You are on page 1of 4

8/27/2018 Widi Antoro | LinkedIn

Free Upgrade
Search
to Premium

People Also Viewed


Widi Antoro • 2nd BP

Tangguh Engineering Advisor at BP Gajah Mada University


Dieni Indarti • 2nd
Yogyakarta , Indonesia
West Papua Province, Indonesia Rotating Equipment Engineer at BP
See contact info

Connect Message More… 500+ connections Tri Langgana Hermawan •…


Facility Engineer

SUMMARY OF EXPERIENCES Thirty one years’ experience in LNG industry, up‐stream Oil and Gas
Agustinus Dody Widyanto…
Company and Oil and Gas services company, Fifteen years of which had been worked with ARUN LNG as ESM at BP
an Electrical Engineer and almost Nine years been working with Bp Tangguh LNG as currently playing a ...
Isye Hayatina • 2nd
Sr. Process Engineer at INPEX
Show more Corporation

Patricia Njoto • 2nd


A self‐motivated individual with 10
Highlights years’ experience in managing complex
projects within oil & gas and mining
1 Mutual Connection industry.
You and Widi both know Yosef Windra
Yuhendra . • 2nd
Maintenance Mechanical Specialist at
BP Tangguh LNG

Experience emal saismal • 2nd


Tangguh LNG operation Utilities at BP
Tangguh Engineering Advisor Berau Ltd
BP
Aug 2016 – Present • 2 yrs 1 mo Dunda Wachyudin • 2nd
Tangguh LNG Bintuni Bey West Papua , Indonesia Supervisor at BP

Advise, lead and organize Process, Instrument & control, Rotating equipment, Electrical, Mechanical
Dhareta Sasanawati • 2nd
engineering and Process safety, ensuring they are carrying main role and
Industrial Hygiene Advisor at BP
responsibility to address an issues related to design, defect elimination, production efficiencies and
operation optimization , provided Plant trip root cause analysis and support to bring safe startup
and manage identifying vulnerabilities items and follow‐up action. The team of Area Engineering Dhita Bimantha Prawira • …
should keep an eye of Safety Critical System performance standard, control management of change Electrical Engineer at BP
for
both plant and non‐plant facility, involve in RCFA , ensure that Plant Chemistry surveillances are well
monitored and Process surveillance on plant operating parameter and Safe Operating Limit. Learn the skills Widi has
Ensure that engineering site team will get fully involve in determining the root cause of problem,
initiating rectification plan and develop plan forward for implementation when plant major problem DevOps Foundations: Site
encountered in the field.
Reliability Engineering
Viewers: 2,194

Tangguh Engineering Support Manager


F#: Automated Testing for
BP
Developers
Nov 2011 – Aug 2016 • 4 yrs 10 mos Viewers: 5,257
Tangguh LNG Bintuni Bey West Papua , Indonesia
Messaging

https://www.linkedin.com/in/widi­antoro­80781911a/ 1/4
8/27/2018 Widi Antoro | LinkedIn
currently leads and organizes Process, Instrument & control, Rotating equipment, Electrical, Building the Product and
Free Upgrade
Search
Mechanical engineering and Laboratory Group, carries main role and responsibility to address many
Working with Stakeholders
to Premium
issues related to design, defect elimination, production efficiencies and operation optimization ,
Viewers: 3,168
provided Plant trip root cause analysis and support to bring safe start‐up and manage identifying
vulnerabilities items and follow‐up action. In this role, the Engineering team develop Safety Critical See more courses
System performance standard, control management of change for both plant and non‐plant facility,
involve in RCFA , organize Plant Chemistry surveillances and Process surveillance on plant operating
parameter and Safe Operating Limit.
Fully involved in determining the root cause of problem, initiating rectification plan and develop
plan forward for implementation when plant major problem encountered in the field

Asia Pacific Electrical Technical Authority


BP
Nov 2007 – Nov 2011 • 4 yrs 1 mo
Tangguh LNG Bintuni Bey West Papua , Indonesia

During played a role as an Electrical Technical Authority, I involved in Bp Tangguh LNG testing
commissioning and start‐up stage, continued with some effort to achieve plant name plate,
commissioning LNG and MR Expander post contractor hand over as well as Power generating unit
performance test. The Technical Authority accountable as first point of contact for any
engineering query from the Area operations and Maintenance team, review and approve
any design change, review and approve electrical procedure and document.
Key Achievement as TA :
1. Full involved in commissioning stage of Train 1 and 2.
2. Develop young Engineers and assess electrical REP and SAEP competency.
3. Involved in some modification and additional project during the beginning stage of operation :
• Synchronization facility for 33 kV Bus B
• Purging for Amine Pump motor
• Installation 350 KW Genset for Food container
• Upgrading FinFan cooler motor
• Involved in electrical problem solving
• And other small project

