Project: Example

ETAP Page: 1
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

SHORT- CIRCUIT REPORT

Fault at bus: Bus1

Prefault voltage = 0.490 kV = 102.00 % of nominal bus kV ( 0.480 kV)


= 102.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus1 Total 0.00 29.270 0.00 100.28 100.78 30.131 30.131 5.48E+001 4.16E+002 5.35E+001 3.80E+002

Bus2 Bus1 0.00 0.000 0.00 100.28 100.78 0.000 0.000

Sub 3 Bus1 93.28 29.270 97.29 101.99 97.81 30.131 30.131 * 5.48E+001 4.16E+002 5.35E+001 3.80E+002

Sub3 Swgr Sub 3 93.32 0.086 97.31 101.99 97.83 0.054 0.000 7.60E+003 2.89E+003

Bus3 Sub 3 93.65 1.116 97.43 101.99 98.04 0.662 0.000 6.09E+002 1.52E+002

# Main Bus Sub 3 100.77 2.145 101.33 102.00 101.40 1.273 0.000 3.19E+002 6.98E+001

# Sub2B Sub 3 100.97 0.032 101.30 101.80 101.84 0.019 0.000 * 2.13E+004 6.29E+003

Bus9 Sub3 Swgr 93.97 0.022 97.61 101.99 98.18 0.013 0.000 3.03E+004 1.14E+004

LVBus Sub3 Swgr 93.76 0.009 96.35 100.42 100.81 0.005 0.000 6.63E+004 4.28E+004

MCC1 Sub3 Swgr 97.19 0.030 99.53 103.18 103.54 0.018 0.000 2.23E+004 7.18E+003

Pump 1 Sub3 Swgr 106.08 0.026 106.08 106.08 106.08 0.018 0.000 7.54E+002 4.60E+003

WTG1 Bus3 102.00 1.116 102.00 102.00 102.00 0.662 0.000 3.09E+000 1.05E+002

Sub2A Main Bus 100.92 0.004 101.26 101.79 101.84 0.002 0.000 2.15E+004 9.18E+003

# Sub2B Main Bus 100.97 0.007 101.30 101.80 101.84 0.004 0.000 * 1.19E+004 4.60E+003

Utility Main Bus 102.00 0.248 102.00 102.00 102.00 0.147 0.000 1.85E-001 8.33E+000 1.10E-001 4.96E+000

Bus6 Sub2B 100.97 0.001 101.30 101.80 101.84 0.001 0.000 1.14E+003 4.03E+003

Gen1 Sub2B 102.00 0.020 102.00 102.00 102.00 0.014 0.000 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.006 106.64 106.64 106.64 0.004 0.000 3.15E+001 7.87E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 2
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Bus2

Prefault voltage = 0.490 kV = 102.00 % of nominal bus kV ( 0.480 kV)


= 102.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus2 Total 0.00 12.815 0.00 111.05 127.69 9.288 9.288 5.70E+002 7.69E+002 1.68E+003 1.25E+003

Bus1 Bus2 66.57 12.815 79.44 101.12 102.21 9.288 9.288 5.70E+002 7.69E+002 1.68E+003 1.25E+003

Sub 3 Bus1 98.86 12.815 100.44 102.00 101.54 9.288 9.288 * 5.48E+001 4.16E+002 5.35E+001 3.80E+002

Sub3 Swgr Sub 3 98.87 0.038 100.45 102.00 101.55 0.017 0.000 1.02E+004 1.53E+004

Bus3 Sub 3 99.03 0.489 100.51 102.00 101.60 0.204 0.000 9.21E+002 1.08E+003

# Main Bus Sub 3 101.55 0.939 101.78 102.00 101.93 0.393 0.000 4.95E+002 5.47E+002

# Sub2B Sub 3 101.62 0.014 101.84 101.90 102.02 0.006 0.000 * 3.09E+004 3.96E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 3
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Bus6

Prefault voltage = 14.076 kV = 102.00 % of nominal bus kV ( 13.800 kV)


