Professional Documents
Culture Documents
ETAP Page: 1
19.0.1C
Location: Date: 11-26-2021
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: PART 1 CIRCUIT DIAGRAM Config.: Normal
SHORT-CIRCUIT REPORT
Bus1 Total 0.00 0.754 -15.844 21.0 15.862 0.00 0.710 -15.791 22.2 15.807
Bus21 Bus1 0.01 0.111 -0.195 1.7 0.224 0.01 0.075 -0.168 2.2 0.184
Bus18 Bus1 0.03 0.260 -0.345 1.3 0.432 0.03 0.253 -0.319 1.3 0.407
Incoming Supply Bus1 100.00 0.383 -15.304 40.0 15.309 100.00 0.383 -15.304 40.0 15.309
Bus18 Total 0.00 0.873 -15.755 18.0 15.779 0.00 0.830 -15.703 18.9 15.725
Bus1 Bus18 0.96 0.613 -15.409 25.1 15.421 0.96 0.577 -15.383 26.7 15.394
T2 Feeder Bus Bus18 28.40 0.260 -0.345 1.3 0.432 26.76 0.253 -0.319 1.3 0.407
Bus21 Total 0.00 0.874 -15.751 18.0 15.775 0.00 0.830 -15.698 18.9 15.720
Bus1 Bus21 0.97 0.763 -15.556 20.4 15.575 0.97 0.755 -15.530 20.6 15.549
T1 Feeder Bus Bus21 9.82 0.111 -0.195 1.7 0.224 8.05 0.075 -0.168 2.2 0.184