Balance of lines using Incremental Utilization Heuristics

WC Tasks Minutes/calculator Required station Actual number Utilization


1 A 0.18 1.8 2 90 Tasks Time
1 A,B 0.3 3 3 100 A 0.18
2 C 0.32 3.2 4 80 B 0.12
2 C,D 0.77 7.7 8 96.25 C 0.32
2 C,D.E 1.28 12.8 13 98.46 D 0.45
2 C,D,E,F 1.83 18.3 19 96.32 E 0.51
3 F 0.55 5.5 6 91.67 F 0.55
3 F,G 0.93 9.3 10 93.00 G 0.38
3 F,G,H 1.35 13.5 14 96.43 H 0.42
3 F,G,H,I 1.65 16.5 17 97.06 I 0.3
3 F,G,H,I,J 1.83 18.3 19 96.32 J 0.18
4 J, 0.18 1.8 2 90.00 K 0.36
4 J,K 0.54 5.4 6 90.00 L 0.42
4 JKL 0.96 9.6 10 96.00 M 0.48
4 JKLM 1.44 14.4 15 96.00 N 0.3
4 JKLMN 1.74 17.4 18 96.67 O 0.39
4 JKLMNO 2.03 20.3 21 96.67 Total 5.36

Demand: 540
Efect. Time: 54
Cycle time: 0.1
Mínim.stat. 53.6
Efficiency: 99.26%
Calc/hour
Mins./hora
Min/Calc