= 102.00 % of base kV ( 13.800 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus6 Total 0.00 10.177 0.00 113.46 122.41 7.531 7.531 2.20E+000 4.19E+001 1.92E+001 8.52E+001

Sub2B Bus6 2.72 10.077 7.25 113.77 117.18 7.482 7.531 2.13E+000 4.23E+001 1.92E+001 8.52E+001

Sub23 Bus6 3.17 0.102 71.23 66.67 101.63 0.050 0.000 1.13E+003 4.03E+003

# Main Bus Sub2B 87.92 7.495 96.59 101.94 97.20 3.667 0.000 1.37E+000 5.58E+001

# Sub 3 Sub2B 91.63 0.110 98.02 101.95 98.43 0.054 0.000 3.64E+002 3.77E+003

Gen1 Sub2B 102.00 1.941 102.00 102.00 102.00 3.483 7.531 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.532 106.64 106.64 106.64 0.280 0.000 3.15E+001 7.87E+002

Bus23A Sub23 21.46 0.408 96.76 63.93 94.85 0.174 0.000 1.04E+003 3.92E+003

Sub2A Main Bus 89.68 0.043 96.01 100.25 100.74 0.018 0.000 1.98E+003 1.61E+002

# Sub 3 Main Bus 91.63 0.127 98.02 101.95 98.43 0.054 0.000 6.65E+002 3.51E+001

Utility Main Bus 102.00 2.828 102.00 102.00 102.00 1.194 0.000 1.85E-001 8.33E+000 1.10E-001 4.96E+000

Sub3 Swgr Sub 3 91.66 0.102 98.04 101.95 98.45 0.045 0.000 6.72E+003 1.71E+003

Bus3 Sub 3 92.04 1.322 98.14 101.96 98.63 0.557 0.000 5.31E+002 6.98E+001

Bus1 Sub 3 91.63 0.000 96.96 100.53 100.93 0.000 0.000

Mtr1 Bus23A 132.15 0.938 132.15 132.15 132.15 0.232 0.000 1.12E+003 1.01E+004

LUMP4 Bus23A 125.54 1.947 125.54 125.54 125.54 0.481 0.000 1.90E+003 4.51E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 4
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Bus7

Prefault voltage = 14.076 kV = 102.00 % of nominal bus kV ( 13.800 kV)


= 102.00 % of base kV ( 13.800 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus7 Total 0.00 6.374 0.00 172.86 179.29 0.405 0.405 3.73E+000 6.68E+001 3.15E+003 7.63E+001

Sub2A Bus7 1.77 5.843 0.42 172.55 179.19 0.382 0.405 3.80E+000 7.29E+001 3.15E+003 7.63E+001

Sub22 Bus7 16.50 0.531 103.25 100.14 102.00 0.022 0.000 7.77E+001 8.00E+002

Main Bus Sub2A 92.01 5.494 101.79 102.00 102.15 0.367 0.405 * 3.18E+000 7.65E+001 3.14E+003 6.89E+001

Syn1 Sub2A 106.64 0.350 106.64 106.64 106.64 0.015 0.000 4.45E+001 1.20E+003

LUMP2 Sub22 106.64 2.124 106.64 106.64 106.64 0.078 0.000 6.70E+001 6.70E+002

# Sub2B Main Bus 94.29 0.080 101.97 101.85 102.13 0.003 0.000 * 1.06E+003 1.61E+002

# Sub 3 Main Bus 95.24 0.111 101.86 102.00 102.10 0.004 0.000 7.56E+002 1.14E+002

Utility Main Bus 102.00 2.007 102.00 102.00 102.00 0.073 0.000 1.85E-001 8.33E+000 1.10E-001 4.96E+000

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 5
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Bus23A

Prefault voltage = 0.490 kV = 102.00 % of nominal bus kV ( 0.480 kV)


= 99.45 % of base kV ( 0.492 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus23A Total 0.00 16.420 0.00 102.86 102.01 16.282 16.282 1.31E+002 6.98E+002 1.24E+002 7.18E+002

Sub23 Bus23A 80.49 12.952 89.79 99.43 90.64 13.988 16.282 * 1.37E+002 8.90E+002 1.24E+002 7.18E+002

