You are on page 1of 3

RESUME

Devendra Kumar Singh.


At&Po- A27 Mangal Jyot society Sharvan Chaukadi, Bharuch
Dist. - Bharuch-392012
Gujrat, INDIA
Mob:+917079497764/+918002918811
Email: singhdevendrasingh7079@gmail.com

Respected Sir/madam
○ I understand that working for your organization requires a candidate
who is team oriented and is able to deal with people in various departments. I
am confident that I possess these skills , which will help me to perform the job
efficiently and effectively .

CARRIER OBJECTIVE
To build career in progressive organization which provide me with a good opportunity to grow
personally and professionally.

EDUCATION
EXAMINATION YEAR COLLEGE/SCHOOl UNIVERSITY/BOARD PERCENTAGE
DIPLOMA 2019to 2021 Vedica institute of RKDF 69%
mechanical technology
engineering
Mechanical 2016 to2017 Bharat technical Ncvt 84%
Fitter institute
Class-12th May,2018 R.k inter College U.P Board 64%
Science Gazipur.(UP)
Class- 10th May,2016 R.k inter college U.P Board 67%
Gazipur(up)
Experience:
​ Mechanical fitter at Deepak Phenolic ltd Dahej on contract From August 2018 to
February 2018

​ ETP field opretor.at Deepak Phenolic LTD Dahej on payroll. From-26 feb 2019 to 28
march 2021

​ Till in Tatva Chintan Pharma Chem Ltd Ankleshwar as an Utility .MEE/ ETP
JR.Officer

from March 2021 to till date

JOB PROFILE
1. Multi effective evaporator(MEE) plant operations.maintain feed flow rate maintain
vacuum Pressure in vepour column and condenser.maintain steam pressure and
temperature for striper coloum .give Blowdown concentration liquid for land feeling
maintain daily log sheet report.maintain Distill water flow rate.and recycle for plant
operations.
2. Etp plant operations primary secondary and turtory treatment coagulation
flocculation,aeration system maintain mlss mlvss DO temperature CNP ratio f/m ratio
PH cod bod,tds sv30 toc maintain I/L influent quality maintainO/L Effluent parameters
as per Cpcb norms. by multigrade(F), carbon filter, ultrafiltration, reverse osmosis.
3. Breakdowns reporting to ETP In charge.
4. Daily report to shift In charge at the end of shift
5. PH correction of inlet effluent by HCL.
6. RO operation as per SOP.
7. Housekeeping Maintaining to ETP, Ro, STP Area.
8. Work format fill up to all maintenance work.
9. Press Filter operates to as per procedure.
10. Short CIP and Long CIP as per plant need to RO and ETP.
11. Preventive Maintenance of all pumps as per engineering schedule.
12. To perform other activities assign by HOD.
13. Segregation and storage of chemical and ETP hazardous sludge

14. Coordinating with service and process dept. For smooth & continues process .
Monitoring & filling of Daily Checklist/ Reports. Carryout of preventive maintenance
of equipment & documentation of the same as per defined schedule / SOP. Predict
the abnormality and attend breakdown in timely manner. Make sure optimal
utilisation of resources with factory safety norms, PPE s compliance and inventory
management through physical stock verification.
15. .Documentation Work analysis , equipment log sheet Report.Boiler,Brine Chiller,R 134
Chiller,air Compressor,pump and blower agitator,Air dryer system, Nitrogen plant,DM
plant, cooling tower ,Etp plant,water system.Ro-,log sheet report UF-Daily report.
Plant equepment breakdown and preventive maintenance.cordinetion with
mechanical, electrical, instrument.
16. Safe chemical handling and storage as per material shafty data sheet.
17. Knowledge of permit to work-(Hot work, cold work, height work, confined space.
18. Demineralized water plant smoothly operation. Regeneration process of
resin.maintain water quality for process and Boiler.
19. Cooling tower operation maintain water quality.Delta T and chemical dosing schedule
monitoring fans and pump smoothly opretion, follow changeover schedule of
equipment, maintain Daily log sheet and calculetion each every parameters
20. Brine Chiller, and R134A Refrigeration plant operation. monitoring.compressure,
condenser, evopretor
Oil level pressure and temperature refrigerant parameters for smoothly operation
maintain Daily log sheet and resolve plant troubleshooting.with mechanical
department
21. Air dryer system operation maintain Dew point monitoring valve operation And
maintain cooling cycle and heating cycle.maint water flow rate for moisture Cary out
from pot.
22. Nitrogen pressure swing absorption plant operation maintain nitrogen purity and
continues flow for process requirement. monitoring valve opretion cycle , filter
pressure, maintain level of surge tank.moisture drain as per schedule,
troubleshooting resolve with instruments department.
23. Softener plant operation maintain water quality for boiler feed water, checked
hardness as per schedule.and Regeneration process
24. Boiler opretion maintain water quality , chemical dosing schedule, maintain record
log sheet maintain air and fuel ratio by burner Blowdown every shift. monitoring
mobry alarm. Water gauge glass.and Steam pressure feed pump changeover
schedule. Follow all norm as per IBR norm, maintain logsheet fuel consumption,water
consumption,stock temperature.
PERSONAL INFORMATION
⮚ Name : Devendra Kumar Singh
⮚ Date of Birth : 07/08/2000
⮚ Address : At & Post- A27 mangal jyot society.sharvan chaukadi, Ta- vagra
Bharuch(392012), Dist- bharuch
⮚ Contact : +917079497764
⮚ Strength : Positive, self-Discipline, Hardworking, Good manpower Handling
⮚ Hobbies : Cricket, Travelling, Music.
⮚ Language : English, Hindi, Gujarati.
⮚ Weakness : Emotionall

You might also like