Project: ETAP Page: 1

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus2


Nominal kV = 13.800
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus2 Total 0.00 44.829 0.00 104.62 108.95 47.574 47.574 5.10E-001 1.13E+001 1.36E+000 9.53E+000

Bus14 Bus2 94.81 24.870 105.16 115.34 104.35 17.409 0.000 7.77E-001 2.04E+001

SG-1401 Bus2 10.15 0.365 67.42 65.27 112.09 0.255 0.000 1.61E+002 1.38E+003

GEN 101 Bus2 110.00 19.597 110.00 110.00 110.00 29.916 47.574 1.36E+000 2.59E+001 1.36E+000 9.53E+000

U1 Bus14 115.50 2.179 115.50 115.50 115.50 1.311 0.000 4.05E-001 3.64E+000 2.02E+001 1.82E+002

SB-1401A SG-1401 13.97 0.151 100.17 43.68 98.86 0.092 0.000 2.50E+003 6.12E+003

Vaccum A/B SG-1401 112.82 0.274 112.82 112.82 112.82 0.167 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 112.82 0.200 112.82 112.82 112.82 0.122 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 13.91 0.149 100.12 43.63 98.90 0.091 0.000 2.31E+003 6.30E+003

DB-121 Bus11 16.43 0.004 100.77 45.43 98.70 0.002 0.000 4.37E+004 2.66E+005

DB-131 Bus11 15.23 0.003 100.61 44.59 98.65 0.002 0.000 5.47E+004 3.28E+005

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 44.829 47.574 39.239 47.202
Peak Current (kA), Method C : 118.965 126.250 104.130 125.260
Breaking Current (kA, rms, symm) : 47.574 39.239 47.202
Steady State Current (kA, rms) : 43.224 47.574 39.239 47.202

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 2

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: Bus11


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus11 Total 0.00 8.571 0.00 110.14 110.37 8.531 8.531 1.37E+001 1.23E+002 1.46E+001 1.24E+002

DB-121 Bus11 6.79 0.004 66.32 65.04 109.95 0.003 0.000 1.06E+005 2.44E+005

DB-131 Bus11 5.50 0.003 65.82 64.74 109.95 0.002 0.000 1.30E+005 3.01E+005

SB-1402A SG-1402 4.03 0.160 64.80 64.90 109.95 0.106 0.000 1.45E+003 6.45E+003

Bus2 SG-1401 98.31 7.736 102.75 107.19 102.98 7.978 8.531 * 1.51E+001 1.36E+002 1.46E+001 1.24E+002

SB-1401A SG-1401 4.09 0.162 64.90 64.85 109.95 0.108 0.000 1.19E+003 6.41E+003

Vaccum A/B SG-1401 110.00 0.294 110.00 110.00 110.00 0.195 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 110.00 0.214 110.00 110.00 110.00 0.142 0.000 3.20E+002 4.92E+003

CL-2 DB-121 110.00 0.063 110.00 110.00 110.00 0.036 0.000 9.67E+004 2.30E+005

CL-3 DB-131 110.00 0.051 110.00 110.00 110.00 0.029 0.000 1.21E+005 2.88E+005

Load 5 SB-1402A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 110.00 0.751 110.00 110.00 110.00 0.432 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 110.00 0.920 110.00 110.00 110.00 0.529 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Bus14 Bus2 110.92 2.026 112.34 112.31 111.50 1.143 0.000 1.19E+002 2.49E+001

GEN 101 Bus2 107.25 1.596 107.25 107.25 107.25 0.939 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

CT 1-4 SB-1401A 110.00 0.263 110.00 110.00 110.00 0.151 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 110.00 1.665 110.00 110.00 110.00 0.957 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004
Project: ETAP Page: 3

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

(Cont.)