Mtr1 Bus23A 128.84 1.148 128.84 128.84 128.84 0.759 0.000 1.12E+003 1.01E+004

LUMP4 Bus23A 122.40 2.383 122.40 122.40 122.40 1.575 0.000 1.90E+003 4.51E+003

Bus6 Sub23 94.80 1.848 98.56 98.79 96.40 1.058 0.000 * 4.39E+002 1.58E+001

Sub2B Bus6 94.90 0.462 98.56 98.83 96.46 0.153 0.000 7.05E+002 5.21E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 6
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: LVBus

Prefault voltage = 0.490 kV = 102.00 % of nominal bus kV ( 0.480 kV)


= 102.00 % of base kV ( 0.480 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

LVBus Total 0.00 16.094 0.00 176.63 176.70 0.010 0.010 5.89E+001 7.60E+002 3.61E+006 8.65E+002

Sub3 Swgr LVBus 96.86 15.197 102.00 102.00 102.00 0.010 0.010 * 4.66E+001 8.06E+002 3.61E+006 8.65E+002

LUMP1 LVBus 106.43 0.948 106.43 106.43 106.43 0.000 0.000 5.01E+003 1.19E+004

Sub 3 Sub3 Swgr 97.46 1.708 102.00 102.00 102.00 0.001 0.000 4.12E+002 9.27E+001

Bus9 Sub3 Swgr 97.24 0.013 102.00 102.00 102.00 0.000 0.000 5.42E+004 1.61E+004

MCC1 Sub3 Swgr 100.24 0.018 104.62 104.61 104.62 0.000 0.000 3.98E+004 9.75E+003

Pump 1 Sub3 Swgr 106.08 0.015 106.08 106.08 106.08 0.000 0.000 7.54E+002 4.60E+003

Bus3 Sub 3 97.64 0.579 102.00 102.00 102.00 0.000 0.000 1.20E+003 3.09E+002

Bus1 Sub 3 97.46 0.000 102.00 102.00 102.00 0.000 0.000

# Main Bus Sub 3 101.36 1.113 102.00 102.00 102.00 0.000 0.000 6.29E+002 1.43E+002

# Sub2B Sub 3 101.46 0.016 102.00 102.00 102.00 0.000 0.000 * 4.20E+004 1.28E+004

LUMP6 Bus9 102.00 0.013 102.00 102.00 102.00 0.000 0.000 7.69E+002 5.13E+003

Mtr6 MCC1 109.16 0.030 109.16 109.16 109.16 0.000 0.000 2.69E+003 1.62E+004

Mtr4 MCC1 181.28 0.087 181.28 181.28 181.28 0.000 0.000 6.60E+002 5.75E+003 6.60E+002 5.75E+003

Mtr3 MCC1 109.16 0.019 109.16 109.16 109.16 0.000 0.000 3.91E+003 2.64E+004

Mtr5 MCC1 109.16 0.013 109.16 109.16 109.16 0.000 0.000 7.00E+003 3.85E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 7
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Main Bus

Prefault voltage = 35.190 kV = 102.00 % of nominal bus kV ( 34.500 kV)


= 102.00 % of base kV ( 34.500 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Main Bus Total 0.00 22.741 0.00 95.14 94.94 26.283 26.283 1.89E-001 7.50E+000 1.01E-001 4.49E+000

Sub2A Main Bus 12.76 0.310 58.32 58.81 101.84 0.240 0.000 3.84E+001 5.50E+002

# Sub2B Main Bus 23.33 0.813 61.69 63.07 101.47 1.462 2.458 * 1.07E+001 2.10E+002 1.18E+000 4.80E+001

# Sub 3 Main Bus 33.04 1.136 25.82 100.64 99.92 0.888 0.034 7.35E+000 1.50E+002 3.25E+002 3.43E+003

Utility Main Bus 102.00 20.483 102.00 102.00 102.00 23.694 23.790 1.85E-001 8.33E+000 1.10E-001 4.96E+000

