Excavation Lean Concrete Local Soil Filling PCC Floor

m3 m3 m3 m3 m3
Management Dining Hall 27 4 15 17 13
Non-Management Dining Hall 35 5 20 32 26
Recreation Room Management 27 4 15 17 13
Recreation Room Non-Management 35 5 20 32 26
Gym 53 7 30 33 26
Workshop 51 6 28 55 44
Mosque 35 5 20 32 26

Total 263 36 148 218 174


m3 m3 m3 m3 m3
Concrete Screed Tiles Steel Bitumen
m3 m2 Tons m2
2 75 1.8 48
4 140 2.4 65
2 75 1.8 48
4 140 2.4 65
4 149 3.5 96
6 237 3.32 92
4 140 2.4 65

26 956 17.62 479


m3 m2 Tons m2
Foundation Size
A B Qty Column Size

25908 9144 1 L L
1000 500
B B
1000 500
H H Above FGL
400 H Below FGL

Excavation 50.38725 m3
Lean 6.04647 m3 Bar Dia
Concrete 28.0416 m3 Foundation
Local Soil Filling 54.90669 m3 T/B #4
PCC Floor 43.92535 m3 T/B #4
Concrete Screed 5.922569 m3
Tiles 236.9028 m2 Column
Both Faces #4
Ties #3

Bitumen 91435200
91.4352
Depth from FGL to Bottom of Local
Column Size Perimeter Foundation PCC Floor Earthfill Screed

L 70104 625 200 250 25


500
B
500
450
150

STEEL
Unit Weight Length No Spacing Qty Total Weight

0.994 70104 6 200 2 836.200512 kg


0.994 1450 351 175 2 1011.7926 Kg

0.994 1800 352 200 2 1259.5968 kg


0.56 74104 5 150 1 207.4912 Kg
836.2005 Kg
1011.793 Kg

1259.597 Kg
207.4912 Kg

3315.081
3.315081 tons
Typ Section A-A Typ Section B-B
219 297
Compacted Earth 2.58135 565.3157 m3 2.2905
Sub Base Layer 1.3634 770.7514 m3 1.1682
Road Base Coarse 0.4 87.6 m3 0.3
Pavers 394.2 m2 534.6
Asphalt Wearing Coarse 876 m2 891
Excavation 934.4511 m3 1109.963

Compacted Earth 2093.202 m2


Sub Base 1544.169 m2
Road Base Coarse 876 m2
Pavers 394.2 m2
Asphalt Wearing Coarse 876 m2
Excavation 934.4511 m3

394.2 534.6
Compacted Earth Under Pavers 928.8

ROAD BARRIER

Excavation 0.8125 m3
Leean 1:3:6 0.096 0.48 m3
Lean 0.0125 m3
Steel Structure C Length 1265 13.4 5 84.755 kg
Bitumen 4.8 m2
Typ Section B-B
297 516
680.2785 m3 1245.594 m3
346.9554 m3 1117.707 m3
89.1 m3 176.7 m3
m2 928.8 m2
m2 1767 m2
m3 2044.414 m3

2552.715 4645.917
1804.275 3348.444
891 1767
534.6 928.8
891 1767
1109.963 2044.414

ROAD BARRIER
Excavation 48.384 m3
Lean 3.2435 m3
Concrete

Foundations 4.41525 m3
Column
C1 2.84418 m3

PB 3.8117508 m3
Roof Beam
RB-1,2,3 5.4605508 m3
Parapet Wall 2.14296 m3

Slab 11.62155615 m3
31.29624775 m3
Block Masonry 155.747041 m2
Internal Plaster 101.1132 178.590241 m2
External Plaster 141.3926 m2
Situ (1:3:6) 2.5882295 m3
DPC 0.3176459 m3

Bitumen 24.8022
Columns
C1 5.2962 m2

2.1318736 Foundations
F1 19.506 m2
Windows (STEEL LOUVER WINDOW.)
W1 (1800x1200) 4 Nos
Ventilators (STEEL LOUVER VENTILATOR.)
V1 (1200x600) 6 Nos
Door (DOUBLE LEAF STEEL LOUVER DOOR)
D1 (3000x3000) 1 Nos
Compacted Earth Fill 8.1 m3
Stone Soiling 8.1 m3
UPVC Pipe 4 RM
Polythene Sheet 54 m2
Screed 50mm 2.7 m3
Gravel and Cobble 15.6645 m3
Screed 100mm 50.617441 m3
Roofing Pumping Skid and Filter Skid C
50mm scree 73.94544
2 Excavation 2.808
Lean 0.36
concrete 0.96
steel embedded parts 1.580247
Epoxy Grout 0.01035
Cementetious 2.56

Steel 0.994 2500 18


0.994 2400 24
0.994 2400 13

0.994 2200 18
0.994 2400 24
0.994 2400 13

Total

Structural fill layer 1.872


road base layer 1.872
gravel and cobble fill
7.5
18.9
Reinforcement Working

Unit Weight
Foundations (kg/m) Length Nos Qty
F1 0.994 1970 22 6 258.4798 kg

Columns
C1 0.994 6000 8 6 286.272 kg
Ties 0.56 1120 31 6 116.6592 kg

PB 0.994 37516 4 1 149.1636 kg


0.56 1650 177 1 163.548 kg
RB-1 0.994 51716 8 1 411.2456 kg
0.56 1600 320 1 286.72 kg

Slab 0.56 24829 39 1 542.2654 kg


0.56 21829 54 1 660.109 kg
0.56 2076.33 29 2 67.4392 kg
Parapet Wall
0.56 35716 2 1 40.00192 kg
0.56 1500 180 1 151.2 kg
3133.104 kg 3.133104

Pumping Skid and Filter Skid Calculations

m3
m3
m3
7.022716 kg 0.002588
m3 0.01035
m2

44.73 kg
57.2544 kg
31.0128 kg
2.4
39.3624 kg
57.2544 kg
31.0128 kg

260.6268 kg

m3
m3
0
toonne
Excavation 4.3953 m3
Lean 0.5175 m3
Concrete 3.4704 m3
Bitumen 6.744 m2
Cobble fill 1.38 m3
hot asphalt mix 6 m2
Steel
0.994 7000 24 166.992 kg
0.994 2974 80 236.4925 kg
0.994 7000 8 55.664 kg
0.994 3700 80 294.224 kg
753.3725