Fault at bus: Bus11


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.571 8.531 7.428 8.560
Peak Current (kA), Method C : 20.893 20.796 18.107 20.867
Breaking Current (kA, rms, symm) : 8.531 7.428 8.560
Steady State Current (kA, rms) : 8.412 8.531 7.428 8.560

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 4

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: Bus14


Nominal kV = 150.000
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus14 Total 0.00 12.549 0.00 150.83 147.34 5.754 5.754 3.54E-001 3.36E+000 4.54E-001 1.53E+001

Bus2 Bus14 41.61 1.004 89.96 91.63 104.54 2.069 5.274 * 1.74E+000 4.21E+001 3.72E-001 1.67E+001

U1 Bus14 110.00 11.547 110.00 110.00 110.00 3.685 0.482 4.05E-001 3.64E+000 2.02E+001 1.82E+002

SG-1401 Bus2 48.50 0.209 102.43 89.68 103.83 0.055 0.000 1.02E+003 1.19E+003

GEN 101 Bus2 104.76 11.253 104.76 104.76 104.76 2.993 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 12.549 5.754 10.882 11.167
Peak Current (kA), Method C : 30.787 14.117 26.696 27.396
Breaking Current (kA, rms, symm) : 5.754 10.882 11.167
Steady State Current (kA, rms) : 12.524 5.754 10.882 11.167

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 5

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: DB-121


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB-121 Total 0.00 1.025 0.00 105.55 106.47 1.005 1.005 8.40E+003 1.30E+004 9.10E+003 1.36E+004

Bus11 DB-121 104.30 0.962 104.56 105.00 104.76 0.964 1.005 * 9.11E+003 1.38E+004 9.10E+003 1.36E+004

CL-2 DB-121 105.00 0.064 105.00 105.00 105.00 0.042 0.000 9.67E+004 2.30E+005

DB-131 Bus11 104.34 0.000 104.57 104.79 104.99 0.000 0.000

SB-1402A SG-1402 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.66E+005 3.68E+005

Bus2 SG-1401 102.32 0.055 102.36 102.37 102.34 0.031 0.000 * 6.29E+003 6.95E+003

SB-1401A SG-1401 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.75E+005 3.53E+005

Vaccum A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.025 1.005 0.887 1.020
Peak Current (kA), Method C : 1.687 1.655 1.461 1.679
Breaking Current (kA, rms, symm) : 1.005 0.887 1.020
Steady State Current (kA, rms) : 0.962 1.005 0.887 1.020

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 6

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: DB-131


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

DB-131 Total 0.00 1.012 0.00 105.40 106.17 0.997 0.997 8.54E+003 1.32E+004 9.10E+003 1.36E+004

Bus11 DB-131 104.30 0.962 104.56 105.00 104.76 0.964 0.997 * 9.11E+003 1.38E+004 9.10E+003 1.36E+004

CL-3 DB-131 105.00 0.051 105.00 105.00 105.00 0.033 0.000 1.21E+005 2.88E+005

DB-121 Bus11 104.35 0.000 104.57 104.80 104.99 0.000 0.000

SB-1402A SG-1402 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.66E+005 3.68E+005

Bus2 SG-1401 102.32 0.055 102.36 102.37 102.34 0.031 0.000 * 6.29E+003 6.95E+003

SB-1401A SG-1401 104.33 0.001 104.56 104.79 104.99 0.001 0.000 2.75E+005 3.53E+005

Vaccum A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.002 105.00 105.00 105.00 0.001 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 1.012 0.997 0.877 1.009
Peak Current (kA), Method C : 1.664 1.639 1.441 1.658
Breaking Current (kA, rms, symm) : 0.997 0.877 1.009
Steady State Current (kA, rms) : 0.962 0.997 0.877 1.009

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 7

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1401A


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1401A Total 0.00 45.709 0.00 99.18 100.06 50.847 50.847 5.14E+001 3.44E+002 3.98E+001 2.39E+002

SG-1401 SB-1401A 69.17 43.179 85.31 104.98 86.40 48.971 50.847 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

CT 1-4 SB-1401A 105.00 0.261 105.00 105.00 105.00 0.193 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 105.00 1.651 105.00 105.00 105.00 1.224 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.34E+001

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 70.48 0.052 79.42 98.78 99.64 0.033 0.000 1.02E+004 1.48E+003

DB-121 Bus11 71.37 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.80E+004

DB-131 Bus11 70.95 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.11E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.709 50.847 39.595 49.072
Peak Current (kA), Method C : 106.611 118.595 92.349 114.454
Breaking Current (kA, rms, symm) : 50.847 39.595 49.072
Steady State Current (kA, rms) : 44.814 50.847 39.595 49.072

