Professional Documents
Culture Documents
Contract: SN:
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 2 0 0 18 0 1 21
Contract: SN:
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Contract: SN:
Load
Total Number of Buses: 21 0.068 0.033 0.011 0.009 0.000 0.000 0.000 0.000
0.001 0.000
Project: ETAP Page: 4
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
Contract: SN:
Branch Connections
Contract: SN:
* Bus_1 13.200 100.000 0.0 0.078 0.030 0.000 0.000 Bus2 0.039 0.015 1.8 93.5
Bus2 13.200 100.000 0.0 0.000 0.000 0.000 0.000 Bus_1 -0.039 -0.015 1.8 93.5
Bus_2 0.240 99.387 0.0 0.000 0.000 0.000 0.000 T2 FeederBus -0.007 -0.005 21.3 79.5
Bus3 0.240 99.804 0.0 0.000 0.000 0.003 0.003 T2 FeederBus -0.003 -0.003 10.8 75.0
Bus_3 0.240 99.689 0.0 0.000 0.000 0.000 0.000 T2 FeederBus -0.003 -0.002 9.7 85.7
Bus4 0.240 99.323 -0.1 0.000 0.000 0.027 0.011 T1 FeederBus -0.027 -0.011 71.4 92.4
Bus5 13.200 100.000 0.0 0.000 0.000 0.000 0.000 Bus_1 -0.039 -0.015 1.8 93.5
Bus6 0.240 99.323 -0.1 0.000 0.000 0.027 0.011 T1 FeederBus -0.027 -0.011 71.4 92.4
* Bus7 0.240 100.000 -0.1 0.001 0.013 0.000 0.000 T2 FeederBus 0.001 0.013 30.2 8.0
Bus8 0.240 99.728 0.0 0.000 0.000 0.005 0.004 T2 FeederBus -0.005 -0.004 16.6 76.0
Bus9 0.240 99.728 0.0 0.000 0.000 0.005 0.004 T2 FeederBus -0.005 -0.004 16.6 76.0
Bus14 0.240 99.368 0.0 0.000 0.000 0.001 0.001 Bus_2 -0.001 -0.001 4.3 80.0
Bus15 0.240 99.373 0.0 0.000 0.000 0.001 0.001 Bus_2 -0.001 -0.001 3.2 80.0
Bus16 0.240 99.363 0.0 0.000 0.000 0.002 0.001 Bus_2 -0.002 -0.001 5.4 76.0
Bus17 0.240 99.370 0.0 0.000 0.000 0.001 0.001 Bus_2 -0.001 -0.001 3.9 80.0
Bus18 0.240 99.367 0.0 0.000 0.000 0.002 0.001 Bus_2 -0.002 -0.001 4.5 82.0
Bus20 0.240 99.677 0.0 0.000 0.000 0.001 0.000 Bus_3 -0.001 0.000 2.7 89.9
Bus21 0.240 99.669 0.0 0.000 0.000 0.001 0.001 Bus_3 -0.001 -0.001 4.5 80.0
Bus22 0.240 99.677 0.0 0.000 0.000 0.001 0.000 Bus_3 -0.001 0.000 2.7 89.9
T1 FeederBus 0.240 99.945 0.0 0.000 0.000 0.000 0.000 Bus4 0.027 0.011 71.4 92.4
Project: ETAP Page: 8
Contract: SN:
T2 FeederBus 0.240 99.945 0.0 0.000 0.000 0.000 0.000 Bus3 0.003 0.003 10.8 75.0
Contract: SN:
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 10
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Chiller Cable1 -0.027 -0.011 0.027 0.011 0.2 0.1 99.3 99.9 0.62
Chiller Cable2 -0.027 -0.011 0.027 0.011 0.2 0.1 99.3 99.9 0.62
Feeder Cable1 -0.003 -0.003 0.003 0.003 0.0 0.0 99.8 99.9 0.14
Feeder Cable10 0.002 0.001 -0.002 -0.001 0.0 0.0 99.4 99.4 0.02
Feeder Cable11 0.001 0.000 -0.001 0.000 0.0 0.0 99.7 99.7 0.01
Feeder Cable12 0.001 0.000 -0.001 0.000 0.0 0.0 99.7 99.7 0.01
Feeder Cable13 0.001 0.001 -0.001 -0.001 0.0 0.0 99.7 99.7 0.02
Feeder Cable2 -0.005 -0.004 0.005 0.004 0.0 0.0 99.7 99.9 0.22
Feeder Cable3 -0.005 -0.004 0.005 0.004 0.0 0.0 99.7 99.9 0.22
Feeder Cable4 -0.007 -0.005 0.007 0.005 0.0 0.0 99.4 99.9 0.56
Feeder Cable5 -0.003 -0.002 0.003 0.002 0.0 0.0 99.7 99.9 0.26
Feeder Cable6 0.001 0.001 -0.001 -0.001 0.0 0.0 99.4 99.4 0.02
Feeder Cable7 0.002 0.001 -0.002 -0.001 0.0 0.0 99.4 99.4 0.02
Feeder Cable8 0.001 0.001 -0.001 -0.001 0.0 0.0 99.4 99.4 0.01
Feeder Cable9 0.001 0.001 -0.001 -0.001 0.0 0.0 99.4 99.4 0.02
Gen. Cable 0.001 0.013 -0.001 -0.013 0.0 0.0 100.0 99.9 0.05
T_1 0.039 0.015 -0.039 -0.015 0.0 0.0 100.0 100.0 0.00
T_2 0.039 0.015 -0.039 -0.015 0.0 0.0 100.0 100.0 0.00
0.4 0.3
Contract: SN:
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Contract: SN:
MW Mvar MVA % PF
Number of Iterations: 1