CIREBON 2, 1X1000MW COAL FIRED POWER

PROJECT, INDONESIA

SITE ACCEPTANCE TEST REPORT

400V LV SWGR A
PT.PITUIN SUKSES ENERGY

RELAY PROTECTION TEST

Location Feeder No. Feeder Name Date


COAL HANDLING
P2BGA04GS001 SPARE (MOTOR) 18-Dec-20
SYSTEM (CHS)

1. RELAY PROTECTION DATA


Device : Protection Relay (F1) Brand/Type : GE/Multilin 350
Serial No : BL1A19004386 CT Ratio : 600 / 1A & 50/1A
Model : 350-EP0G0HEENP1ENN PT Ratio : (400V/Ѵ3) / (110V/Ѵ3)
2. SETTING TABLE
No Function Setting Value TMS Curve Type
1 Phase Overcurrent Stage I> (51) 0,70 IN 4,00 s IEC Curve B
2 Phase Overcurrent Stage I>> (50) 7,00 IN 0,10 s Instant
3 Earth Fault Overcurrent Ig> (51G) 0,20 IN 0,10 s Definite Time
4 Earth Fault Overcurrent Ig>> (50G) - IN - s Disable
5 Undervoltage U< (27) 0,8 UN 2,00 s Definite Time
6 Minimum Voltage 0,1 UN - - -

3. MEASSUREMENT TEST
a. Current Chanel
x In Chanel Supply Value Measured Error (%) Tolerance Status
IL1 60 60,00 0,00 Pass
0.1 x In IL2 60 60,00 0,00 ±2.5% Pass
IL3 60 60,00 0,00 Pass
IL1 600 600,30 0,05 Pass
1.0 x In IL2 600 600,30 0,05 ±0.4% Pass
IL3 600 600,30 0,05 Pass
IL1 2400 2401,20 0,05 Pass
4.0 x In IL2 2400 2396,90 -0,13 ±2.5% Pass
IL3 2400 2401,20 0,05 Pass
b. Residual current Chanel
Chanel Supply Value Measured Error Tolerance Status
0.02 x In I0 12 12,90 7,50 ±20% Pass
0.10 x In I0 60 60,00 0,00 ±2% Pass
1.00 x In I0 600 600,30 0,05 ±0.3% Pass

Page 1 of 3
c. Voltage Chanel
Chanel Supply Value Measured Error Tolerance Status
IL1 8 9 12,50 Pass
0.02 x Un IL2 8 9 12,50 ±25% Pass
IL3 8 9 12,50 Pass
IL1 40 43 7,50 Pass
0.1 x Un IL2 40 43 7,50 ±10% Pass
IL3 40 43 7,50 Pass
UL1 400 396 -1,00 Pass
1.0 x Un UL2 400 396 -1,00 ±1% Pass
UL3 400 396 -1,00 Pass
d. Power & Frequency
Chanel Supply Value Measured Error Tolerance Status
1 x In P 414,65 411,1 -0,86 ±0.8% Pass
1 x Un Q 9,15 9,2 0,51 ±0.8% Pass
50 Hz S 414,75 411,2 -0,86 ±0.8% Pass
P.F 0,9977 0,9975 -0,02 ±0.02 Pass
f 50 50 0,00 ±10 mHz Pass

4. FUNCTION TEST
Protection Test
Protective Phase Current
No Expected (s) Actual (s) Error Tolerance Status
Function Test Injected Injected (A)
a. Phase Overcurrent (51/50)
1 Pickup (51) L1-L2-L3 0,700 Pickup Pickup - - OK
2 Drop Off (51) L1-L2-L3 0,686 Drop Off Drop Off - - OK
3 51 1.5xIset L1-L2-L3 1,050 108,000 108,200 0,185 ± 5% OK
4 51 2.0xIset L1-L2-L3 1,400 54,000 54,360 0,667 ± 5% OK
5 51 3.0xIset L1-L2-L3 2,100 27,000 27,120 0,444 ± 5% OK
6 50 7xIN L1-L2-L3 7,000 0,100 0,151 0,051 ± 50ms OK
7 50 8xIN L1-L2-L3 8,000 0,100 0,134 0,034 ± 50ms OK
b. Ground Fault Overcurrent
1 51G 1xIset Ig 0,200 0,100 0,077 -23,00 ± 5% OK
2 51G 2xIset Ig 0,400 0,100 0,074 -26,00 ± 5% OK
3 51G 3xIset Ig 0,600 0,100 0,071 -29,00 ± 5% OK

c. Under Voltage U< (27)


Protective Phase Voltage
No Expected (s) Actual (s) Error Result
Function Test Injected Injected (V)
1 27 L1-L2-L3 50,81 2,000 2,018 0,0180 OK

Page 2 of 3
5 CURRENT TRANSDUCERS TEST (TA1)
1 Measurement
Percent Current 25% 50% 75% 100%
Ph.R - Measure (mA) 8,01 12,01 16,01 20,02
Ph.S - Measure (mA) 8,00 12,00 16,00 20,01
Ph.T - Measure (mA) 8,01 12,00 16,00 20,01
6 VOLTAGE TRANSDUCERS TEST (TV1)
1 Measurement
Percent Voltage 25% 50% 75% 100%
Ph.R - Measure (mA) - - - -
Ph.S - Measure (mA) - - - -
Ph.T - Measure (mA) - - - -
7 POWER TRANSDUCES TEST (TW1)
1 Measurement
Percent (W) Injected 25% 50% 75% 100%
Ph.R - Measure (mA) - - - -
Ph.S - Measure (mA) - - - -
Ph.T - Measure (mA) - - - -
8 A METER (PA1)
1 Measurement
Percent Injected 25% 50% 75% 100%
Ph.R - Measure (A) 150 300 443 598
Ph.S - Measure (A) 150 300 444 599
Ph.T - Measure (A) 150 300 443 599
9 VOLT METER (PV1)
1 Measurement
Percent Injected 25% 50% 75% 100%
Ph.R - Measure (V) - - - -
Ph.S - Measure (V) - - - -
Ph.T - Measure (V) - - - -
10 W METER (PM1)
1 Measurement
Percent Injected 25% 50% 75% 100%
Measure (V) - - - -
Measure (A) - - - -
Measure (W) - - - -
Test Equipment :
1. Omicron CMC 256-6 (SN. BC342D)

Tested by: Witnessed by:


PT.Pituin Sukses Energy Donghwa Hyundai E&C Cirebon Power

Page 3 of 3