Bus7 Sub2A 12.88 0.464 58.40 58.80 101.84 0.309 0.000 3.91E+002 7.21E+002

Syn1 Sub2A 106.64 0.310 106.64 106.64 106.64 0.211 0.000 4.45E+001 1.20E+003

Bus6 Sub2B 23.34 0.079 61.70 63.07 101.47 0.052 0.000 1.67E+003 4.04E+003

# Sub 3 Sub2B 33.04 0.012 25.82 100.64 99.92 0.008 0.000 1.48E+004 2.46E+004

Gen1 Sub2B 102.00 1.527 102.00 102.00 102.00 1.021 0.000 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.418 106.64 106.64 106.64 0.298 0.000 3.15E+001 7.87E+002

Sub3 Swgr Sub 3 33.29 0.678 26.02 100.65 100.00 0.544 0.000 2.41E+002 1.39E+003

Bus3 Sub 3 35.74 8.788 27.89 100.62 100.95 6.756 0.000 5.74E+000 1.09E+002

Bus1 Sub 3 33.04 0.000 65.81 66.77 101.88 0.000 0.000

Sub22 Bus7 27.29 0.464 90.80 44.57 91.18 0.309 0.000 3.92E+002 7.20E+002

Sub23 Bus6 25.76 0.079 89.94 43.77 91.21 0.052 0.000 1.67E+003 4.04E+003

Bus9 Sub3 Swgr 38.31 0.170 29.87 101.20 101.33 0.131 0.000 9.25E+002 5.52E+003

LVBus Sub3 Swgr 37.00 0.070 66.99 69.00 101.88 0.054 0.000 5.05E+003 1.27E+004

MCC1 Sub3 Swgr 46.03 0.235 72.63 74.23 104.51 0.181 0.000 4.76E+002 4.03E+003

Pump 1 Sub3 Swgr 106.08 0.205 106.08 106.08 106.08 0.180 0.000 7.54E+002 4.60E+003

WTG1 Bus3 102.00 8.788 102.00 102.00 102.00 6.756 0.000 3.09E+000 1.05E+002

Bus2 Bus1 33.04 0.000 65.81 66.77 101.88 0.000 0.000

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 8
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: MCC1

Prefault voltage = 0.490 kV = 102.00 % of nominal bus kV ( 0.480 kV)


= 99.45 % of base kV ( 0.492 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

MCC1 Total 0.00 19.524 0.00 102.78 102.06 19.364 19.364 3.35E+001 5.96E+002 2.69E+001 6.12E+002

Sub3 Swgr MCC1 93.84 16.079 96.79 99.44 96.58 16.406 17.321 * 2.86E+001 7.25E+002 2.44E+001 6.84E+002

Mtr6 MCC1 106.43 0.708 106.43 106.43 106.43 0.468 0.000 2.69E+003 1.62E+004

Mtr4 MCC1 176.75 2.015 176.75 176.75 176.75 2.015 2.048 6.60E+002 5.75E+003 6.60E+002 5.75E+003

Mtr3 MCC1 106.43 0.437 106.43 106.43 106.43 0.289 0.000 3.91E+003 2.64E+004

Mtr5 MCC1 106.43 0.298 106.43 106.43 106.43 0.197 0.000 7.00E+003 3.85E+004

Sub 3 Sub3 Swgr 94.48 1.867 97.00 99.45 97.00 1.067 0.000 3.70E+002 7.13E+001

Bus9 Sub3 Swgr 94.25 0.014 96.96 99.45 96.81 0.008 0.000 4.88E+004 1.28E+004

LVBus Sub3 Swgr 94.15 0.006 95.95 98.71 98.45 0.003 0.000 1.10E+005 5.58E+004

Pump 1 Sub3 Swgr 103.43 0.017 103.43 103.43 103.43 0.011 0.000 7.54E+002 4.60E+003

