(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Particulars Land Area Details Land Area Details for Total land
for PVC Plant (A) Calcium Carbide Plant (B) (A+B)
Existing land area 3.83 Hact. 8.83 Hect. 12.66 Hect.
Additional land area
No addition No addition No addition
for expansion
Total land area after
3.83 Hect. 8.83Hect. 12.66 Hect.
expansion
Consent to establish for PVC plant was granted by RSPCB vide letter no. F.12(21-255)
RPCB/Gr.1/3692,dated 28.10.2004 and a valid Consent to Operate (CTO) has also been
obtained from RSPCB vide their letter no. F(Tech)/Kota(Ladpura)/3(1)/2008-
2009/2551-2553, dated 28.06.2017, copy of same is enclosed herewith as Annexure – 2.
Consent to establish for Calcium Carbide Plant was granted by RSPCB vide letter no.
F.12(21-50) RPCB/Gr.1/3188,dated 10.09.2004 and a valid Consent to Operate (CTO)
has also been obtained from RSPCB vide their letter no.
F(SCMG)/Kota(Ladpura)/2613(1)/2017-2018/2634-2636, dated 29.06.2017, copy of
same is enclosed herewith as Annexure – 3.
Now, M/s. Shriram Vinyl & Chemical Industries has planned to enhance capacity of PVC
Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant (Acetylene from
90 TPD to 110 TPD) through modernization within existing project premises at DCM
Shriram, Kota Complex, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan).
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 22
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Table - 1
Nature, Size, Location of the Project and Environmental Setting Deatils
S.
PARTICULARS DETAILS
NO.
A. Nature of the Project Expansion {enhancement capacity of PVC Plant (PVC Resin from 200
TPD to 250 TPD) and Calcium Carbide Plant (Acetylene from 90 TPD
to 110 TPD)} through modernization within existing project
premises)
B. Size of the Project Proposed Capacity: Proposed Capacity Enhancement of PVC Plant
(PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD).
Plant Area: Total Land area of the project consists of 791 Acre
(320.106 ha.) area of DCM Shriram Kota Complex out of which ~
9.48 Acre (3.83 Ha.) for PVC plant & ~ 21.84 Acre (8.83 Ha.) for
Calcium Carbide Plant. Land area details for PVC & Calcium Carbide
Plant.
C. Category of the As per EIA Notification dated 14th Sept., 2006 & as amended from
Project time to time; this project falls under Category “B”; Project Activity ‘5
(e)’ petrochemical based processing (processes other than cracking
& reformation and not covered under the complexes).
D. Location Details: DCM Shriram Complex-Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota
(Rajasthan)
Khasra No’s 122 - 129 of Village Anandpura, 319, 322 - 324 of Village
Khasra No’s / Village Raipura, 1 - 4, 9 - 20, 264, 268 - 269 of Village Umedganj & 289 - 295,
297 of Village Kansua.
Tehsil Ladpura
District Kota
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 23
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
S.
PARTICULARS DETAILS
NO.
State Rajasthan
Latitude & Longitude Latitude: 25° 8'25.50"N and Longitude 75°53'8.82"E
Toposheet No. 45O12, 45O15, 45O16, 45O13 & 54C/4
E. Environmental Setting Details (with approximate aerial distance and direction from the plant
site)
1. Nearest Town DCM Shriram Complex located within municipal premises Kota City.
District Headquarter Kota is located @ distance of approx. 3.5 km.
6. Reserved Forests
(RF) / Protected RF (~ 2.0 km in South direction)
Forests (PF)etc. PF (~ 14.0 km in SSE direction)
within 10 km radius
9. Soil Type Clayey loam to clay, generally non calcareous, colour varies from
brown to dark brown.
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 24
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Table - 2
Salient Features of the Project
Sr. Particulars PVC Plant (A) Calcium Carbide Plant Total (A+B)
No. (B)
1 Product PVC Resin Calcium Carbide Products: PVC Resin, Acetylene, Calcium Carbide
2 Land Area Details
Existing land area 3.83 Hect. 8.83 Hect. 12.66 Hect.
