WORKING EXPERIENCE
Around 5+ years Oil and Gas Field PRODUCTION AND FIELD OPERATOR
(Projects, Installation, Erection, pre-commissioning, Commissioning, Production, Maintenance
Fields)
SUMMARY OF EXPERIENCE
FIELD EXPERIENCE:
Commissioning / Pre commissioning
Process Operation
Production Operation
Wellhead Operation
Control room Operation
Gas injection, gas storage, refrigeration
Water injection
Tank form Operation
Compressor & Pump Stations (Gas &Oil )
Utility Operation.
The sweet and dehydrated gas is feeding the dew pilot depression unit in order to avoid
condensation in the pipeline, so the heavy hydrocarbons need to be removed. It consists of two
sections. Chill down section and Propane refrigeration section, Operation of the heat
exchangers, Gas Chillers, Filter separators, Condensate transfer pumps, Propane compressors,
knock out drums and Propane accumulators.
Condensate Fractionation Unit
This is the gas expending process, Feed gas supply, Feed gas cooling and drying, Feed
gas chill down and separation, Lean gas compression and dispatch, Dryer regeneration, LPG
Column, Refrigeration system, Fuel gas system, Control all of the dryers, Filters, Heat
exchangers, Control and operation LPG column reflux pump, LPG dispatch pumps, Expender
and Compressor.
Acid gas is coming from the sweetening until to recover the Sulphur. Familiar with
control of maintain the incinerator, knock out drums, oxidizer, and absorber, adding catalytic
reagents and liquid Sulphur is transferred to Sulphur storage tank by transfer pumps.
Start up knowledge of water lift pumps (Ingersol- Dresser 450m3/h), electro chlorination
package units, chemical injections like biocide 1 & 2, Antiscale, Antiform, and CL 2 scavenger,
coarse filter, sand filters (220m3/h), back washing sequence of the filters, blowers, deaerator
(stripping gas method and vacuum method), O2 scavenger injection, Vacuum pumps, Boost
pumps and turbo pumps driven by EGT Turbines (530m3/h) starting and stopping from the
PLC & DCS panels, PCV & FCV (Mini flow) controlling, export line pressure monitoring and
water Export line Pigging Operations.
UTILITIES
Well experienced in utility operation such as Gas Turbine Generator, Utility &
Instrument Air Compressor, Centrifugal Pump Piston Pumps, Water Treatment Plant, Produced
Water Treatment Plant, Raw Water Treatment, sewage water and effluent treatment, cooling
tower, chemical injection. And fire water pumps.
Knowledge of fire and safety system, deluge valve, sprinkler system, Monitors, fusible
loop shutdown, smoke detectors, gas detectors, Hydrants, Experience in the operation of
fire extinguishers like foam, DCP(25kg), CO2(10kg)and familiar with breathing
apparatus, fire and gas sirens, abandon alarms, life boat life raft, scramble net, swing
ropes, lifebuoy, desalted water sprayer, eye washer, etc
DECLARATION:
I am confident of my ability to work in a team .I hereby declare that the information
furnished above is true to the best of my knowledge.
Thanking you