Bus3 Sub 3 94.68 0.633 97.07 99.45 97.13 0.362 0.000 1.08E+003 2.44E+002

Bus1 Sub 3 94.48 0.000 96.17 98.64 98.63 0.000 0.000

# Main Bus Sub 3 98.75 1.216 99.10 99.45 99.10 0.696 0.000 5.64E+002 1.11E+002

# Sub2B Sub 3 98.86 0.018 99.06 99.35 99.35 0.010 0.000 * 3.78E+004 1.03E+004

LUMP6 Bus9 99.45 0.014 99.45 99.45 99.45 0.008 0.000 7.69E+002 5.13E+003

LUMP1 LVBus 103.77 0.049 103.77 103.77 103.77 0.033 0.000 5.01E+003 1.19E+004

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 9
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Sub2A

Prefault voltage = 14.076 kV = 102.00 % of nominal bus kV ( 13.800 kV)


= 102.00 % of base kV ( 13.800 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Sub2A Total 0.00 6.455 0.00 172.96 179.34 0.406 0.406 3.04E+000 6.60E+001 3.14E+003 6.89E+001

Bus7 Sub2A 0.16 0.530 0.01 172.96 179.34 0.022 0.000 7.85E+001 8.01E+002

Main Bus Sub2A 91.87 5.570 101.79 102.00 102.15 0.369 0.406 * 3.18E+000 7.65E+001 3.14E+003 6.89E+001

Syn1 Sub2A 106.64 0.355 106.64 106.64 106.64 0.015 0.000 4.45E+001 1.20E+003

Sub22 Bus7 16.61 0.530 103.28 100.20 102.00 0.022 0.000 7.77E+001 8.00E+002

# Sub2B Main Bus 94.18 0.081 101.97 101.85 102.13 0.003 0.000 * 1.05E+003 1.45E+002

# Sub 3 Main Bus 95.15 0.113 101.85 102.00 102.10 0.004 0.000 7.49E+002 1.02E+002

Utility Main Bus 102.00 2.035 102.00 102.00 102.00 0.074 0.000 1.85E-001 8.33E+000 1.10E-001 4.96E+000

LUMP2 Sub22 106.64 2.121 106.64 106.64 106.64 0.077 0.000 6.70E+001 6.70E+002

Bus6 Sub2B 94.19 0.008 101.97 101.85 102.13 0.000 0.000 1.14E+003 4.03E+003

# Sub 3 Sub2B 95.15 0.001 101.85 102.00 102.10 0.000 0.000 3.42E+003 2.73E+004

Gen1 Sub2B 102.00 0.152 102.00 102.00 102.00 0.006 0.000 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.042 106.64 106.64 106.64 0.002 0.000 3.15E+001 7.87E+002

Sub3 Swgr Sub 3 95.17 0.067 101.86 102.00 102.10 0.003 0.000 1.01E+004 3.22E+003

Bus3 Sub 3 95.42 0.873 101.86 102.00 102.10 0.032 0.000 8.03E+002 1.55E+002

Bus1 Sub 3 95.15 0.000 101.97 101.87 102.12 0.000 0.000

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 10
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Sub2B

Prefault voltage = 14.076 kV = 102.00 % of nominal bus kV ( 13.800 kV)


= 102.00 % of base kV ( 13.800 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Sub2B Total 0.00 10.372 0.00 113.39 118.93 7.926 7.926 1.39E+000 4.11E+001 1.13E+001 7.93E+001

Bus6 Sub2B 0.03 0.102 0.01 113.39 118.94 0.052 0.000 1.14E+003 4.03E+003

# Main Bus Sub2B 87.64 7.641 96.45 101.94 96.76 3.860 0.000 1.37E+000 5.58E+001

# Sub 3 Sub2B 91.42 0.113 97.92 101.95 98.11 0.057 0.000 3.64E+002 3.77E+003

Gen1 Sub2B 102.00 1.979 102.00 102.00 102.00 3.666 7.926 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.542 106.64 106.64 106.64 0.294 0.000 3.15E+001 7.87E+002

Sub23 Bus6 3.19 0.102 69.29 66.62 101.59 0.052 0.000 1.13E+003 4.03E+003

Sub2A Main Bus 89.44 0.044 95.67 100.29 100.52 0.019 0.000 1.96E+003 1.12E+002

# Sub 3 Main Bus 91.42 0.130 97.92 101.95 98.11 0.057 0.000 6.56E+002 1.87E+001

Utility Main Bus 102.00 2.883 102.00 102.00 102.00 1.256 0.000 1.85E-001 8.33E+000 1.10E-001 4.96E+000

