Professional Documents
Culture Documents
Computer maintenance
11.3 3,000.00 3,000.00
Name of Sana All Inaalagaan
Project:
Repair and replacement of damaged roofs,
12.1 gutters, ceilings, windows & doors 3,000.00 3,000.00
Name of Bata: AAngat Ka!
Project:
Printing of modules (MDL)
13.1 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 5,000.00
Name of GOLD in Reading Program (Gearing Onwards
Project: Love & Desire in reading)
Reproduction of reading materials
14.1 1,500.00 1,500.00
Name of NAT Enrichment Program
Project:
Reproduction of NAT Enrichment Modules
15.1 3,000.00
Name of Sana All May TIP (Teacher Induction Program)
Project:
Reproduction of TIP Modules
16.1 2,000.00 1,000.00 1,000.00 1,000.00 1,000.00
Conduct School-Based Teacher Induction
16.2 Program 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00
Name of DNHS High sa Performance
Project:
Send teachers to the different seminars and
17.1 trainings 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00
Acquisition of additional instructional and
17.2 learning materials 5,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 1,000.00
Implementation of School Learning Action
17.3 Cell (SLAC) sessions 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00 1,000.00
Send teachers to SEAMEO innotech distant
17.4 learning 6,000.00 6,000.00 6,000.00
Name of #awardsPaMore
Project:
Giving of awards, incentives and recognition
18.1 to students 5,000.00 2,000.00 2,000.00
Name of #UnityisStrength
Project:
Giving of awards, incentives and recognition
19.1 to parents & stakeholders 1,000.00
Name of TPIP (Trabahong Pangkinabukasan Immersion
Project: Program)
Provisions of family insurance to SHS job-
20.1 trainees 1,000.00
Implementation of the Work Immersion
20.2 3,000.00 3,000.00 3,000.00 1,000.00
Name of #TulongDunong
Project:
Acquisition of Printer Machine
21.1 13,000.00 5,000.00 5,000.00 8,000.00 5,000.00 5,000.00 5,000.00 5,000.00
Student school supplies
21.2 3,000.00 3,000.00
Monthly Electrical Subscription &
21.3 maintenance 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00
Name of SBM TALK (Target Assessment Level 3 on Key
Project: areas)
Periodic Updating of SBM documents
22.1 1,000.00 1,000.00
SBM monitoring and evaluation
22.2 3,000.00
Name of
Project: #WeImproveAsOne
Conduct State of the School Address
23.1 (SOSA) 2,000.00
Distribute School Report Card to
23.2 stakeholders 2,000.00
#SystemEnhanced
Name of
Project:
Formulate effective system using,
borrowing and inventory of all school
24.1 properties and facilities 2,000.00
Name of #FeedbackForGood
Project:
Enhance effective satisfaction survey
format, feedback, performance appraisal
25.1 and client satisfaction surveys. 2,000.00
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
1.3 #NAME?
Printer 15,003.00
Bondpaper Long 1,760.00
Bondpaper Short 1,900.00
Brown Foldrer 500.00
Brown Envelop 400.00
Pencil 600.00
Ballpen 990.00
Cartolina 700.00
Pentel Pen 240.00
INK 320.00
Ruler 300.00
Scissors 500.00
Masking Tape 480.00
Meter Stick 600.00
Fastener 210.00
"Katahum CNHS"
Name of
Project:
Partnership with BLGU in
2.1 reaching out Identified OSY
Bond Paper 440.00
Ink 45.00
Folder 15.00
Partnership with the District
2.2
ALS in session implementation
Paint Latex 3,600.00
Tinting Color Yellow 285.00
Tinting Color Red 285.00
Tinting Color Blue 285.00
Tinting Color Black 285.00
Roller 480.00
Paint Brush # 1 250.00
Paint Brush #2 250.00
Paint Brush #4 300.00
Directory Signages 2,200.00
Paint tray 250.00
Signages 2,640.00
Labor 3,890.00
Annual Electrical Integrity and
2.3 safety
Service Fee 50,000.00
#NAME?
2.4
Service Fee 2,450.00 2,450.00 2,450.00 2,450.00
#NAME?
2.5
Hard Hat 6,000.00
Vest 1,200.00
Tarpauline 1,600.00
Gloves 600.00
Small Pail # 4 1,800.00
#NAME?
