[ARCHEN TECHNOLOGIES, INC.
STATEMENT OF EXPENSES / Liquidation FPG Jsv 200110
Name: JesolitoS.villarin
ACCOUNT No. 93201081601
Dare:
DEPARMENT _FPGO33
Jarwary 10, 2020,
[A PROJECT [SITE VISITED/ COSS #/ DOSS. Inspection of Caticlan Aviation Fuel FaclRy Project oa/an2020 (Cw Gos’)
vataste sa
of Nol ORNON-VAT
are | eno no, [sales inv No mw sueurr PARTICULARS amount | var | rora
JD Wtor be Guzman [Ton Fare rom Residence NAIA]
e1an20 onsoas | 192370420 francisco 2 0050 30050
10020 | cyton2 {081179 | 179-660087-001_|@ ten. suit wotelAccomodston | 147a.2n_|_7679_| 165000
1an20 corae70 | 206083-016001 KB) _ Rex6. Vilar eakast $500 95.00
Micelaneous, 2 ays, 80 89
suan20 na NA NA (ss0/aay) 20000 20000
Sub Total acer | 17679 | 234550
rorat zasan_|_s7670 | 2aasso
ess: cash avance, tan
|amount tobe reimbursed / Amount tobe returned) 238550
sueMirTeo 8 enonseo ey avoreo er -AppRovED By
nance BOFALLARIA, JR. WRGUENCANANO
PAYMENT RECEIVED BY:
General Manager / General Admin. Mag.Taare] asus LE] wae
= oppo [wd HO,
a
vig
awe 190
rt SO)
waned _ Noo AL
Ad ane Batond Say Uy aepvalno? Oe
aay day? 6 Nolasayy pas WW (awd) ade = 8 wer] peailvo
asodund TIS O1 SALLY ‘Tw9 JO ALw901
|3LvVG G371NG3HOS:
ed Nia) “6 cinesat]
aoee |b “> ‘ol
g3¥3A09 GOIMSd
5 Np wou!
ANS Vd3O/NOLLWOO WAY S3TVS|
aWYN|
ocr
AMVYANLL S.33A0Td NaInspection Report
CAFF Project
B:Jan-20
1. Sweep blasting of | Completed sweep blasting Before blasting After blasting
pipe internal of pipe internal Jan 8,
2020
2. rectification of tank On going, Tank 1
sealant
3, Internal painting of On going, After primer On going, After top coat
pipe (primer and top paint
coat) ETC: Jant3.} z.
4, Affected facility
after typhoon Ursula4.4 Canopy
vertically misaligned
Matson to provide
methodology on how to
retrofit all affected
canopies to be presented
onJan9
Bridger canopy with angle of
inclination of 5/140 = 2 deg
Refueller canopy with an angle of
inclination of 3/140 cm = 1.22 deg
Test Rig canopy with an angle of,
inclination of 8/140 cm = 3.27 degParking canopy with an angle of
inclination of 8.5/140 cm = 3.5,
deg
4.2. Detached Matson to restore
Security Office Fascia
Frame
4.3 Office building Matson to restore
broken main glass
door
5. Firepump area - On going full welding of
firepump suction and
discharge line
= on going installation of.
pipe supports6. Test rig area
7. Other Pictures
Full welding of flanges
and pipeline
Bridger canopy
Refueller canopy
Fix monitor
Surface preparation for
painting of bollard (trestle
barrier)HEMPEL Working area
Ex Bacong fire pump fuel
tank repair in progressBOARDING PASS
ECONOMY PRIORITY ACCESS
VILLARIN/JESOLITO MR rary: ELTE 371042641
Lounse
PR 2039 = um wanica
MPH CATICLAN
08UAN20 DonESS
TERMINAL
sea osa_/frenac———
GATES CLOSE 15 WINUTES BEFORE DEPARTURE
NAME OF PASSENGER
OL
capprer etic nave ( Tine [pet
Caticlan Boracay 22 2 Oguan 1245 /asc BSBTAF
ED
70 —
Manila
BAG TAGS:
sok: (ASA)
GATE CLOSES 30 MINUTES BEFORE DEPARTURE TIMEIn settlement of the following:
ling invoice No. Amount
ea Sasa
ro
25 Bis, (50:2) DTA 12508
eat Eri AUBIN
al he
REXS TO BAR
REX. VILLAR- PROP
Caticlan Malay, Akan
Non-VAT Reg. TIN: 306-089-916-001
OFFICIAL RECEIPT
Received From ARGH TECINIWOGR IN.Date: 01-04-20
S-E Hotel And Residence
TIN: OSCA/PWD ID No._
Address SoPwo
Signature
Business Sie
Qty. | Unit Anicles pai | Amount
Z
4
Meat
i eat
: = y
cto 1
om 1 ao
om HOG
ewe
No ~ 3870
m vaso Pres Aron Oz
MERA Eee Gaon eis
®D
e
1a vecaen ae
TL 278-5989
tingls2 “70
serial #
Case 20, 9
PH. 2960)
wan Sekt
Weenticceey
UTFRE 24 halve
1342
Teativber HaltCaticlan, Malay, Aklan
(036) 288-7392 /09084367450/09167604938
| Guest Name Folio No. Room No. Pax Room Type | No. of Nights
Al 1% | Stfplongo 1
aR ULAIN a Rae Arrival Departure | Invoice No,
1650-0 | VAN: og, 2olo uae F, 2026
Date Description ‘Total Balance
TAN OF n
IK. , 2020 - SPNOARO Room A ly 6D‘)
-9, % | |
Tageatiaeia ale Glemacs leno | cero poe
| i PAX)
Total \,473- 2)
Applicable Taxes 116-79
Net [65-00
Crea
Cashier's Signature Guest Signature