This document is the property of UEPL and Contractor name (If applicable). It is not to be copied nor shown to a third party without prior consent.
DOCUMENT CONTROL
Revision record
(EST-ALL-200-IN-SPC-00001-00)
(EST-ALL-200-IN-SPC-00053-00)
2
Table of Content
3
1.0 INTRODUCTION
UEP is primarily engaged in the upstream Oil & Gas business, including
exploration, development and production of crude oil and natural gas. UEP
process facility comprises three major blocks but entire operation expands in an
area of several districts in province Sindh.
This specification covers the site environmental data of MKK, Badin, Kotri North
(KN) and MIM (Kadanwari/ Sawan / Mehar, except Mitto) and all other associated
remote facilities. Furthermore, it also illustrates the available utilities data of main
oil & gas processing facilities in these concessions.
This data is to be used for all modifications and installations within existing
facilities and establishment of new wellheads and small remote facilities.
However, for installation of new major facilities, within existing concessions, this
data needs to be re-validated for specific site conditions.
4
2.0 SITE & ENVIRONMENTAL DESIGN DATA
2.1 TEMPERATURE
MIM
MKK/ Badin Kadanwari Sawan Mehar
KN
Maximum Dry Bulb Shade Temperature, (°F) 122 122 124 124 131
Minimum Dry Bulb Shade Temperature, (°F) 40 40 25 25 33
Maximum Wet Bulb Temperature (°F) 93 93 83 90 86
Maximum Design Wet Bulb Temperature (°F) 93
Maximum Design Dry Bulb Temperature (°F) 122
2.2 HUMIDITY
MIM
MKK/ Badin Kadanwari Sawan Mehar
KN
Relative humidity (monthly normal) (%) 25-80 25-80 16-84 20-80 20-90
MIM
MKK/ Badin Kadanwari Sawan Mehar
KN
Maximum monthly normal pressure, (psia) 14.866 14.866 14.689 14.689 14.689
Minimum monthly normal pressure, (psia) 14.358 14.358 14.336 14.336 14.336
5
2.4 RAINFALL
MIM
MKK/ Badin Kadanwari Sawan Mehar
KN
Maximum recorded in 24 hours (mm) 250 250 124 257 140
MIM
MKK/ KN Badin Kadanwari Sawan Mehar
Maximum wind velocity 80 80 100 90 115
(mph)
Design wind velocity, 100 100 120 100 120
(mph)
Prevailing Wind North-east North- South South South
Direction east (Summer) (Summer) (Summer)
6
2.6 SIESMIC AND GEOTECHNICAL SITE CONDITIONS
MIM
MKK / KN Badin Kadanwari Sawan Mehar
Site
Elevation, ft
100 100 200 262 177
above sea
level
-Khaskheli=
65KPa @ 5ft
-Naimat = depth 83 KPa @ 3ft 140 KPa @ 100 KPa @
Soil Bearing 50KPa -Khadi-II= depth 3ft depth 3ft depth
Capacity -Kausar = 65KPa @ 6ft
(Note1) 37KPa depth
-Bari-I =
35KPa @ 6ft
depth
Notes
1. These soil bearing capacities are specific for current site/ plant locations and shall be used carefully
for small scale modifications within existing plant areas; for new site location or for major projects site,
specific soil investigation report shall be obtained in order to establish the soil bearing capacities.
2. Soil Investigation is mandatory for civil design of all types of civil structures and Equipment including
but not limited to: All type of Buildings, Tall vessel foundations, Dynamic equipment foundations,
Electrical towers/poles, Roads, Bridges, Water retaining structures, Culverts, All type of Boundary
walls, Retaining walls, Windmills, Blast proof buildings etc.
7
3.0 UTILITY INFORMATON
MIM
MKK/ Badin Kadanwari Sawan Mehar
KN
Supply Header Operating Pressure, 70~100 70~100 80~420 116~174 70-100
(psig)
Supply Header Operating 80-150 80-150 46~70 86~205 80-150
Temperature, (°F)
MIM
MKK/ Badin Kadanwari Sawan Mehar
KN
Instrument Air Normal Operating 75~120 75~120 75~120 75~120 75~120
Pressure (psig)
Dew Point (°F) -40 -40 -4 (Note 1) -4 (Note 1) -40
Notes:
1. Existing Dew Point is based on Class 3 (-4 F); however, for future design case Class 2 i.e. -40 F shall
be utilized.
MIM
MKK Badin Kadanwari Sawan Mehar
Plant Air Normal Operating Pressure, 75~120 (Note 1) 75~120 75~120 75~120
(psig)
Notes:
1. Plant Air provision usually not provided at Badin plant sites
8
3.4 ELECTRICAL POWER
MIM
MKK/ KN Badin Kadanwari Sawan Mehar
Power Generation / Main 480 VAC, 480 VAC, 415 VAC, 415VAC, 415 VAC,
Distribution 3 Phase, 3 Phase, 3 Phase, 3 Phase, 3 Phase,
60 Hz 60 Hz 50 Hz 50 Hz 50 Hz
Lighting / Sub Distribution 240 VAC, 240 VAC, 240 VAC, 240VAC, 240 VAC,
1 Phase, 1 Phase, 1 Phase 1 Phase 1 Phase
60 Hz 60 Hz 50 Hz
Instrumentation 24 VDC 24 VDC 24 VDC & 24 VDC 24 VDC
110 VDC