Additional land area
No addition No addition No addition
for expansion
Total land area after
3.83 Hect. 8.83 Hect. 12.66 Hect.
expansion
3 Capacity Details
Existing Capacity 330 PVC Resin 200 TPD, Acetylene 90 TPD & calcium Carbide 330 TPD
200 TPD 90 TPD
TPD
Additional Capacity No PVC Resin 50 TPD & Acetylene 20 TPD
50TPD 20 TPD
addition
Total after 330 PVC Resin 250 TPD, Acetylene 110 TPD & calcium Carbide 330 TPD
250 TPD 110 TPD
expansion TPD
4. Water Requirement
Total Water 9140 KLD
2700 KLD 6440 KLD
Requirement
Fresh Water 2390 KLD 6000 KLD 8390 KLD
Recycled Treated 750 KLD
310 KLD 440 KLD
Water
Industrial Process 9100 KLD
2685 KLD 6415 KLD
Water Requirement
Domestic Water 40 KLD
15 KLD 25 KLD
Requirement
5. Waste Water Generation
Form Existing 4040
1240 2800
Project
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 25
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 26
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 27
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 28
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
13. I 22.1 Spent catalysts – 120 MTA 30 MTA 150 MTA = 80-100 Residues kg/Annum kg/Annum
Plastic Production Nos./Annum Containing Oil
14. I 22.2 Process Residues- 166 MTA 41 MTA 207 MTA 18. I 22.1 Spent catalysts – 120 MTA 30 MTA 150 MTA
Plastic Production Plastic Production
15. I 33.1 Empty Barrels / 80-100 20-25 100-125 19. I 22.2 Process Residues- 166 MTA 41 MTA 207 MTA
Containers Nos./ Nos/Annum Nos./Annum Plastic Production
Contaminated Annum 20. I 33.1 Empty Barrels / 80-100 8-10 100-125
with Hazardous Containers Nos./ Nos/Annum Nos./Annum
Chemicals/Wastes Contaminated Annum
with Hazardous
Chemicals/Wastes
From Calcium Carbide Plant:
Used Oil=5 TPA, Waste/Residue Containing Oil=10-15 kg/Annum and
Empty discarded container of hazardous chemicals = 80-100 Nos./Annum
12 Effluent Treatment Apart from pollutant specific at source treatment, a centralised effluent treatment plant has been provided within DCM Shriram Kota Complex to further treat the effluent
Plant (ETP) generation in the plants before final discharge.
For Existing
1650 KL Capacity to treat 6000 KLD Effluent
Capacity
For Additional
No addition
Capacity
For total capacity
1650 KL Capacity to treat 6000 KLD Effluent
after expansion
13 Sewage Treatment
Common Sewage Treatment Plant has been provided within DCM Shriram Kota Complex for treatment of domestic sewerage generation from entire complex
Plant (STP)
For Existing
250 KLD
Capacity
For Additional
No addition
Capacity
For total capacity
250 KLD
after expansion
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 29
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 30
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
As per EIA Notification dated 14th Sept., 2006 & as amended from time to time; this
project falls under Category “B”; Project Activity ‘5 (e)’ petrochemical based processing
(processes other than cracking & reformation and not covered under the complexes).
(iii) Need for the project and its importance to the country and or region
PVC is a versatile polymer, finding varied applications, the most important one being the
manufacture of Pipes & Fittings for irrigation purposes. PVC Pipes have very many
advantages over conventional pipes, some of them being:
Less energy is required to manufacture PVC compared to other pipe materials. PVC’s
lighter weight makes it easier and less costly to handle, transport and install. In fact,
most PVC pipe sizes can be handled manually, reducing the need for expensive
installation equipment. Sludge, slime and other residue buildups are virtually
nonexistent because of PVC pipe’s extremely smooth inner surface. The smooth interior
walls of PVC pipe translate into increased flow rates at flatter grades, resulting in
reduced trenching costs and fewer lift stations. Tough but flexible PVC will resist earth
and live load deflection and will bend under shifting soil conditions. Non-corrosive PVC
will withstand “hot soil” conditions. In fact, PVC requires virtually no maintenance. But
if it does become damaged, it can be easily hand-cut and repaired, resulting in lower
repair costs and less interruption in water service to the consumer.
