You are on page 1of 1

ITEMS ACTUEL NOMINAL

SG-4020 4726 4725


SG-4020 4726 4725
SG-4020 4725 4725
SG-4020 4726 4725
SG-4020 2426 4725
SG-4020 4725 4725
SG-4020 4725 4725
SG-4020 4724 4725
SG-4020 4725 4725
SG-4020 4725 4725
REFERENCE DRAWINGS:-
SG-4020 4725 4725
Trade Drawing Description Drawing Number
SG-4020 4725 4725
SG-4020 4724 4725
SG-4020 4726 4725
SG-4020 4726 4725
SG-4020 4726 4725
REFERENCE DOCUMENTS:-
SG-4020 4724 4725
Trade Type Document No.
SG-4020 4724 4725
SG-4020 4726 4725
SG-4020 4726 4725
SG-4020 4724 4725 Abbreviations/ Symbols:

SG-4020 4725 4725 TOC = TOP OF CONCRETE


SG-4020 4724 4725 NTS = NOT TO SCALE

SG-4020 4724 4725 TOS = TOP TO STEEL


= DENOTES MEMBER ORIENTATION MARK & ASSEMBLY MARK LOCATION.
SG-4020 4724 4725
SG-4020 4724.5 4725 NOTES :
SG-4020 4725 4725
SG-4020 4725 4725
SG-4020
SG-4020
4725
4726.5
4725
4725
INSPECTION MEASURMENT

ENGINEER ACTION:
(A ) Proceed
(B ) Proceed with comments
(C ) Do not proceed, Revise & Resubmit
(D ) Rejected
(E ) Information only

CLIENT:

GAMBIA GROUNDNUT CORPORATION - GAMBIA


UPN120 x 4725

4725
STRUCTURAL CONSULTANT :
25

4650

4700
75

25 50 4575 50 25
0

SG-4020
PROF. DR.
UPN120
NOUR EL - DIN M. ABD ALLAH
35

35
CONTRACTOR:
4*D14 4*D14
120

120
50

50
35

35
Drawing Title:-

REHABILITION OF THE MAIN DEPOT IN GAMBIA

GIRT
SG-4020
DATE SCALE
GENERAL NOTES:
t2

tp = MIN. (t1,t2)
16.02.2020 N.T.S
1- ALL FILLET WELD SIZE EQUAL TO :.
ts=tp for tp< or = 6mm
ts=tp-2 for tp>6mm U.N.O t1 ts
IH PROJOECT NO. DRAWING NUMBER SH.NO. REV.
30XSG-4020
Tekla structures

MATERIAL LIST FOR ASSEMBLY MK'D SG-4020 30 No. Required DRAWING PROJECT PHASE
Length TYPE MARK NO.
Mark Profile No. 00
00 INSPECTION 16/02/2020 I.S S.A.INTER O.M 4725 IH19-14 GA ALL
Rev. DESCRIBTION OF JOB DATE PREP. CHECK APP.
SG-4020 UPN120 1 AD
Total

You might also like