You are on page 1of 4

ABDUL QADIR KHAN

Contact info:

8871500593
7987076582
Email:

Personal Data:
Date of Birth : 05/04/1991
Sex : Male
Nationality : Indian CAREER OBJECTIVE
Marital Status : Married
Aspire seeking a challenging job to sharpen my skills through hands on experience
Permanent Address: in your company and work for the growth of the company.

230/41,Qadri Astana
Pardeshipura Khandwa
M.P.
ACADEMIC RECORD
Languages Known:
Year of
❑ Hindi Course Board / University Passin Percentage
❑ English g
❑ Urdu
B.Tech All Saints college of technology
(Mechanical Bhopal , Rajiv Ghandhi
2014 7.19 (CGPA)
Engineering) Proudyogiki
vishavidyalaya
St Paul H.S. School
Higher Khandwa , Board Of
2009 57.80
Secondary Secondary Education Bhopal
Hobbies: Madhya Pradesh
St Paul H.S. School
❑ Travelling Khandwa , Board Of
Matriculation 2007 69.0
❑ Playing Cricket Secondary Education Bhopal
❑ Collecting Photos Madhya Pradesh

Sensitivity : This Document is Classified as "LNT Internal Use".


WORK EXPERIENCE: 4 YEARS 1 MONTHS

PRESENT COMPANY WORKING STATUS

Designate as a Mechanical Engineer in ENERSA ENGINEERING AND SERVICES under L&T


POWER (NTPC CLIENT), from Feb 2019 to till date, having good experience in thermal power plant with exposure
in TG and BOP.

NATURE OF WORK

Presently engaged as TG & BOP Field Engineer & AUX Boiler (93 TPH) Desk Engineer at
KSTPP (Khargone Project), 2x660MW, Khargone, Madhya Pradesh, Carrying out Operation, Testing,
Commissioning and Maintenance activities.

ROLES AND RESPONSIBILITIES


Experience in various TG/BOP equipment & machines commissioning, tracking project progress
and taking steps for overcoming any risks and worked as a lead person in following activities of
(2x660MW) unit commissioning.

➢ TG Commissioning
• Condensate & Feed Water Path Commissioning
• MOT Lube Oil & JOP Commissioning
• Equipment Cooling System Commissioning
• CEP Commissioning
• Generator Seal Oil Commissioning
• Stator Coil Cooling Water Commissioning
➢ BOP Commissioning
• DM & PT Plant commissioning
• Raw Water Pump House Commissioning
• Fire Hydrant & Spray System (FWPH) Commissioning
• Compressor House Commissioning
• AUX Boiler Commissioning
• CW Pump House Commissioning
• CWT & CHLORINATION Plant Commissioning
• IDCT commissioning
• FOPH Commissioning
• MRHS Commissioning
• HVAC System Commissioning
• ETP Plant Commissioning

Sensitivity : This Document is Classified as "LNT Internal Use".


KEY RESPONSIBILITIES

❑ As a commissioning engineer responsible for all commissioning activities with the commission
schedule.
❑ Ensure the equipment during safety operation.
❑ Responsible for (Desk/Field) of AUX Boiler & BOP Operation.
❑ Taking Vibration Protocol of Rotary Equipment.
❑ Drafting Commissioning Procedure for BOP area.
❑ Fire Protection and Detection System construction monitoring for ST Charging.
❑ Regular Inspection and Maintenance of all Rotary Equipments like Centrifugal Pumps, Screw
Pumps, Compressors, IDCT Fans, etc.
❑ Prepare Water Flushing for Water Pipe Lines and Card Board Blasting For Oil Pipe Lines during
Commissioning.
❑ Performing the functions of trouble shooting and safe working environment.

Regular monitoring of utility’s like Drum level, Deaerator, BFP, Hydrant & Spray, LDO, Clarifier Systems,
RGSF etc.

PREVIOUS COMPANY WORKING STATUS


COMPANY : M/S ENERGO CONSTRUCTION LTD.ENERGO
(Bulk Material Handling, Ash Handling, Valves & Boiler Performance Testing,
Coal Handling Plant)
DESIGNATION: Mechanical Maintenance Eng.
CLIENT : MPPGCL

DURATION : Jan-2015 to June-2018

ROLES AND RESPONSIBILITIES

➢ Maintenance of conveyors system& equipment used for the


uploading, stacking& bunkering of coal at the speed of 1750 TPH.
➢ Preventive and brake-down maintenance of wagon Tripler
along with side arm charges, apron feeder (2nos), paddle feeders (4nos) etc.
➢ Regular inspection, preventive & brake-down maintenance of
crushers-4nos, vibrating feeders-4nos & Rotary breakers-4nos etc.
➢ Preventive maintenance and lubricating of all types of drives and
pulleys.
➢ Regularly inspection of bunker shells & gives feedback to control
room for requirement of coal.
➢ Inspection the nature of belts on daily basis while running.
➢ Belt joint (hot &cold) as per operational requirement.

Sensitivity : This Document is Classified as "LNT Internal Use".


AREAS OF INTEREST

❑ Erection And Commissioning


❑ Operation And Maintenance
❑ Research and Development

PROJECT DETAILS (B.E)

PROJECT NAME: MajorProject


ROLE: Team Leader
TEAM SIZE: 6
PROJECT DURATION: 15 Days
ProjectDETAIL:BIO DIESEL ENGINE

PROJECT NAME: Minor Training


ROLE: Working on Diesel Engine
PROJECT DURATION: 15 Days
PROJECT DETAIL:Diesel Loco Shed Itarsi Diesel Training Centre,Itarsi

PROJECT NAME: Major Training


ROLE: Maintenance of Diesel Engine
PROJECT DURATION: 15 Days
PROJECT DETAIL:Diesel Loco Shed Itarsi Diesel Training Centre,Itarsi

DECLARATION

I hereby declare that all the information mentioned above is true to the best of my knowledge

Place: KHARGONE, MP.

Date: / / ABDUL QADIR KHAN

Sensitivity : This Document is Classified as "LNT Internal Use".

You might also like