You are on page 1of 1

UNIVERSITI KUALA LUMPUR

MALAYSIAN INSTITUTE OF CHEMICAL & BIOENGINEERING


TECHNOLOGY

Section of Chemical Engineering Technology (Process)


PLANT MAINTENANCE & INSPECTION

CPD 30103 JULY 2020 SESSION 2020/2021

ASSIGNMENT 2

Instruction

Write a report on TWO of the equipment’s (related to utilities) at UniKL MICET and
propose a scheduled maintenance checklist.

Report:

Use Times New Roman, font 12. You may write up to a maximum of 10 pages of A4
size paper including diagrams and list of references. Be clear and concise.

You might also like