Installation Made Easy Because of its lightweight and durability, PVC pipe saves time
and reduces labor, transportation and maintenance costs. As could be seen under the
Section “Demand-Supply gap”, India is deficient in PVC resin production and there is a
dire need to add capacity in the country to meet the growing demand. This would also
obviate the need to import large volumes of PVC, thereby saving considerable foreign
exchange. Also, currently, the capacity to make PVC resin is highly skewed towards the
Western region of the country. In order to optimize on transportation cost and to give a
fillip to PVC Pipe producers in the South, it is important that such capacity augmentation
takes place in South India.
(iv) Demand- Supply Gap
The demand for PVC is also expected to continue in future. In pipes sector, which
accounts for 70% of resin consumption, government investments in water services will
continue, as a number of smaller towns do not have adequate drinking water facilities.
In other major sectors such as films, footwear, cables, etc. no structural changes have
taken place, which would significantly change the pattern of PVC consumption. Under
these circumstances to bridge the gap, M/s. Shriram Vinyl & Chemical Industries is
proposing an expansion in PVC Plant.
(v) Imports vs. Indigenous Production
The additional production from project will substitute the imports.
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 31
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 32
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 33
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 35
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 36
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
(iv) Details of alternative sites consideration and basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Since, the expansion project is proposed within the existing plant premises and no
additional land is required for the same; therefore, no alternative site has been
considered. Total Land area of the project consists of 791 Acre (320.106 ha.) area of
DCM Shriram Kota Complex out of which ~ 9.48 Acre (3.83 Ha.) for PVC plant & ~
21.84 Acre (8.83 Ha.) for Calcium Carbide Plant. Land area details for PVC & Calcium
Carbide Plant.
Table: 4
Land area details for PVC & Calcium Carbide Plant:
Particulars Land Area Details Land Area Details for Total land
for PVC Plant (A) Calcium Carbide Plant (B) (A+B)
Existing land area 3.83 Hect. 8.83 Hect. 12.66 Hect.
Additional land
No addition No addition No addition
area for expansion
Total land area
3.83 Hect. 8.83 Hect. 12.66 Hect.
after expansion
(v) Size or magnitude of operation
M/s. Shriram Vinyl & Chemical Industries has planned to enhance capacity of PVC Plant
(PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant (Acetylene from 90
TPD to 110 TPD) through modernization within existing project premises at DCM
Shriram Complex Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan).
Table: 5
Existing and proposed Production details
Existing Additional Final Capacity
S. No. Unit
Capacity Capacity after expansion
1. PVC Resin (TPD) 200 50 250
2. Acetylene (TPD) 90 20 110
3. Calcium Carbide (TPD) 330 - 330
4. Hydrated Lime sludge (TPD) – By 350 60 410
Product
5. Steam from waste heat recovery 360 - 360
boiler (TPD) – By Product
(vi) Project description with process details (a schematic diagram/ flow chart
showing the project layout, components of the project etc. should be given)
Project Description
M/s. Shriram Vinyl & Chemical Industries has planned to enhance capacity of PVC Plant
(PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant (Acetylene from 90
TPD to 110 TPD) through modernization within existing project premises at DCM
Shriram Complex Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan).
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 37
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 39
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
(vii) Raw material required along with estimated quantity, likely source, marketing
area of final products, mode of transport of raw material and finished product.
a) Raw Material Requirements
Details reg. raw material is given in Table - 6 and Table - 7:
Table - 6
Raw Material Requirement, Source & Transportation for PVC Plant
S. Name of Quantity (TPD) Source Distance & No. of trips
No. Raw Additional Total Mode of per day &
Material for Capacity Transportation Loading
Existing Capacity
Proposed After
Expansion Expansion
1. Internal
Continuous
Acetylene (Calcium 1000 M (Approx)
90 20 110 round the
Gas Carbide Closed Pipe lines
clock
Plant)
2. Internal
Continuous
(Caustic 200 M ( Approx)
HCl (30%) 425 105 530 round the
soda Closed Pipe lines
clock
Plant)
Table - 7
Raw Material Requirement, Source & Transportation for Calcium Carbide Plant
S. Name of Raw Quantity (TPD) Source Distance & No. of trips
No. Material Additional Total Mode of per day &
for Capacity Transportation Loading
Existing Capacity
Proposed After
Expansion Expansion
1. Lime Stone*/ 700 700
Merta
Lime City 14 trips/30
TPD/425 Nil TPD/425 300 KM / Truck
Borunda MT
TPD TPD Gotan
2.