Sub3 Swgr Sub 3 91.46 0.104 97.94 101.95 98.13 0.047 0.000 6.65E+003 1.53E+003

Bus3 Sub 3 91.84 1.347 98.04 101.95 98.32 0.587 0.000 5.24E+002 5.67E+001

Bus1 Sub 3 91.42 0.000 96.67 100.57 100.75 0.000 0.000

Bus23A Sub23 21.48 0.408 95.89 62.54 95.22 0.179 0.000 1.04E+003 3.93E+003

Bus7 Sub2A 89.46 0.065 95.68 100.29 100.53 0.033 0.000 7.85E+001 8.01E+002

Syn1 Sub2A 106.64 0.044 106.64 106.64 106.64 0.023 0.000 4.45E+001 1.20E+003

Bus9 Sub3 Swgr 92.23 0.026 98.20 101.95 98.45 0.011 0.000 2.65E+004 6.02E+003

LVBus Sub3 Swgr 92.02 0.011 96.97 100.68 100.78 0.005 0.000 6.01E+004 2.80E+004

MCC1 Sub3 Swgr 95.63 0.036 100.08 103.42 103.51 0.016 0.000 1.94E+004 3.43E+003

Pump 1 Sub3 Swgr 106.08 0.031 106.08 106.08 106.08 0.016 0.000 7.54E+002 4.60E+003

WTG1 Bus3 102.00 1.347 102.00 102.00 102.00 0.587 0.000 3.09E+000 1.05E+002

Bus2 Bus1 91.42 0.000 96.67 100.57 100.75 0.000 0.000

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 11
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Sub 3

Prefault voltage = 4.243 kV = 102.00 % of nominal bus kV ( 4.160 kV)


= 102.00 % of base kV ( 4.160 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Sub 3 Total 0.00 39.334 0.00 109.72 108.90 34.181 34.181 1.36E+000 3.60E+001 1.31E+000 5.23E+001

Sub3 Swgr Sub 3 0.40 1.003 0.24 109.75 108.99 0.606 0.000 2.41E+002 1.39E+003

Bus3 Sub 3 4.62 12.996 2.67 109.88 110.12 7.520 0.000 5.74E+000 1.09E+002

Bus1 Sub 3 0.00 0.000 62.87 63.35 101.93 0.000 0.000

# Main Bus Sub 3 87.62 24.981 90.05 101.78 101.67 25.676 33.656 1.35E+000 5.67E+001 1.27E+000 5.32E+001

# Sub2B Sub 3 89.91 0.367 96.77 96.89 101.93 0.388 0.527 * 3.68E+002 3.84E+003 3.24E+002 3.38E+003

Bus9 Sub3 Swgr 8.01 0.252 4.65 110.65 110.67 0.146 0.000 9.25E+002 5.52E+003

LVBus Sub3 Swgr 6.01 0.103 63.99 65.74 101.92 0.060 0.000 5.05E+003 1.27E+004

MCC1 Sub3 Swgr 17.96 0.348 69.73 71.08 104.55 0.201 0.000 4.76E+002 4.03E+003

Pump 1 Sub3 Swgr 106.08 0.302 106.08 106.08 106.08 0.200 0.000 7.54E+002 4.60E+003

WTG1 Bus3 102.00 12.996 102.00 102.00 102.00 7.520 0.000 3.09E+000 1.05E+002

Bus2 Bus1 0.00 0.000 62.87 63.35 101.93 0.000 0.000

Sub2A Main Bus 89.42 0.044 96.56 96.63 101.98 0.025 0.000 3.84E+001 5.50E+002

# Sub2B Main Bus 89.91 0.080 96.77 96.89 101.93 0.175 0.380 * 1.06E+001 3.01E+002 1.18E+000 4.80E+001

Utility Main Bus 102.00 2.889 102.00 102.00 102.00 2.896 3.678 1.85E-001 8.33E+000 1.10E-001 4.96E+000

