Project: ETAP Page: 1

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: 344TGF001


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
344TGF001 Total 0.00 27.580 0.00 92.07 97.26 36.021 36.021 5.36E+001 5.47E+002 5.60E+001 1.34E+002

Bus8 344TGF001 1.34 25.885 2.87 92.55 96.43 34.515 36.021 5.52E+001 5.83E+002 5.60E+001 1.34E+002

PRIM TR 344TGF001 0.09 1.697 0.08 92.06 97.28 1.506 0.000 1.32E+003 8.83E+003

Bus7 344TGF001 0.00 0.000 0.00 92.07 97.26 0.000 0.000

Barra SSAA 344TGF001 0.00 0.000 0.00 92.07 97.26 0.000 0.000

344DG001 Bus8 105.00 25.885 105.00 105.00 105.00 34.515 36.021 5.05E+001 5.77E+002 4.10E+001 1.20E+002

SEC TR PRIM TR 1.86 1.697 53.58 107.28 56.25 1.506 0.000 1.31E+003 8.83E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.580 36.021 23.429 37.314
Peak Current (kA), Method C : 63.710 83.210 54.122 86.197
Breaking Current (kA, rms, symm) : 36.021 23.429 37.314
Steady State Current (kA, rms) : 8.648 36.021 23.429 37.314

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 2

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: Barra SSAA


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
Barra SSAA Total 0.00 26.293 0.00 84.47 110.88 32.032 32.032 1.04E+002 5.67E+002 2.14E+002 1.83E+002

344TGF001 Barra SSAA 9.86 26.293 20.27 89.15 103.35 32.032 32.032 1.04E+002 5.67E+002 2.14E+002 1.83E+002

Bus8 344TGF001 11.00 24.678 22.57 89.37 102.70 30.692 32.032 5.52E+001 5.83E+002 5.60E+001 1.34E+002

PRIM TR 344TGF001 9.93 1.618 20.33 89.15 103.37 1.339 0.000 1.32E+003 8.83E+003

Bus7 344TGF001 9.86 0.000 20.27 89.15 103.35 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 26.293 32.032 22.242 34.973
Peak Current (kA), Method C : 58.970 71.840 49.884 78.437
Breaking Current (kA, rms, symm) : 32.032 22.242 34.973
Steady State Current (kA, rms) : 8.622 32.032 22.242 34.973

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 3

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: Bus8


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
Bus8 Total 0.00 27.853 0.00 92.82 95.79 36.841 36.841 4.94E+001 5.42E+002 4.10E+001 1.20E+002

344TGF001 Bus8 0.09 1.696 0.08 92.80 95.81 1.524 0.000 1.32E+003 8.84E+003

344DG001 Bus8 105.00 26.160 105.00 105.00 105.00 35.317 36.841 5.05E+001 5.77E+002 4.10E+001 1.20E+002

PRIM TR 344TGF001 0.18 1.696 0.16 92.79 95.84 1.524 0.000 1.32E+003 8.83E+003

Bus7 344TGF001 0.09 0.000 0.08 92.80 95.81 0.000 0.000

Barra SSAA 344TGF001 0.09 0.000 0.08 92.80 95.81 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.853 36.841 23.668 38.099
Peak Current (kA), Method C : 64.799 85.709 55.062 88.638
Breaking Current (kA, rms, symm) : 36.841 23.668 38.099
Steady State Current (kA, rms) : 8.654 36.841 23.668 38.099

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 4

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: Enchufe P&C


Nominal kV = 7.200
Voltage c Factor = 1.10 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
Enchufe P&C Total 0.00 1.284 0.00 99.74 96.42 1.709 1.709 7.11E+001 6.83E+002 1.44E+001 1.53E+002

Bus6 Enchufe P&C 0.09 1.183 0.12 99.74 96.42 1.618 1.709 7.43E+001 7.42E+002 1.44E+001 1.53E+002

PALA_PROPEL Enchufe P&C 110.00 0.101 110.00 110.00 110.00 0.091 0.000 1.30E+003 8.67E+003

SEC TR Bus6 0.33 1.183 0.47 99.73 96.41 1.618 1.709 7.40E+001 7.41E+002 1.41E+001 1.53E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.284 1.709 1.095 1.764
Peak Current (kA), Method C : 2.990 3.980 2.551 4.108
Breaking Current (kA, rms, symm) : 1.709 1.095 1.764
Steady State Current (kA, rms) : 0.474 1.709 1.095 1.764

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 5

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: PRIM TR


Nominal kV = 0.400
Voltage c Factor = 1.05 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
PRIM TR Total 0.00 27.311 0.00 91.44 98.65 35.230 35.230 5.78E+001 5.52E+002 7.10E+001 1.48E+002

344TGF001 PRIM TR 1.32 25.614 2.81 91.87 97.84 33.741 35.230 6.00E+001 5.89E+002 7.10E+001 1.48E+002

SEC TR PRIM TR 1.79 1.698 53.26 107.31 57.03 1.489 0.000 1.31E+003 8.83E+003

Bus8 344TGF001 2.65 25.614 5.62 92.32 97.03 33.741 35.230 5.52E+001 5.83E+002 5.60E+001 1.34E+002

Bus7 344TGF001 1.32 0.000 2.81 91.87 97.84 0.000 0.000

Barra SSAA 344TGF001 1.32 0.000 2.81 91.87 97.84 0.000 0.000

Bus6 SEC TR 1.80 0.094 53.26 107.31 57.03 0.069 0.000 5.54E+003 6.84E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 27.311 35.230 23.195 36.548
Peak Current (kA), Method C : 62.658 80.827 53.215 83.853
Breaking Current (kA, rms, symm) : 35.230 23.195 36.548
Steady State Current (kA, rms) : 8.642 35.230 23.195 36.548

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 6

Location: 20.0.0C Date: 09-03-2024

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EACP_VATIOTRON_BHP Config.: Normal

Fault at bus: SEC TR


Nominal kV = 7.200
Voltage c Factor = 1.10 (Maximum If)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. Va Vb Vc Ia 3I0 R1 X1 R0 X0
rms
SEC TR Total 0.00 1.287 0.00 99.76 96.33 1.715 1.715 7.02E+001 6.82E+002 1.32E+001 1.51E+002

Bus6 SEC TR 0.02 0.101 0.02 99.76 96.33 0.091 0.000 1.30E+003 8.68E+003

PRIM TR SEC TR 22.46 1.186 59.21 64.43 111.71 1.625 1.715 * 7.32E+001 7.40E+002 1.32E+001 1.51E+002

Enchufe P&C Bus6 0.03 0.101 0.03 99.76 96.34 0.091 0.000 1.30E+003 8.68E+003

344TGF001 PRIM TR 23.37 21.357 59.91 64.38 111.71 16.371 0.000 3.20E+002 5.26E+002

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.287 1.715 1.098 1.774
Peak Current (kA), Method C : 3.001 4.000 2.561 4.136
Breaking Current (kA, rms, symm) : 1.715 1.098 1.774
Steady State Current (kA, rms) : 0.474 1.715 1.098 1.774

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.