2.6
Hollowblocks 1,840.00
Cement 2,160.00
10 mm Corrugated Bar 1,160.00
9 mm Corrugated Bar 920.00
Plywood 335.00
Nails 140.00
Tie Wire # 16 70.00
Labor 2,321.00
#NAME?
2.7
Plumbing Works
PVC Pipe 20 mm 900.00
Elbow 240.00
Faucet 585.00
Teflon 180.00
Solvent 210.00
Drain 225.00
PVC Thread 120.00
Steel Works
Steel Rod 1,600.00
Steel Truss 1,820.00
Galvanize Iron 1,750.00
Masonry Work
Hollowblocks 1,256.00
Cement 1,680.00
Sand 2,000.00
Painting Work
Paint 2,232.00
Cost of Labor 5,202.00
2.8 #NAME? 29,800.00
2.9 #NAME?
Angle Bar 4,070.00
Welding Rod 200.00
Grinding Disc 100.00
Cutting Disc 100.00
Labor 1,530.00
2.10 #NAME?
Wire 520.00
Plug 200.00
Reciptacles 200.00
Bulb 880.00
2.11 #NAME?
Paint (Thalo Green) 3,500.00
Plywood 2,680.00
Nails # 1 190.00
Nails # 2 210.00
Nails # 3 210.00
Tie Wire # 16 240.00
Roller 375.00
Labor 2,595.00
2.12 #NAME?
Paint 25,110.00
Tinting Color Raw Sienna 2,250.00
Roller 1,600.00
Paint Tray 1,000.00
Thinner 1,000.00
2.13 #NAME?
Trovel (Surot) 850.00 765.00
Clippers 1,200.00
Shear ( Trimming Tools) 930.00
Wheelborrow 3,500.00 3,500.00
Proning Sheers 720.00
Hose 3,200.00
Rake 460.00 460.00
Sprinkler 450.00
Pot 300.00
Rubber Gloves 240.00 300.00
Cultivator 500.00 250.00
Hoe 1,750.00
Bolo (Lagaraw) 900.00 900.00
Spade 2,000.00
Shovel 4,200.00
Pail 450.00
Gardening Boots 510.00
Waterring Can 1,065.00
Pruners 600.00
2.14 #NAME?
Zonrox 240.00
Diswashing Liquid 120.00
Downy 384.00
Albatros 300.00
Air Freshener 840.00
Soap powder 240.00
Mop 200.00
Soft Broom 192.00
Glass Cleaner 184.00
Detergent Bar 140.00
Alcohol 160.00
2.15 #NAME? 29,000.00 14,500.00
2.16 #NAME?
Angle Bar 5,084.00
Welding Rod 300.00
Corrugated Bar #9 mm 1,610.00
Grinding Disc 200.00
Cutting Disc 200.00
Labor 2,606.00
3.6 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
"Kapit-Bisig 3 K, CNHS OK
Name of
Project:
4.1 Feeding Program
Rice 881.00 881.00 881.00 881.00 881.00 881.00 881.00
Garlic 15.00 50.00 50.00 15.00 10.00 45.00 15.00
Onion 15.00 50.00 50.00 15.00 55.00 15.00
Oil 60.00 120.00 120.00 60.00 60.00 60.00 60.00
Salt 30.00 30.00 30.00 30.00 30.00 60.00 30.00
Soy sauce 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Pepper 30.00 30.00 30.00 30.00 30.00
Evaporated milk 135.00 90.00
Macaroni 255.00 234.00
Knorr cubes 30.00 30.00 30.00 30.00
eggs 190.00 190.00 80.00 190.00
Magic Sarap 15.00 15.00 15.00 30.00 15.00
Meat 457.00 457.00
Chicken 534.00 712.00 712.00 534.00 534.00 534.00
Carrots 100.00
Papaya
Bread 150.00 150.00 180.00 150.00
Juice 150.00 150.00 75.00
String beans
4.2 Deworming 1,800.00 1,800.00
(292.00)
ANNUAL PROCUREMENT PLAN 2020
QUAN QUAN QUAN QUANTI QUANTI QUAN QUANTI QUANTI QUAN QUAN QUAN QUAN
TITY PRICE JANUARY TITY PRICE FEBRUARY TITY PRICE MARCH TY PRICE APRIL TY PRICE MAY TITY PRICE JUNE TY PRICE JULY TY PRICE AUG. TITY PRICE SEPT. TITY PRICE OCT. TITY PRICE NOV. TITY PRICE DEC.