Total
Ghandi
Carbon
Dham 750 KM / Truck & 12 Trip / 27
Material
Meethap Rail Transfort MT
320 TPD Nil 320 TPD
(Charcoal/ ur Jam Rail Transport
Nagar : 3 No. rake /
Coal/Petcoke
Vadodara month @
/ Anthracite
/Other Coke) 3500MT/rake
Fuel Requirement: No fuel required for the enhancement capacity of PVC Resin &
Acetylene, as sufficient continues power is available in DCM Shriram Complex to cater the
requirements.
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 40
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 41
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Table - 8
Water Requirement Details
Particulars Water Water Total Water Additional Total Water
required required requirement Water Requirement
for PVC for Calcium (A+B) requirement After
Plant (A) Carbide Existing Proposed Expansion
Plant (B) Expansion
Total Water Requirement 2700 KLD 6440 KLD 9140 KLD Nil 9140 KLD
Fresh Water 2390 KLD 6000 KLD 8390 KLD Nil 8390 KLD
Recycled Treated Water 310 KLD 440 KLD 750 KLD Nil 750 KLD
Industrial Process Water 9100 KLD Nil 9100 KLD
2685 KLD 6415 KLD
Requirement
Domestic Water 40 KLD Nil 40 KLD
15 KLD 25 KLD
Requirement
Table – 9
Waste Water Generation Details
Particulars Waste Water Waste Water Total Waste
from PVC Plant from Calcium Water
(A) Carbide Plant (B) generation
(A+B)
From Existing Plant 1240 2800 4040
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 42
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Water Agreement
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 43
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 44
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 45
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Steam Condensate
from PVC Plant (190)
All figures in KLD.
Steam Condensate
from Caustic Soda
Plant (140)
Steam to PVC
Boiler Feed 350 and Caustic
Soda Plants
Evaporation &
Drift Losses 10
(1435) Boiler
10
Blowdown
30
Blowdown and
Cooling Towers 110 Filter Back 110
1545 wash
Evopration and
Raw Water losses rom
(6000) 1710
sludge
4400
Effluent from
Process 2680 2680
process
25
10
With product
Septic Tank/
Domestic 25
Soak Pits
Effluent
Acidic Water
440 Neutralization
from PVC Plant
System
3240
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 46
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Source: Owned Captive Power Plant located within DCM Shriram kota complex and/or RSEB.
(X) Quantity of waste to be generated (liquid and solid) and scheme for their
management/disposal
Domestic wastewater generated from plant is treated in common STP and the
treated water is utilized for greenbelt development/ plantation.
Dust collected from various air pollution control equipment is recycled into the
process.
Sewage sludge generated from STPs is used as manure in greenbelt development/
plantation.
4.0 SITE ANALYSIS
(i) Connectivity
The site is well connected to NH 76 (2.0 km in SE direction), NH 12 (3.5 km in SW
direction), SH 51 (1.0 km in North direction), SH 70 (4.5 km in North direction) & SH
33 (7.0 km in NW direction) from the plant site. Nearest city to the plant site is Kota.
Nearest Railway Station is Dakaniya Talaav Railway Station (~3.0 km in NW direction
from the plant site) and nearest Airport is Kota Airport (~ 4.0 km in NW direction from
the plant site).
The site is well connected with communication facilities like telephone, fax, wireless
and telex and as such, no constraints are envisaged in this aspect as the Tehsil and
District headquarters are near to the site.
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 47
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
S. Details
Particulars
No. (with approx. aerial distance & direction from the plant site)
1. Nearest Town DCM Shriram Kota complex located within municipal premises
Kota City. District Headquarter Kota is located @ distance of
approx. 3.5 km.
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 48
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
S. Details
Particulars
No. (with approx. aerial distance & direction from the plant site)
6. Reserved Forests
(RF) / Protected RF (~ 2.0 km in South direction)
Forests (PF) etc. PF (~ 14.0 km in SSE direction)
within 10 km radius
7. River / Water Body Sur Sagar (~ 1.0 km in East direction)
(within 10 km Kansuwa Nadi (~ 3.0 km in North direction)
radius)
Alnia Nadi (~ 1.5 km in SSE direction)
Kishor Talav (~ 6.0 km in NW direction)
Chambal River (~6.2 km in NW direction)
Chandloi Nadi (~ 10.0 km in NE direction)
Abhera Talav (~ 13.0 km in NW direction)
8. Seismic Zone Zone –II [as per IS 1893 (Part-I): 2002]
9. Soil Type Clayey loam to clay, generally non calcareous, colour varies
from brown to dark brown.