Bus6 Sub2B 89.91 0.012 96.77 96.89 101.93 0.006 0.000 1.71E+004 4.24E+003

Gen1 Sub2B 102.00 0.235 102.00 102.00 102.00 0.118 0.000 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.064 106.64 106.64 106.64 0.034 0.000 3.15E+001 7.87E+002

LUMP6 Bus9 102.00 0.252 102.00 102.00 102.00 0.146 0.000 7.69E+002 5.13E+003

LUMP1 LVBus 106.43 0.895 106.43 106.43 106.43 0.448 0.000 5.01E+003 1.19E+004

Mtr6 MCC1 109.16 0.602 109.16 109.16 109.16 0.302 0.000 2.69E+003 1.62E+004

Mtr4 MCC1 181.28 1.713 181.28 181.28 181.28 0.859 0.000 6.60E+002 5.75E+003 6.60E+002 5.75E+003

Mtr3 MCC1 109.16 0.372 109.16 109.16 109.16 0.186 0.000 3.91E+003 2.64E+004

Mtr5 MCC1 109.16 0.253 109.16 109.16 109.16 0.127 0.000 7.00E+003 3.85E+004

Bus7 Sub2A 89.43 0.065 96.57 96.63 101.98 0.033 0.000 3.25E+003 2.39E+002

Syn1 Sub2A 106.64 0.044 106.64 106.64 106.64 0.022 0.000 4.45E+001 1.20E+003

Sub23 Bus6 90.28 0.012 100.24 95.28 100.38 0.006 0.000 1.71E+004 4.24E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 12
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Sub3 Swgr

Prefault voltage = 4.243 kV = 102.00 % of nominal bus kV ( 4.160 kV)


= 102.00 % of base kV ( 4.160 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Sub3 Swgr Total 0.00 34.891 0.00 109.62 113.11 29.162 29.162 4.09E+000 4.04E+001 1.03E+001 6.38E+001

Sub 3 Sub3 Swgr 13.37 33.887 17.64 109.39 106.94 28.580 29.162 4.13E+000 4.16E+001 1.03E+001 6.38E+001

Bus9 Sub3 Swgr 7.65 0.253 4.26 110.62 114.70 0.141 0.000 9.25E+002 5.52E+003

LVBus Sub3 Swgr 5.72 0.104 66.16 65.65 101.93 0.058 0.000 5.05E+003 1.27E+004

MCC1 Sub3 Swgr 17.66 0.349 71.70 71.14 104.55 0.194 0.000 4.76E+002 4.03E+003

Pump 1 Sub3 Swgr 106.08 0.304 106.08 106.08 106.08 0.193 0.000 7.54E+002 4.60E+003

Bus3 Sub 3 17.45 11.487 19.90 109.60 107.93 6.392 0.000 5.74E+000 1.09E+002

Bus1 Sub 3 13.37 0.000 71.02 65.15 101.93 0.000 0.000

# Main Bus Sub 3 89.32 22.080 91.88 101.78 101.77 21.859 28.714 1.35E+000 5.67E+001 1.27E+000 5.32E+001

# Sub2B Sub 3 91.34 0.324 97.82 97.41 101.95 0.330 0.449 * 3.68E+002 3.84E+003 3.24E+002 3.38E+003

LUMP6 Bus9 102.00 0.253 102.00 102.00 102.00 0.141 0.000 7.69E+002 5.13E+003

LUMP1 LVBus 106.43 0.898 106.43 106.43 106.43 0.433 0.000 5.01E+003 1.19E+004

Mtr6 MCC1 109.16 0.604 109.16 109.16 109.16 0.291 0.000 2.69E+003 1.62E+004

Mtr4 MCC1 181.28 1.719 181.28 181.28 181.28 0.829 0.000 6.60E+002 5.75E+003 6.60E+002 5.75E+003