#NAME?
2.7
Plumbing Works
PVC Pipe 20 mm 6 150.00 900.00
Elbow 12 20.00 240.00
Faucet 9 65.00 585.00
Teflon 6 30.00 180.00
Solvent 6 35.00 210.00
Drain 4 56.25 225.00
PVC Thread 6 20.00 120.00
Steel Works
Steel Rod 20 80.00 1,600.00
Steel Truss 7 260.00 1,820.00
Galvanize Iron 7 250.00 1,750.00
Masonry Work
Hollowblocks 1 1,256.00 1,256.00
Cement 1 1,680.00 1,680.00
Sand 1 2,000.00 2,000.00
Painting Work
Paint 4 558.00 2,232.00
Cost of Labor 1 5,184.00 5,202.00
2.8 #NAME? 2 14,900.00 29,800.00
#NAME?
2.9
Angle Bar 5 814.00 4,070.00
Welding Rod 2 100.00 200.00
Grinding Disc 1 100.00 100.00
Cutting Disc 1 100.00 100.00
Labor 1 1,530.00 1,530.00
2.1 #NAME?
Wire 20 26.00 520.00
Plug 4 50.00 200.00
Reciptacles 4 50.00 200.00
Bulb 4 220.00 880.00
2.11 #NAME?
Paint (Thalo Green) 5 700.00 3,500.00
Plywood 8 335.00 2,680.00
Nails # 1 2 95.00 190.00
Nails # 2 3 70.00 210.00
Nails # 3 3 70.00 210.00
Tie Wire # 16 6 40.00 240.00
Roller 5 75.00 375.00
Labor 1 2,595.00 2,595.00
2.12 #NAME?
Paint 45 558.00 25,110.00
Tinting Color Raw Sienna 45 50.00 2,250.00
Roller 20 80.00 1,600.00
Paint Tray 20 50.00 1,000.00
Thinner 2 500.00 1,000.00
2.13 #NAME?
Trovel (Surot) 10 85.00 850.00 9 85.00 765.00
Clippers 6 200.00 1,200.00
Shear ( Trimming Tools) 6 155.00 930.00
Wheelborrow 1 3,500.00 3,500.00 1 3,500.00 3,500.00
Proning Sheers 6 120.00 720.00
Hose 1 3,200.00 3,200.00
Rake 1 460.00 460.00 1 460.00 460.00
Sprinkler 3 150.00 450.00
Pot 2 150.00 300.00
Rubber Gloves 4 60.00 240.00 5 60.00 300.00
Cultivator 10 50.00 500.00 5 50.00 250.00
Hoe 5 350.00 1,750.00
Bolo (Lagaraw) 2 450.00 900.00 2 450.00 900.00
Spade 5 400.00 2,000.00
Shovel 10 420.00 4,200.00
Pail 10 45.00 450.00
Gardening Boots 2 255.00 510.00
Waterring Can 3 355.00 1,065.00
Pruners 4 150.00 600.00
#NAME?
Zonrox 12 20.00 240.00
Diswashing Liquid 2 60.00 120.00
Downy 64 6.00 384.00
Albatros 6 50.00 300.00
Air Freshener 3 280.00 840.00
Soap powder 48 5.00 240.00
Mop 2 100.00 200.00
Soft Broom 3 64.00 192.00
Glass Cleaner 2 92.00 184.00
Detergent Bar 7 20.00 140.00
Alcohol 2 80.00 160.00
2.15 #NAME? 2 14,500.00 29,000.00 1 14,500.00 14,500.00
#NAME?