(v) Existing Infrastructure
No additional land is required for proposed expansion, as expansion will be done
within the existing plant premises.
Following infrastructure facilities are available, which will be expanded as per the
requirement:
Workshop
A common mechanical and electrical workshop is located to take care of the regular
maintenance/repair jobs in the plant.
Machinery Stores
A temporary store house required for storing tools, spare parts, consumables etc.
already exists. During construction, open area will be made available for storing
machinery and construction materials for the proposed expansion project.
Cranes, Monorails and pulley blocks
Adequate sized maintenance cranes/hoists, monorails and pulley blocks are available
at all suitable locations in the plant for ease of maintenance and operation.
Time and security office
Time office & a security office have already been established at the main gate entrance
of the plant.
Health Centre
Health centre/ dispensary is provided.
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 49
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Weighbridge
Electrical weighbridges are available to take care of the incoming and outgoing
materials in the existing plant premises.
Bag Godown
Space has been provided in the packing plant area for the storage of bags.
Parking
Adequate parking space is available within site for the parking of the vehicles.
Residential area
Well established residential colony is available along with all the required social
amenities for the Staff and Workers.
Storage facilities
Adequate storage facilities are provided for the storage of raw materials & finished
product, which are detailed in below Table 12 & 13:
Table: 12
STORAGE FACILITIES FOR PVC PLANT
Type of Type of Storage Capacity No. of storage
Materials days
Additional Total after Additional Total after
for Expansion for Expansion
Existing Existing
Proposed Proposed
Expansion Expansion
PVC Resin Go down NIL Go down 600 MT NIL 600 MT 3 days
(packed) NIL
PVC resin Silo NIL Silo 300 MT NIL 300 MT 1 Day
Hydro Tank Nil Tank 3 X 50 Nil 3 X 50 =150 No separate
chloric Acid =150 M3 M3 storage ,All
(30%) (Process (Process tanks are used
Tanks) Tanks) as process tanks
Acetylene Gas Nil Gas Holder 2600 M3 Nil 2600 M3 Continuous
Holder ( Gas Holder) ( Gas Holder)
supply to PVC
Plant from
existing gas
holder
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 50
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Table: 13
STORAGE FACILITIES FOR CALCIUM CARBIDE PLANT
S. No. Raw Material Existing Storage Additional Capacity after
Capacity Proposed Expansion
Capacity
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 51
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 52
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 53
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
For total capacity after expansion 1650 KL Capacity to treat 6000 KLD Effluent
Hydrated lime slurry, which is obtained during the chemical reaction, is by product of
the process and contains 92-94 % water & 6-8 % hydrated lime. This hydrated lime
slurry is pumped to decanter system/lagoon which facilitates recovering hydrated lime
by decanting water. Hydrated lime is utilized in Cement manufacturing within the
complex and water is sent to centralized effluent treatment scheme for neutralization
with acidic effluent of PVC plant and settling of suspended solids and clear water
pumped back to carbide plant (near Acetylene gas generation plant). The treated
effluent is discharged into internal common drain, which ultimately flows outside the
complex along with effluents discharged by other units operative within the complex
after two settling pits (two polishing pits provided before discharge of total effluents in
addition to large settling system in centralized effluent treatment scheme).
Centralized effluent treatment scheme is having neutralization system of capacity
about 450 m3 with settling capacity is about 1200 m3 (Three pits in series after
neutralization pit). The part effluent from fertilizer is utilized in centralized effluent
treatment scheme to improve the settling. The centralized effluent treatment scheme is
having identical standby arrangement for changing over the system during
cleaning/maintenance. The neutralization system having auto pH correction system &
flow measuring device at the outlet.