Senior Electrical Engineer


Chevron
Dec 2003 – Nov 2007 • 4 yrs
Chevron Kalimantan Operation

As Sr Electrical Engineer, I provided engineering expertise in electrical area for project and running
unit for whole Chevron Kalimantan Operation.Work entails specific specialized knowledge and skills
in engineering and implementing additions and modifications to Offshore Platform and Onshore
facility Electrical/Power systems, as well as providing technical guidance on electrical matters to the
Business Teams and various Departments ﴾ Operation and Maintenance ﴿.
Regular Duty covered the followings :
Assumes the full responsibility of the Electrical /Projects Advisor, covering all related activities that
include defining project requirements, developing proposals, estimating costs, obtaining approvals,
engineering design work with Engineering company, procuring materials, advising during
construction and assisting commissioning.
Resolves engineering problems and provides technical guidance by carrying out investigations,
evaluating solutions and writing commendations. This may involve researching documentation,
organizing field tests and defining interpretation of codes and standards.
Some key Achievement :
1. Involve in Melahin Restoration project.Involved in project scoping ,closely supervised , reviewed
and approved Engineering consultant outcomes. Actively involved during equipment acceptance
test,Power Control Room construction, testing commissioning and project close out.
2. Involve in Sadewa & Seturian project for Electrical support: Fully involved in FEED phase of the
project, Equipment procurement process.
3. Project leader for :
‐Santan Compressor Station power up‐grade project, from engineering, procurement, execution.
‐Attaka ESPs project
‐Mahoni New well installation.
‐Yakin North Bravo control room up‐grade.
4. Support Engineer for other various Unocal/Chevron projects, Operation / Maintenance activity for
Chevron Indonesia Co. Kalimantan Operation

Senior Site Engineer


Premier Oil
Jun 2001 – Nov 2003 • 2 yrs 6 mos
Natuna Indonesia Messaging

https://www.linkedin.com/in/widi­antoro­80781911a/ 2/4
8/27/2018 Widi Antoro | LinkedIn
As senior site engineer station in Natuna Sea offshore platform, I played a role as a vocal point for Free Upgrade
Search
engineering matter covering Anoa well platform and AGX platform, in Mechanical, Instrument , to Premium
Process and Electrical issues. As a bridging for technical issue between Office technical person and
field technical person.
As an site Engineer, provide daily support to operation and maintenance activities. Provide technical
expertise on the area of Electrical, instrument and process. As a bridge communication between
field and ground engineering support. Area to be support cover for Electric Power generator ﴾ 2 ea
Solar 20, 2 ea Gas Engines , 1 ea Diesel engine﴿, latform electrical distribution, UPS,
Triconex PLC, DCS Foxboro , instrument and process operation.
Deep involved during commissioning and start‐up stage of AGX project until running exporting
Natural Gas to Singapore.
Start‐up 2x 1MW Solar Saturn gas turbine generator and brought there two machine can be run in
parallel.
Organized some modification that took place at old Anoa platform, such as putting in service new
fire water ring, Installed new UPS , etc
Involved in Gajah Baru project pre‐ FEED stage back in 2002
Some key achievement :
1. Anoa Gas Export Commissioning. Fully supported during AGX commissioning. Contributed
design change during the start‐up.
2. Prepare Engineering Change Proposal. Prepare a proposal for change, such as Isoch / Droop
Solar Saturn 20 automatic switch‐over, Modification of Level transmitter Suction scrubber.
3. Troubleshooting Of Solar Mars 100 Gas turbine driven compressor.
4. Review and prepare procedure for Generator parallel.
5. Load shading review. Review the PLC based ﴾ allen Bradley ﴿ load shading logic.
6. Member of Gajah Baru Bid review team. Review Tender document, prepare a clarification of
technical queries to all bidders.
7. Economizer of Refrigerant unit review.
8. UPS Project : Review doc specification. Present during FATat Gutor workshop in Wettingen
Switzerland.

Show 2 more experiences

Education
Gajah Mada University Yogyakarta , Indonesia
Bachelor’s Degree, Electrical Power Engineering
1978 – 1984

Skills & Endorsements


Gas · 22
Endorsed by Ardian Nengkoda and 1 other who is
Endorsed by 12 of Widi’s colleagues at BP
highly skilled at this

Commissioning · 20
Endorsed by Badi Amran and 2 others who are
Endorsed by 12 of Widi’s colleagues at BP
highly skilled at this

Engineering · 20
Endorsed by Adityapati Rangga and 2 others who
Endorsed by 12 of Widi’s colleagues at BP
are highly skilled at this

Show more

Accomplishments

2 Languages
Bahasa Indonesia • English

Messaging
Certification

1
https://www.linkedin.com/in/widi­antoro­80781911a/ 3/4
8/27/2018 Widi Antoro | LinkedIn

1Search
Engineering fundamental exam and Electrical Engineering exam for Proffessional Engineer from Texas
University
Free Upgrade
to Premium

Messaging

https://www.linkedin.com/in/widi­antoro­80781911a/ 4/4

You might also like