Angle Bar 6.2457 814.00 5,084.00
Welding Rod 3 100.00 300.00
Corrugated Bar #9 mm 14 115.00 1,610.00
Grinding Disc 2 100.00 200.00
Cutting Disc 2 100.00 200.00
Labor 1 2,606.00 2,606.00
Prepared by:
1.1 Instructional Supplies/ Materials/Resources 1,700.00 1,720.00 440.00 63,500.00 118,757.00 94,160.00 52,790.00 47,138.00 14,520.00 165,780.00 22,840.00 10,312.00
Name of "Katahum CNHS"
Project:
2.1 Annual Electrical Integrity and safety
-
-
7,350.00
9,000.00
8,946.00
20,000.00
- 238012
10,000.00 51550
-
15,000.00
3,000.00
43,500.00
10,000.00
-
-
10,000.00
50,000.00
-
-
14,400.00
-
15,000.00
-
36,400.00
73,403.00
-
4,500.00
1,800.00
-
210,000.00
57,000.00
156,000.00
90,144.00
60,000.00
3,600.00
4,000.00
PROJECT PROCUREMENT MANAGEMENT PLAN 2020
Department: DEPARTMENT OF EDUCATION (DEPED)
Agency : CONCEPCION NATIONAL HIGH SCHOOL
Operating Unit: CITY SCHOOLS DIVISION
School ID: 304669
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUG. SEPT. OCT. NOV. DEC.
#NAME?
2.2
Service Fee 2,450.00 2,450.00 2,450.00
#NAME?
2.3
Hard Hat 6,000.00
Vest 1,200.00
Tarpauline
Gloves
Small Pail # 4 1,800.00
#NAME?
2.4
Hollowblocks 1,840.00
Cement 2,160.00
10 mm Corrugated Bar 1,160.00
9 mm Corrugated Bar 920.00
Plywood 335.00
Nails 140.00
Tie Wire # 16 70.00
Labor 2,321.00
#NAME?
2.5
Plumbing Works
PVC Pipe 20 mm 900.00
Elbow 240.00
Faucet 585.00
Teflon 180.00
Solvent 210.00
Drain 225.00
PVC Thread 120.00
Steel Works
Steel Rod 1,600.00
Steel Truss 1,820.00
Galvanize Iron 1,750.00
Masonry Work
Hollowblocks 1,256.00
Cement 1,680.00
Sand 2,000.00
Painting Work
Paint 2,232.00
Cost of Labor 5,202.00
2.60 #NAME?
Wire
Plug
Reciptacles
Bulb
2.7 #NAME?
Paint 3,500.00
Plywood 2,680.00
Nails # 1 190.00
Nails # 2 210.00
Nails # 3 210.00
Tie Wire # 16 240.00
Roller 375.00
Labor 2,595.00
2.8 #NAME?
Paint
Tinting Color Raw Sienna
Roller
Paint Tray
Thinner
2.9 #NAME?
Trovel (Surot) 850.00
Clippers 1,200.00
Shear ( Trimming Tools) 930.00
Wheelborrow 3,500.00
Proning Sheers 720.00
Hose 3,200.00
Rake 460.00
Sprinkler 450.00
Pot 300.00
Rubber Gloves 240.00
Cultivator 500.00
Hoe 1,750.00
Bolo (Lagaraw) 900.00
Spade
Shovel
Pail
Gardening Boots
Waterring Can
Pruners
2.1 #NAME? -
Zonrox 240.00
Diswashing Liquid 120.00
Downy 384.00
Albatros 300.00
Air Freshener 840.00
Soap powder 240.00
Mop 200.00
Soft Broom 192.00
Glass Cleaner 184.00
Detergent Bar 140.00
Alcohol 160.00
2.11 #NAME? 29,000.00 14,500.00
2.12 #NAME?
Angle Bar 5,084.00
Welding Rod 300.00
Corrugated Bar #9 mm 1,610.00
Grinding Disc 200.00
Cutting Disc 200.00
Labor 2,606.00
2.13 #NAME? -
2.14 #NAME? -
2.15 #NAME? 10,000.00
2.16 Demolition of Depleted Building 50,000.00
ISOLATION ROOM
Door 3,000.00
Tiles 3,910.00
Paint 1,160.00
Cement 1,680.00
Curtain 450.00
Folding Bed 4,000.00
Labor 3,400.00
"Kapit-Bisig 3 K, CNHS OK
Name of
Project:
4.1 Feeding Program
Rice 881.00 881.00
Garlic 15.00 50.00
Onion 15.00 50.00
Oil 60.00 120.00
Salt 30.00 30.00
Soy sauce 50.00 50.00
Pepper 30.00
Evaporated milk
Macaroni
Knorr cubes 30.00
eggs 190.00
Magic Sarap 15.00
Meat - 457.00
Chicken 534.00 712.00
Carrots
Papaya
Bread 150.00
Juice - 150.00
String beans -
4.2 Deworming 1,800.00
1,708.00
ANNUAL PROCUREMENT PLAN 2020
QUAN QUAN QUAN QUANTI QUANTI QUAN QUANTI QUANTI QUAN QUAN QUAN QUAN
TITY PRICE JANUARY TITY PRICE FEBRUARY TITY PRICE MARCH TY PRICE APRIL TY PRICE MAY TITY PRICE JUNE TY PRICE JULY TY PRICE AUG. TITY PRICE SEPT. TITY PRICE OCT. TITY PRICE NOV. TITY PRICE DEC.