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 8

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1401B


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1401B Total 0.00 45.709 0.00 99.18 100.06 50.847 50.847 5.14E+001 3.44E+002 3.98E+001 2.39E+002

Load 1 SB-1401B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1401 SB-1401A 69.17 43.179 85.31 104.98 86.40 48.971 50.847 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

CT 1-4 SB-1401A 105.00 0.261 105.00 105.00 105.00 0.193 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 105.00 1.651 105.00 105.00 105.00 1.224 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.34E+001

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 70.48 0.052 79.42 98.78 99.64 0.033 0.000 1.02E+004 1.48E+003

DB-121 Bus11 71.37 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.80E+004

DB-131 Bus11 70.95 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.11E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.709 50.847 39.595 49.072
Peak Current (kA), Method C : 106.611 118.595 92.349 114.454
Breaking Current (kA, rms, symm) : 50.847 39.595 49.072
Steady State Current (kA, rms) : 44.814 50.847 39.595 49.072

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 9

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1402A


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1402A Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 10

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1402B


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1402B Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 11

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1403A


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1403A Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 12

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SB-1403B


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SB-1403B Total 0.00 45.670 0.00 99.22 100.00 50.814 50.814 5.21E+001 3.44E+002 3.98E+001 2.39E+002

LV Motor2 SB-1403B 105.00 0.911 105.00 105.00 105.00 0.676 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

SG-1402 SB-1402A 69.18 43.185 85.31 104.98 86.40 48.971 50.814 * 5.36E+001 3.64E+002 3.98E+001 2.39E+002

Load 5 SB-1402A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 105.00 0.744 105.00 105.00 105.00 0.552 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 105.00 0.214 105.00 105.00 105.00 0.159 0.000 2.88E+004 6.84E+004

DB-121 Bus11 71.38 0.001 80.08 98.76 99.92 0.001 0.000 4.12E+005 1.82E+004

DB-131 Bus11 70.96 0.001 79.77 98.72 99.84 0.001 0.000 5.08E+005 2.13E+004

Bus2 SG-1401 99.47 2.522 101.76 101.91 100.24 1.620 0.000 * 2.05E+002 5.33E+001

SB-1401A SG-1401 70.51 0.053 79.44 98.77 99.66 0.034 0.000 9.94E+003 1.82E+003

Vaccum A/B SG-1401 105.00 0.096 105.00 105.00 105.00 0.061 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 105.00 0.070 105.00 105.00 105.00 0.045 0.000 3.20E+002 4.92E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 45.670 50.814 39.560 49.013
Peak Current (kA), Method C : 106.311 118.287 92.090 114.093
Breaking Current (kA, rms, symm) : 50.814 39.560 49.013
Steady State Current (kA, rms) : 44.610 50.814 39.560 49.013

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 13

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SG-1401


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SG-1401 Total 0.00 8.571 0.00 110.14 110.37 8.531 8.531 1.37E+001 1.23E+002 1.46E+001 1.24E+002

Bus2 SG-1401 98.31 7.736 102.75 107.19 102.98 7.978 8.531 * 1.51E+001 1.36E+002 1.46E+001 1.24E+002

SB-1401A SG-1401 4.09 0.162 64.90 64.85 109.95 0.108 0.000 1.19E+003 6.41E+003

Vaccum A/B SG-1401 110.00 0.294 110.00 110.00 110.00 0.195 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 110.00 0.214 110.00 110.00 110.00 0.142 0.000 3.20E+002 4.92E+003

SB-1402A SG-1402 4.03 0.160 64.80 64.90 109.95 0.106 0.000 1.45E+003 6.45E+003

DB-121 Bus11 6.79 0.004 66.32 65.04 109.95 0.003 0.000 1.06E+005 2.44E+005

DB-131 Bus11 5.50 0.003 65.82 64.74 109.95 0.002 0.000 1.30E+005 3.01E+005

Bus14 Bus2 110.92 2.026 112.34 112.31 111.50 1.143 0.000 1.19E+002 2.49E+001

GEN 101 Bus2 107.25 1.596 107.25 107.25 107.25 0.939 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

