1200 (in sq.) CARRIAGEWAY

SCHEDULE OF REINFORCEMENT 450 750


SAFETY KERB

461 TO
300
(a1) TYPE DIA. OF LENGTH OF No. TOTAL UNIT TOTAL SHAPE OF BARS
SPACING WEIGHT 50 175 50 175
(a2) OF BAR
'mm'
EACH BAR OF LENGTH WEIGHT (not to scale)
BAR 'mm' 'mm' BARS 'm' 'kg/m' 'kg' 'mm'

SECTION ON 'XX' 3420 a1 200


a1 12 150 3772 2x86 648.784 0.888 576

Y
900 12690 a2 150
a2 12 150 13554 24 325.30 0.888 289

700
300 600 250 100
a3
6346
a3 12 150 13555 24 325.33 0.888 289

1050
300

150

- 6 3420 a4
a4 12 3420 2x1 6.84 0.888

100 250
150

12690 a5
SLOPE
RAMP

a5 12 - 13302 2x1 26.600 0.888 24


750

SLOPE
TOTAL 1184 kg (or) 1.18 t
2.5%

300
350
300 TOP OF
DECK AT END

CONSTRUCTION JOINT
(a1)

1200 (in sq.) CARRIAGEWAY DETAILS OF CRASH BARRIER


& SAFETY KERB
2.5%

450
300 150 (SCALE : 1:25)

ROADWAY
(a2)

300
SPAN

TOP REINFT.

900

600
SLOPE

6 26

350
13
TOP OF WINGWALL

APPROACH SLAB
SECTION ON 'YY'
CARRIAGEWAY
DECK WIDTH

75 461
(SQ) 12900

(SQ) 10500

CONSTRUCTION JOINT

PLAN
X

22
DETAILS OF RAMP OVER APPROACH / WING
(SCALE : 1:25)

6
BOTTOM REINFT.
WELD
WELD

3
10 10
20x20x3

DETAIL-1
(SCALE 1:1)

300
32 198 32
2.5%

(a1)

FOOT PATH 26 210 26


210

32
DRAIN PIPE
M.S.FLATS 12x25

6
A 100 DIA A 12 23
6 DETAIL-1
(TYP.) (TYP.)
6

210

262
198
SLOPE

6 32

100
MS FLAT 1:9.4
(a3)

12X25

6
12 23 44 34

32

300
SLOPE
1:12.5
300
NOTES:- 100 DIA GI SCREED
FILLET WELD
DRAIN PIPE CONCRETE
SLOPE
RAMP

300
750

DECK SLAB
150

6 NOS PVC DOWN


TAKE PIPE
350
PLAN
300

DETAILS OF DRAINAGE SECTION A-A


300 600 250 100 SPOUT AND COLLECTION PIT (SCALE 1:10)
900 (SCALE 1:15)
Y

SHEET : 05
DATE :
DRAWN PROJECT :
GOVERNMENT OF TAMILNADU CONSTRUCTION OF HIGH LEVEL BRIDGE IN LIEU OF EXISTING SCALE :

DESIGNED
HIGHWAYS DEPARTMENT CAUSEWAY AT KM 14/4 OF KURICHI KANNAMANAICKNOOR VIA AS SHOWN

F:\Sujith\Kanyakumari Work\Tamil New.png HIGHWAYS PROJECTS NACHIPALAYAM ROAD (MDR -1182 ) SIZE :
CONSULTANT : A2
CHECKED CIRCLE : COIMBATORE
REVISION
DIVISION : COIMBATORE
APPROVED SECTION : UDUMALPET
TITLE : DETAILS OF APPROACH SLAB, DRAINAGE SPOUT AND SAFETY KERB