Professional Documents
Culture Documents
3 Steel
Steel 2059.314 140 kG/m3 288.304 MT
4 Pile Cap
Abutment A1 1 31.5 8.44 1.5 398.79
Pier P1 -1 1 10.5 8.44 1.5 132.93
Pier P1 -2 1 10.5 8.44 1.5 132.93
Pier P2 -1 1 10.5 8.44 1.5 132.93
Pier P2 -2 1 10.5 8.44 1.5 132.93
Abutment A2 1 31.5 8.44 1.5 398.79 1329.3
6 Intermediate Plug
Abutment A1 2 55.41769 0.4 44.33
Pier P1 -1 1 19.63495 0.4 7.85
Pier P1 -2 1 19.63495 0.4 7.85
Pier P2 -1 1 19.63495 0.4 7.85
Pier P2 -2 1 19.63495 0.4 7.85
Abutment A2 2 55.41769 0.4 44.33 120.06
7 Intermediate Plug
Steel 120.06 50 kG/m3 6.003 MT
9 Well Excavation
Abutment A1 2 113.0973 23 5202.48
Pier P1 -1 1 50.26548 23 1156.11
Pier P1 -2 1 50.26548 23 1156.11
Pier P2 -1 1 50.26548 23 1156.11
Pier P2 -2 1 50.26548 23 1156.11
Abutment A2 2 113.0973 23 5202.48 15029.4
104540942 10.45
22.73977
11.93977
11.36988
7.369885
57.67964
136
20
0.147059 385.5882
3 180 540
7 283 1981
5 394 1970
5 541 2705
3 777 2331
23 9527
Avg Rate 414.2174