2. Using the Dodge-Romig tables for LTPD, determine the single sampling
plan for a LTPD = 1.0 % when the process average is 0.35 % and N = 502. What
is the AOQL?
5. For the information in problem 4, give the equations for the OC curve.
6. Using the Philips split-risk system, determine the sampling plan for a lot
size of 30,000 and a desired split-risk product quality, 100p = 5.0 %.
7. Determine the sampling plan using the Philips system for a lot size of 800
and a desired split-risk product quality of 2 %.