ETAP

Project: Page: 1
6.0.0
Location: Date: 05-15-2017

Contract: SN: 12345678

Engineer: Revision: Base

Study Case: LF
Filename: TAWILl BEBAN 56% Config.: Normal

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp ) Amp % (MVA) M VA % MVA %

T1 Transformer 100.000 74.542 74.5 70. 118 70.1


Branch Loading Summary Report

T2 Transformer 100.000 39.541 39.5 38.417 38.4


T3 Transformer 100.000 26.451 26.5 25.870 25.9

T4 Transformer 100.000 10.223 10.2 10.121 10.1

T5 Transformer 100.000 16.177 16.2 15.947 15.9

T6 Transformer 100.000 29.458 29.5 28.832 28.8

T7 Transformer 100.000 25.924 25.9 25.423 25.4


* Indicates a branch with operating load exceeding the branch capability.
ETAP
Project: Page: 2
6.0.0
Location: Date: 05-15-2017

Contract: SN: 12345678

Engineer: Revision: Base

Study Case: LF
Filename: TAWILl BEBAN 56% Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

ID MW Mvar MW Mvar kW kvar From To in Vmag

Line1 843.449 450.477 -842.433 -440.758 1015.9 9719.5 100.0 99.4 0.57
Line2 690.982 357.445 -689.758 -347.135 1223.9 10309.4 100.0 99.3 0.75

Line3 73.526 39.608 -73.372 -38.749 154.4 859.4 99.4 98.8 0.65

Line4 591.765 279.538 -589.984 -271.823 1781.2 7715.7 99.4 98.7 0.74

Line5 60.907 30.221 -60.736 -29.179 171.2 1042.4 99.4 98.5 0.89

T1 61.010 42.829 -59.006 -37.880 2003.7 4949.2 99.4 94.4 5.00

T2 26.734 29.133 -26.690 -27.632 44.0 1501.8 99.4 97.5 1.90

T3 -15.746 -20.525 15.767 21.238 20.9 712.7 94.4 97.5 3.10

Line6 -39.139 -37.358 39.140 37.390 1.1 32.1 98.6 98.7 0.04

T4 -0.121 10.222 0.124 -10.120 3.0 102.0 98.6 98.7 0.04

T5 7.390 14.390 -7.382 -14.135 7.5 255.4 98.6 98.3 0.38

Line7 -63.647 -38.187 63.707 38.375 60.8 188.5 98.6 98.8 0.25

Line8 15.337 18.492 -15.335 -18.479 2.4 13.3 98.8 98.8 0.05

Line9 77.686 32.323 -77.586 -31.736 100.0 587.6 98.8 98.5 0.37

Line10 -334.838 -182.786 335.279 185.432 441.1 2645.9 98.8 99.3 0.43

Line11 60.690 35.038 -60.615 -33.723 74.9 1315.0 98.8 97.8 1.03

T6 20.184 21.457 -20.159 -20.613 24.7 843.8 98.8 97.6 1.18

Line12 71.625 37.728 -71.605 -37.612 20.1 115.2 98.8 98.7 0.09

T7 17.081 19.500 -17.062 -18.846 19.2 654.1 98.8 97.8 0.99

Line40 622.324 282.165 -621.685 -276.418 639.2 5746.3 98.7 98.3 0.42

Line13 -94.415 -43.793 94.422 44.140 7.0 347.2 97.8 97.9 0.14

Line14 -463.530 -208.180 464.076 211.177 545.6 2996.9 97.9 98.3 0.33

Line15 42.812 10.750 -42.748 -10.473 64.2 277.0 97.9 97.6 0.29

Line16 159.771 62.820 -159.636 -62.492 135.2 327.5 97.9 97.8 0.14
ETAP
Project: Page: 3
6.0.0
Location: Date: 05-15-2017