CT 1-4 SB-1401A 110.00 0.263 110.00 110.00 110.00 0.151 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 110.00 1.665 110.00 110.00 110.00 0.957 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 5 SB-1402A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 110.00 0.751 110.00 110.00 110.00 0.432 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 110.00 0.920 110.00 110.00 110.00 0.529 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

CL-2 DB-121 110.00 0.063 110.00 110.00 110.00 0.036 0.000 9.67E+004 2.30E+005

CL-3 DB-131 110.00 0.051 110.00 110.00 110.00 0.029 0.000 1.21E+005 2.88E+005
Project: ETAP Page: 14

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

(Cont.)

Fault at bus: SG-1401


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.571 8.531 7.428 8.560
Peak Current (kA), Method C : 20.893 20.796 18.107 20.867
Breaking Current (kA, rms, symm) : 8.531 7.428 8.560
Steady State Current (kA, rms) : 8.412 8.531 7.428 8.560

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: ETAP Page: 15

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

Fault at bus: SG-1402


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

SG-1402 Total 0.00 8.571 0.00 110.14 110.37 8.531 8.531 1.37E+001 1.23E+002 1.46E+001 1.24E+002

SB-1402A SG-1402 4.03 0.160 64.80 64.90 109.95 0.106 0.000 1.45E+003 6.45E+003

DB-121 Bus11 6.79 0.004 66.32 65.04 109.95 0.003 0.000 1.06E+005 2.44E+005

DB-131 Bus11 5.50 0.003 65.82 64.74 109.95 0.002 0.000 1.30E+005 3.01E+005

Bus2 SG-1401 98.31 7.736 102.75 107.19 102.98 7.978 8.531 * 1.51E+001 1.36E+002 1.46E+001 1.24E+002

SB-1401A SG-1401 4.09 0.162 64.90 64.85 109.95 0.108 0.000 1.19E+003 6.41E+003

Vaccum A/B SG-1401 110.00 0.294 110.00 110.00 110.00 0.195 0.000 1.82E+002 3.59E+003

Hotweel A/B SG-1401 110.00 0.214 110.00 110.00 110.00 0.142 0.000 3.20E+002 4.92E+003

Load 5 SB-1402A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Fire Pump SB-1403A 110.00 0.751 110.00 110.00 110.00 0.432 0.000 3.02E+003 2.11E+004

Load 7 SB-1403A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 4 SB-1402B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

LV Motor2 SB-1403B 110.00 0.920 110.00 110.00 110.00 0.529 0.000 2.21E+003 1.73E+004

Load 6 SB-1403B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

CL-2 DB-121 110.00 0.063 110.00 110.00 110.00 0.036 0.000 9.67E+004 2.30E+005

CL-3 DB-131 110.00 0.051 110.00 110.00 110.00 0.029 0.000 1.21E+005 2.88E+005

Bus14 Bus2 110.92 2.026 112.34 112.31 111.50 1.143 0.000 1.19E+002 2.49E+001

GEN 101 Bus2 107.25 1.596 107.25 107.25 107.25 0.939 0.000 1.36E+000 2.59E+001 1.36E+000 9.53E+000

CT 1-4 SB-1401A 110.00 0.263 110.00 110.00 110.00 0.151 0.000 1.47E+004 5.91E+004

LV Motor1 SB-1401A 110.00 1.665 110.00 110.00 110.00 0.957 0.000 8.98E+002 9.58E+003

Load 2 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 3 SB-1401A 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004

Load 1 SB-1401B 110.00 0.216 110.00 110.00 110.00 0.124 0.000 2.88E+004 6.84E+004
Project: ETAP Page: 16

Location: 20.6.0C Date: 12-06-2023

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: TUGAS ADE Config.: Normal

(Cont.)

Fault at bus: SG-1402


Nominal kV = 6.300
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.571 8.531 7.428 8.560
Peak Current (kA), Method C : 20.893 20.796 18.107 20.867
Breaking Current (kA, rms, symm) : 8.531 7.428 8.560
Steady State Current (kA, rms) : 8.412 8.531 7.428 8.560

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.