construction stage, Land area, for proposed development are 1.0 ha, hence it is become
suitable in used of control purpose.
Settling zone
Base:
WB = Wtwl - 2(d/tan45) 11.85 m
say 12 m
LB = Ltwl - 2 (d/tan45) 25.094 m
say 18 m
Depth
Settling Zone, y1 0.85
Sediment Storage Zone, y2 0.6
Side Slope Z 1 (H) :1(V)
Total Depth 1.45
SAY 1
The equation 13.2 shall be used to derived the design rainfall intensities
Calculation Average rainfall intesity (mm/hr) for 10 year ARI and 68 minute duration
Rainfall depth (mm) for various duration (minutes) from equation 13.3,
ARI (yrs) 30.00 60 120.00 180 P15 =P30 - FD(P60 - P30)
2 48.09 62.0453 75.65 82.9806 = 85.07 mm
5 58.10 76.2662 92.81 101.4244
10 64.56 85.0749 105.40 116.6321 Therefore ,
20 71.07 93.642 116.50 129.4435 I15 = 102.09 mm/hr
50 79.54 105.285 130.98 145.3933
100 88.46 116.382 145.51 162.2951 C = 0.65
Q10 C.I.A/360
= 0.184 cu.m/s
Losses
Orifice Discharge coefficient,Cd 0.62
entrance loss Factor,Ke 1.6015
Darcy-Weisbach fiction loss coefficient,f 0.02
Fiction Loss Factor.Kf 0.0471
Outlet loss factor, Ko 0.5
Bend Loss Factor,Kb 0
Frequency of Maintenance
Calculation of sediment loads
Example calculation
Weighted average annual runoff coefficient,Cv 0.4
Event Mean Concentration,EMC 4000
Average 6 month Rainfall depth 1841
Conclusion
The total sediment volume for Max. 6 month Rainthfall Depth arcordig to data provided from
JPS website (http :\\infobanjir.moa.my) are 82.48 m3 and it is less than quater of storage volume
of proposed sediment basin 1247 m3. Hence, it is safe to assumen that 6 month
maintenance are adequate to maintain the efficiency of the proposed wet sediment basin.
years
4. FREQUENCY OF MAINTENANCE
FINAL DISCHARGE
= 53.83 mm
V = 1 x R 2/3 x S 1/2
n