The document is a schedule for concrete needs that lists 21 concrete work items with details on volume, progress, remaining volume, and planned pouring quantities for September through November 2022. It shows a total monthly concrete need of 11,253.63 cubic meters for non-rigid and 652.65 cubic meters for rigid concrete works. The schedule also provides notes on the daily pouring times for non-rigid and rigid concrete.
The document is a schedule for concrete needs that lists 21 concrete work items with details on volume, progress, remaining volume, and planned pouring quantities for September through November 2022. It shows a total monthly concrete need of 11,253.63 cubic meters for non-rigid and 652.65 cubic meters for rigid concrete works. The schedule also provides notes on the daily pouring times for non-rigid and rigid concrete.
The document is a schedule for concrete needs that lists 21 concrete work items with details on volume, progress, remaining volume, and planned pouring quantities for September through November 2022. It shows a total monthly concrete need of 11,253.63 cubic meters for non-rigid and 652.65 cubic meters for rigid concrete works. The schedule also provides notes on the daily pouring times for non-rigid and rigid concrete.
Keterangan: 1. Jadwal Pengecoran Non-Rigid dilaksanakan setiap hari dari pukul 08.00 - 16.00 WIB 2. Jadwal Pengecoran Rigid dilaksanakan setiap hari dari pukul 16.00 WIB - Selesai
A Guide to Motor Boat Design and Construction - A Collection of Historical Articles Containing Information on the Methods and Equipment of the Boat Builder