1 INTRODUCTION ........................................................................................................ 1
2 OBSERVATIONS ...................................................................................................... 2
The comparison is done to check the affirmation of layout of equipment to the Plot Plan, as it
is necessary to first freeze or fix the plot plan as in order to continue further working. Locations
of equipment must be as per layout otherwise there will be future challenges in piping
construction. Errors observed in comparison are mention as follows in accordance with
equipment.
1.) CHEMICAL INJECTION PACKAGE CPF BADRA FOUNDATION PLAN DRAWING (U-
24001 TO U-24005):
• There is an error of 5 mm in shorter dimension of foundation in plot plan.
• The coordinates vary by 11 mm in east direction and 4 mm in north direction.
• The difference in coordinates of points shown in measurement survey and
plot plan have difference of 509.5 mm max in east and 153.3 max in north
also there is difference in TOC (Top of Concrete) mentioned in detail drawings
and TOC mentioned in measurement survey of 302 mm.
6.) MARKING SCHEME & PIPW SLEEPER DETAIL DRAWING FOR PWT AREA:
• Dimensions of pipe sleeper represent correctly in plot plan but coordinate of
pipe sleeper local coordinate varies which is represented in Annexure-I.
• Pipe sleepers foundation have their coordinate varies from 75.6 mm to 1621.0
mm in east and 7.6 mm to 1686.5 in north.
Detailed comparison of Detail Drawings and Plot plan is shown in Annexure-I. Detailed
comparison of coordinates and elevations of points marked in Measurement survey drawing
and Plot plan is attached as Annexure-II.
ANNEXURE - I
ANNEXURE – II
ANNEXURE – III
ANNEXURE – IV