The treated effluent, before finally discharging outside the complex, is passed through
settling tank (i.e. two nos. polishing pits). Industry has installed on-line effluent
monitoring system at the final outlet of the complex for measuring parameters-pH, TSS,
Ammonical Nitrogen, Temperature & Flow. The schematic diagram of Common Waste
Water Treatment Plant is as under:
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 54
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
The domestic effluent (sewage water) generated in DCM Shriram Kota complex is
treated in a common Sewage Treatment Plant of 250 KLD capacity (for entire DCM
Shriram, Kota complex) of MBBR Technology. The treated sewage water (domestic
water) is gainfully utilized in horticulture & plantation development within the
complex. The schematic diagram of STP is as under:
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 55
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 56
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Table: 14
SOLID/HAZARDOUS WASTE GENERATION FROM PVC PLANT
25. I 33.1
Empty Barrels / 80-100 Nos./ 20-25 100-125
Containers Annum Nos/Annum Nos./Annum
Contaminated with
Hazardous
Chemicals/Wastes
CAPACITY & MODE OF SECURED STORAGE & ENVIRONMENTAL SAFE GUARDS
1. I 5.1 Used or Spent Oil 20 MT Different grades of oil are being used in
(from different plants. The used oil is being reclaimed in
operations) oil reclamation plant by centrifuging and
filtration. This oil is again used in
equipment. In this process some oil is
generated as used oil. This oil is
collected in drums and stored in a
facility having covered shed & spillage
recovery system.
The used oil collected in a drum is sold
to authorised/registered recyclers.
2. I 5.2 Wastes or - Mainly oil soaked cotton waste from
Residues maintenance activities. It is stored in
Containing Oil MS/PVC drums and incinerated in Kiln
3. I 22.1 Spent catalysts – 20 MT Spent carbon catalyst containing
Plastic mercury is generated during
Production manufacture of intermediate product
Vinyl Chloride for manufacturing of PVC
Resin. It is collected in PVC/HDPE
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 57
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
Table: 15
SOLID/HAZARDOUS WASTE GENERATION FROM CALCIUM CARBIDE PLANT
Source: Owned Captive Power Plant located within DCM Shriram kota complex and/or RSEB.
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy to be adopted (Central/State) in respect of the project affected persons
including home oustees, land oustees and landless labourers
R & R Plan is not applicable; as the expansion project is proposed within the existing
premises.
8.0 PROJECT SCHEDULE AND COST ESTIMATES
(i) Likely date of start of construction and likely date of completion
The project will start only after obtaining Environmental Clearance and/or other
applicable clearance. An implementation period of 13 months from the date of signing/
effectiveness of the main equipment supply contract is foreseen for this project.
(ii) Estimated project cost Details
Table: 16
Estimated Project and EMP Cost Details
S. Cost Details PVC Plant Calcium Carbide Total Cost
No. (A) Plant (B) (A+ B)
1. Project Cost
Additional Project Cost for expansion Rs. 29.0 Cr Rs. 3.30 Cr Rs. 32.30 Cr
Total Project Cost after expansion Rs. 135.33 Cr Rs. 118.96 Cr Rs. 254.29 Cr
Existing EMP Cost Rs. 37.00 Lacs Rs. 1075.00 Lacs Rs. 1112.00 Lacs
Additional EMP Cost for expansion Rs. 56.00 Lacs Nil Rs. 56.00 Lacs
Total EMP Cost after expansion Rs. 93.00 Lacs Rs. 1075.00 Lacs Rs. 1168.00 Lacs
Existing EMP Recurring Cost Rs. 15.00 Lacs Rs. 732.00 Lacs Rs. 747.00 Lacs
Additional EMP Recurring Cost for expansion Rs. 18.00 Lacs Rs. 5.00 Lacs Rs. 23.00 Lacs
Total EMP Recurring Cost after expansion Rs. 33.00 Lacs Rs. 737.00 Lacs Rs. 770.00 Lacs
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 59
Proposed Capacity Enhancement of PVC Plant (PVC Resin from 200 TPD to 250 TPD) and Calcium Carbide Plant
(Acetylene from 90 TPD to 110 TPD) through modernization within existing project premises at DCM Shriram Complex
Kota, Shriram Nagar, Tehsil: Ladpura, District: Kota (Rajasthan)
Pre - Feasibility Report
M/s. Shriram Vinyl & Chemical Industries (A unit of DCM Shriram Ltd.) 60