"Sulong na… CNHS, Lipad na…, CNHS the
Name of Best"
Project:
1.3 Instructional Resources/Supplies
Toner 1 3,300.00 3,300.00 2 3,300.00 6,600.00 2 3,300.00 6,600.00
Plastic Envelope long 600 20.00 12,000.00
Tucker 2 650.00 1,300.00
CD 10 15.00 150.00
Scissor 5 34.00 170.00
Record Book 5 52.00 260.00
Manila Paper 285 4.00 1,140.00
Masking tape 4 40.00 160.00 36 40.00 1,440.00
Ballpen Black 40 21.00 840.00
Ballpen Red 40 21.00 840.00
Pencil 7 150.00 1,050.00
Bond paper-Legal 2 220.00 440.00 2 220.00 440.00 2 220.00 440.00 287 220.00 63,140.00 433 220.00 95,260.00 346 220.00 76,120.00 239 220.00 52,580.00 178 220.00 39,258.00 66 220.00 14,520.00 719 220.00 158,180.00 68 220.00 14,960.00 46 220.00 10,120.00
Bond paper-short 15 190.00 2,850.00 1 192.00 192.00
Bond paper,A4 10 200.00 2,000.00 21 190.00 4,000.00
Folder-long 107 5.00 535.00
Folder-Short 100 4.00 400.00
Fastener 10 35.00 350.00
Push pins 8 20.00 160.00 1 20.00 20.00
Pentel pen 40 40.00 1,600.00 1 40.00 40.00
Ink-pentel pen refill 40 80.00 3,200.00
Paper clip 12 11.00 132.00
White mailing envelope-long 20 15.00 300.00
Construction paper 10 90.00 900.00
Glue 5 40.00 200.00
Printer Ink 4 320.00 1,280.00 4 320.00 1,280.00 4 320.00 1,280.00 4 320.00 1,280.00
Universal Ink 28 45.00 1,260.00 30 45.00 1,350.00 52 45.00 2,340.00
Stapler 1 400.00 400.00 3 480.00 1,440.00 28 45.00 1,260.00
Staple wires 4 50.00 200.00 8 50.00 400.00 3 50.00 150.00
Linen Paper 11 50.00 550.00
Weighing Scale 1 1,000.00 1,000.00
#NAME?
Plumbing Works
PVC Pipe 20 mm 6 150.00 900.00
Elbow 12 20.00 240.00
Faucet 9 65.00 585.00
Teflon 6 30.00 180.00
Solvent 6 35.00 210.00
Drain 4 56.25 225.00
PVC Thread 6 20.00 120.00
Steel Works
Steel Rod 20 80.00 1,600.00
Steel Truss 7 260.00 1,820.00
Galvanize Iron 7 250.00 1,750.00
Masonry Work
Hollowblocks 1 1,256.00 1,256.00
Cement 1 1,680.00 1,680.00
Sand 1 2,000.00 2,000.00
Painting Work
Paint 4 558.00 2,232.00
2.8 Cost of Labor 1 5,184.00 5,202.00
#NAME?
Wire
Plug
Reciptacles
2.7 Bulb
#NAME?
2.14 #NAME?
2.15 #NAME?
#NAME? 20 500.00 10,000.00
2.16 Demolition of Depleted Building 1 50,000.00 50,000.00
ISOLATION ROOM
Door 1 3,000.00 3,000.00
Tiles 85 46.00 3,910.00
Paint 2 580.00 1,160.00
Cement 7 240.00 1,680.00
Curtain 3 150.00 450.00
Folding Bed 2 2,000.00 4,000.00
Labor 1 3,570.00 3,400.00
Prepared by: