Professional Documents
Culture Documents
The mentioned sources are very costly and very difficult to maintain
Alternate solution to increase gas temperature
(Compressor at GGS IV)
Modification
Estimated Results: (Using Hysis, Chemcad, Glide, Pipesim softwares used
for simulation )
1. Two globe valves with minor modification of air fin cooler piping
• The cost of implementation for the scheme is very less and benefits
are significant.
Hence the above scheme is needed to implement.
Injection Gas Analysis