Professional Documents
Culture Documents
ETAP Page: 1
12.6.0H
Location: Date: 07-18-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: COCBA Config.: Normal
Bus7 Bus3 92.44 10.216 98.64 100.60 103.77 7.892 14.356 5.00E+001 2.00E+001 7.95E+001 2.40E+001
Bus6 Bus3 28.19 19.859 77.06 99.56 91.44 20.12 0.000 2.41E+000 2.76E+001
Gas Turbine Bus7 100.00 10.216 100.00 100.00 100.00 7.892 14.356 6.62E-001 1.32E+001 6.62E-001 6.62E+000
Bus4 Bus6 30.22 0.407 77.74 99.57 91.89 0.130 0.000 1.57E+001 1.49E+001
Lump1 Bus4 100.00 0.407 100.00 100.00 100.00 0.130 0.000 1.92E+000 1.92E+001
# Indicates fault current contribution is from three-winding transformers
* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer