MINUTES OF THE MEETING

Location: SMC-HOC Basement Room 13

Date: May 17, 2018

Attendees: Petron: JV Nolla, SC Bayaban, JS Fameronag, LC Balbastro

ArchEn: LC Ramos

Oceaneering: MM Oliveros

Sta
Locatio Geotechnical Number of Mobili ETC
kin ETC Result Status/ Action Items
n Investigation Boreholes zation Drilling
g
3 x 150MB Jet A- Apr May
Bacong 8 (6 +2) May 29 June 11 Ongoing drilling (2)
1 12 16
Manda 4 x 25 MB White Apr May June 15/ For deployment of drilling equipment next week (1)
8 (4+4) June 29/ July 4
ue Fuel 14 23 June 21

1/3
9/24/2019 Yahoo Mail - [Minutes of the Meeting] Project Status Updates for Geotechnical Services

1x25MB Water 2 June 27 July 10


Tank
1x5MB LPG
2 May 29 June 11
Mounded
1x25MB ADO 2
Apr May 14 May 26
Davao 2x1207MT LPG May 2 Ongoing drilling (1)
4 16
Mounded May 26 June 7
May
Roxas 2x25MB Jet A-1 4 - June 5 June 19 For deployment of drilling equipment by next week (1)
23
Bredco,
2x1500 MT LPG Apr
Bacolo 4 June 1 June 13 June27 After Bacong drilling
Mounded 19
d
1x15MB R92 2
1x15MB Water Ma May
Rosario June 5 June 19 For deployment of drilling equipment by next week (1)
Tank w/ Deep 2 y 14 23
Well
Apr Mobilization on May 18 (1)
May
Poro 1x24MB ADO 2 il May 24 June 8
18
30 Endorsement memo on mobilization on May 18
2 x 1500MT LPG
4 (3+1)
Legane Mounded June
- July 8 July 22 After Mandaue drilling
s, Iloilo 1x5MB Water 29
2
Tank
Apr May
Bawing 3 x100 MB ADO 6 (4+2) June 16 June 30 After Davao drilling
21 28
Ma June
Iligan ADO tank 2 July 1 July 15 AfterTagoloan drilling
y5 25
2 x1500 MT LPG 2 May 29 June 11
Tagoloa Ma May
1 x 10 MB E98 2 Jun 5 June 19 First priority For deployment of drilling equipment by next week (1)
n y5 23
2x30Mb Asphalt 6 June 23 July 7
Total 45 (+19)

No. of Boreholes: Red font, additional boreholes for FCA

• PO issued last Apr 6 (45 boreholes, 10 locations), Mobilization date last Apr 13, Original ETC on June 2

• Oceaneering to provide progress report every Thursday to ArchEn and proponent

• Commitment letter and schedule for submission by Oceaneering on May 18

2/3
9/24/2019 Yahoo Mail - [Minutes of the Meeting] Project Status Updates for Geotechnical Services

• ArchEn to provide layout of Tagoloan borehole location on May 18 to Procurement

• Operations to provide SOW for Tagoloan geotech to Procurement within the day

This communication is confidential and may contain privileged information intended solely for the named addressee(s). It may not be used or disclosed except for the purpose for which it has been sent. If you are
not the intended recipient, you must not copy, distribute or take any action in reliance on it. Unless expressly stated, opinions in this message are those of the individual sender and not of Petron Corporation.
Furthermore, Petron Corporation accepts no liability or responsibility for any onward transmission or use of emails and attachments having left the Petron domain. This footnote also confirms that this email
message have been checked for content security threats and scanned for computer viruses.

MOM 051718.pdf
894.2kB

3/3

You might also like