Contract: SN: 12345678

Engineer: Revision: Base

Line17 96.835 49.006 -96.768 -48.715 67.8 290.9 97.9 97.8 0.17

Line39 69.689 41.464 -69.569 -41.063 120.7 400.9 97.9 97.6 0.37

Line18 55.700 16.413 -55.478 -15.790 222.6 622.9 98.5 97.8 0.66

Line19 -9.859 -3.724 9.862 3.738 2.9 14.2 98.5 98.5 0.08

Line20 52.411 18.673 -52.184 -18.118 226.4 555.4 98.3 97.6 0.70

Line21 -12.433 -3.837 12.435 3.845 1.5 7.7 97.5 97.6 0.03

Line22 -5.520 -3.839 5.521 3.841 0.5 2.4 97.5 97.6 0.03

Line23 -9.753 -4.618 9.755 4.628 2.0 9.7 97.5 97.6 0.06

Line24 9.825 -0.692 -9.825 0.695 0.6 3.3 97.6 97.6 0.00

Line25 -13.396 -2.133 13.399 2.141 3.1 7.5 97.6 97.6 0.03

Line26 -48.389 -13.604 48.658 13.767 268.5 162.7 97.6 98.2 0.59
Study Case: LF
Filename: TAWILl BEBAN 56% Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

ID MW Mvar MW Mvar kW kvar From To in Vmag

Line27 -43.382 -26.843 43.432 26.964 49.3 120.8 97.6 97.8 0.20
Line28 -156.815 -71.247 157.030 75.227 214.5 3980.8 98.2 99.3 1.08

Line29 9.674 9.503 -9.648 -9.454 25.2 49.1 98.2 97.8 0.38

Line30 -16.656 4.535 16.663 -4.501 7.9 34.6 97.6 97.6 0.01

Line31 -14.112 7.826 14.117 -7.805 5.1 20.6 97.6 97.6 0.04

Line33 7.094 -3.455 -7.090 3.463 3.4 8.2 97.8 97.8 0.01

Line34 48.978 5.163 -48.965 -5.130 13.5 33.0 97.8 97.8 0.03

Line35 19.723 10.894 -19.705 -10.837 18.0 57.0 97.8 97.6 0.19

Line36 27.535 11.081 -27.518 -11.024 16.6 56.8 97.8 97.6 0.12

Line37 61.864 15.226 -61.805 -15.060 58.5 166.1 97.8 97.6 0.15

Line38 -20.363 0.539 20.397 -0.498 34.4 40.7 97.6 97.8 0.16

9924.5 59903.3
ETAP
Project: Page: 4
6.0.0
Location: Date: 05-15-2017

Contract: SN: 12345678

Engineer: Revision: Base

Study Case: LF
Filename: TAWILl BEBAN 56% Config.: Normal

Alert Summary Report

% Alert Settings

Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Bus Voltage
OverVoltage 110.0 105.0

UnderVoltage 90.0 95.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Gen1 Generator Under Excited 0.000 Mvar 0.000 0.0 3- Phase

Gen1 Generator Under Power 0.000 MW 0.000 0.0 3- Phase


ETAP
Project: Page: 5
6.0.0
Location: Date: 05-15-2017

Contract: SN: 12345678

Engineer: Revision: Base

Gen2 Generator Under Excited 0.000 Mvar 0.000 0.0 3- Phase

Gen2 Generator Under Power 0.000 MW 0.000 0.0 3- Phase

Gen3 Generator Under Excited 0.000 Mvar 0.000 0.0 3- Phase

Gen3 Generator Under Power 0.000 MW 0.000 0.0 3- Phase

Gen4 Generator Under Excited 0.000 Mvar 0.000 0.0 3- Phase

Gen4 Generator Under Power 0.000 MW 0.000 0.0 3- Phase

Gen5 Generator Under Excited 0.000 Mvar 0.000 0.0 3- Phase

Gen5 Generator Under Power 0.000 MW 0.000 0.0 3- Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus3 Bus Under Voltage 150.000 kV 141.640 94.4 3- Phase


Study Case: LF
Filename: TAWILl BEBAN 56% Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 1860.325 948.834 1991.884 88.06 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 1860.325 861.631 948.834 1991.884 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 1860.325 801.728 875.713 1947.201 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 9.924 59.903

System Mismatch: 0.000 0.000


ETAP
Project: Page: 6
6.0.0
Location: Date: 05-15-2017

Contract: SN: 12345678

Engineer: Revision: Base

Number of Iterations: 2