You are on page 1of 2

Weekly Report

(September 30 - October 5, 2019)

Submitted by: Justin Aries V. Tungol

Daily Activities

Date Activity Remarks and Additonal Learnings

 The results of Investigation is


 Study the results of PCPC’s investigation
mainly wrong or faulty engineering
to the incident happened at Ilo-Ilo job site
design and lack of proper
which is the toppled off and damaged
maintenance to the equipment
Gantry Crane
September 30, 2019  This incident can be prevented by
 Write a letter of response to the letter
ensuring equipment conform to the
received by NEPC which is the Result of
right specifications and undergo a
PCPC’s investigation.
systematic maintenance.
.

 China conducts its Military Parade


 Watch China’s Military Parade to commemorate the 70th
October 1, 2019  Cleaning of Office anniversary of the foundation of the
Peoples Republic of China
 Half Day, No Work in the Afternoon

October 2, 2019  No Work, Holiday in China  N/A

 2GO Group Inc. Is one the country’s


leading end-to-end supply chain
logistics company. 2GO has made
October 3, 2019 its mark for providing class-leading
 Talked with 2GO logistics Inc.and ask for travel experiences, efficient
a quote for its logistics services movement of products and cargoes,
and catalyzing business growth in
domestic and international markets.
 Convert or Transfer content in the Image
to a word document file.
October 4, 2019
 Help Mr, Li Yang to online book a hotel in
Cagayan De Oro
 One of the Effective way to keep
up with equipment maintenance is to
have a schedule and routine
maintenance.
 Research about different equipment
October 5, 2019  Maintenance allows for
maintenance procedures and process.
equipment to operate at an optimal
performance level, and can prevent
larger and more costly problems that
may arise in the future.

You might also like