Mtr3 MCC1 109.16 0.373 109.16 109.16 109.16 0.180 0.000 3.91E+003 2.64E+004

Mtr5 MCC1 109.16 0.254 109.16 109.16 109.16 0.122 0.000 7.00E+003 3.85E+004

WTG1 Bus3 102.00 11.487 102.00 102.00 102.00 6.392 0.000 3.09E+000 1.05E+002

Bus2 Bus1 13.37 0.000 71.02 65.15 101.93 0.000 0.000

Sub2A Main Bus 90.90 0.039 97.66 97.18 101.98 0.022 0.000 3.84E+001 5.50E+002

# Sub2B Main Bus 91.34 0.071 97.82 97.41 101.95 0.149 0.324 * 1.06E+001 3.01E+002 1.18E+000 4.80E+001

Utility Main Bus 102.00 2.553 102.00 102.00 102.00 2.465 3.138 1.85E-001 8.33E+000 1.10E-001 4.96E+000

Bus6 Sub2B 91.34 0.011 97.82 97.41 101.95 0.005 0.000 1.95E+004 5.60E+003

Gen1 Sub2B 102.00 0.207 102.00 102.00 102.00 0.100 0.000 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.057 106.64 106.64 106.64 0.029 0.000 3.15E+001 7.87E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 13
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Sub22

Prefault voltage = 3.519 kV = 102.00 % of nominal bus kV ( 3.450 kV)


= 102.00 % of base kV ( 3.450 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Sub22 Total 0.00 10.941 0.00 99.00 99.24 11.589 11.589 1.21E+001 1.56E+002 1.07E+001 1.30E+002

Bus7 Sub22 65.32 8.408 83.06 101.97 83.63 9.801 11.589 * 1.45E+001 2.02E+002 1.07E+001 1.30E+002

LUMP2 Sub22 106.64 2.534 106.64 106.64 106.64 1.789 0.000 6.70E+001 6.70E+002

Sub2A Bus7 65.84 2.102 83.18 101.97 84.02 1.286 0.000 1.03E+002 3.86E+001

Main Bus Sub2A 98.41 1.976 101.32 101.42 99.47 1.207 0.000 * 1.09E+002 4.00E+001

Syn1 Sub2A 106.64 0.126 106.64 106.64 106.64 0.079 0.000 4.45E+001 1.20E+003

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Example
ETAP Page: 14
19.5.0D
Location: Irvine, California Date: 05-12-2020
Contract: OTI-12345678 SN: DLRPTILTDA
Engineer: Operation Technology, Inc. Revision: Base
Study Case: SM
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "SM" study case.

Fault at bus: Sub23

Prefault voltage = 3.519 kV = 102.00 % of nominal bus kV ( 3.450 kV)


= 102.00 % of base kV ( 3.450 kV)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Sub23 Total 0.00 10.317 0.00 98.33 98.13 11.126 11.126 1.37E+001 1.65E+002 1.07E+001 1.30E+002

Bus23A Sub23 18.80 0.421 63.05 65.23 104.49 0.302 0.000 1.12E+003 3.90E+003

Bus6 Sub23 76.95 9.905 88.77 101.86 89.02 10.830 11.126 * 1.28E+001 1.72E+002 1.07E+001 1.30E+002

Mtr1 Bus23A 132.15 0.968 132.15 132.15 132.15 0.602 0.000 1.12E+003 1.01E+004

LUMP4 Bus23A 125.54 2.008 125.54 125.54 125.54 1.249 0.000 1.90E+003 4.51E+003

Sub2B Bus6 77.44 2.476 88.87 101.86 89.43 1.542 0.000 8.63E+001 1.29E+001

# Main Bus Sub2B 98.54 1.842 101.34 101.41 99.54 1.133 0.000 1.15E+002 1.71E+001

# Sub 3 Sub2B 99.45 0.027 101.52 101.56 100.19 0.017 0.000 7.86E+003 5.98E+002

Gen1 Sub2B 102.00 0.477 102.00 102.00 102.00 0.306 0.000 1.13E+001 2.15E+002 1.13E+001 7.93E+001

Mtr2 Sub2B 106.64 0.131 106.64 106.64 106.64 0.087 0.000 3.15E+001 7.87E+002

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer