1.

The gland seal heater is running normally (Open the water injection valve of the shaft seal heater to inject
water, and close the water injection valve when it is full of water, and start one shaft seal exhaust fan)
2. During cold start-up, the steam supply temperature of high and intermediate pressure shaft seal is
controlled at 180-260 ℃, and during warm and hot start-up, the steam supply temperature of high and
intermediate pressure shaft seal is controlled at 260-300 ℃/300-371 ℃. The gland steam temperature of
LP casing is maintained from 121℃-177℃.
3. Check and close the desuperheating water regulating valve and manual valve of the shaft seal supply tube
and low pressure section of shaft seal.
4. Check and close the gland seal steam supply regulating valve, front electric valve and bypass valve.
5. Check and close the shaft seal overflow regulating valve and bypass valve.
6. Open the drain valve of the auxiliary steam supply pipeline, open the auxiliary steam to the gland seal
steam supply valve, and fully drain the gland seal steam supply pipeline until the superheat is greater
than 50 ℃.
7. Confirms that the auxiliary steam supply pipe is opened and fully drained and when the steam supply pipe
reaches to 250℃, then supply steam to shaft seal header.
8. Open the electric valve in front of the gland seal steam supply regulating valve, and slightly open the
gland seal steam supply regulating valve to warm up the main steam supply pipe.
9. The temperature of the shaft seal supply tube is over 150 ℃. During the hot start of the unit, the
temperature of the high-pressure section of the shaft seal supply tube shall be suitable for the metal
temperature of the high and medium pressure cylinder rotor.
10. Adjust the shaft seal supply pipe pressure up to 21-27\kpa.
11. Properly open the steam supply branch manual valves of the high, middle and low pressure cylinders,
check and confirm that there is no steam leakage into the atmosphere of the steam turbine shaft seal,
otherwise adjust the vacuum degree of the shaft or the pressure of the shaft seal supply pipe until the
external leakage stops.
12. If the steam supply temperature of the low pressure cylinder shaft seal is above 150 ℃, open the front
and rear manual valves of the low pressure cylinder shaft seal desuperheating regulating valve, put the
desuperheating regulating valve into automatic operation, and confirm that the temperature of the low
pressure cylinder shaft seal main pipe is normal.
13. The shaft seal supply pipe pressure is set to 24kpa, and the automatic operation of the overflow
regulating valve of the shaft seal is put into operation. The setting value is 27kpa, and the overflow of the
shaft seal is switched to No. 8 low pressure heater.
14. When the unit load is more than 330MW, fully open the front and rear gland steam supply valves of HP
and IP cylinders.