You are on page 1of 3

RCC Double Cell Box Culvert/VUP

Components W/L H L/W Nos. Qty. Unit GOC


Bottom Slab 11 0.7 3 1 23.100 m 3
M35
Wall 0.6 3.9 3 3 21.060 m3 M25
Haunch 0.3 0.3 3 6 0.810 m3 M35
Top Slab 11 0.7 3 1 23.100 m3 M35
Approach Slab 3.5 0.3 3 2 6.300 m 3
M35
PCC 12 0.15 3.2 1 9.000 m3 M15
Wing Wall1 19.238 m 3
M25
Wing Wall2 22.275 m3 M25
PCC 41 0.15 2 12.300 m 3
M15
Crash Barrier 52 0.256 13.312 m3 M35
Excavation 200.400 m 3

GSB 34 0.2 3 1 20.400 m3


WMM 34 0.2 3 1 20.400 m3
BM 34 0.065 3 1 6.630 m3
Wearing Coat BC= 50 mm Grade-I 9.375 m3
Filter Media 123.750 m2
Filling 322.875 m3
Weep Hole 126 nos.
Epoxy Coal Tar 240.5 m2

Drainage Spout 4 nos.

Rain water 30 Rmt.


Downtake line

HYSD TMT Steel (MT)


Steel Fe 415
Bottom Slab 4.533
Wall 3.306
Haunch 0.127
Top Slab 4.533
Approach Slab 0.989
Wing Wall1 3.020
Wing Wall2 3.497
Crash Barrier 2.090
22.097 MT