You are on page 1of 15

NRN KNITTING & GARMENTS LTD.

181, Jamgora, Ashulia, Savar,Dhaka


Monthly Fire Extinguisher Check list Year: 2020

Sl No Description YES NO N/A

1 Location in designated place

2 No obstruction to access or visibility

3 Operating instructions on nameplate legible and


facing outward
4 Safety seals and tamper indicators not broken or
missing
5 Fullness determined by weighing or “hefting”

6 Examination for obvious physical damage,


corrosion, leakage, or clogged nozzle
7 Pressure gauge reading or indicator in the
operable range or position
8 Condition of tires, wheels, carriage, hose, and
nozzle checked (for wheeled units)
9 HMIS label in place

Inspector Prottoy Chakrabarty


Fire Safety Officer
NRN KNITTING & GARMENTS LTD.
181, Jamgora, Ashulia, Savar,Dhaka
Monthly Fire Hydrant Check list Year: 2020

Door Fire Hose Hose Hydrant Box


SRL Month Nozzle Coupling Hose Pipe Signature
Switch Valve Rack Cleaning

1 Jan
2 Feb
3 Mar
4 Apr
5 May
6 Jun
7 Jul
8 Aug
9 Sep
10 Oct
11 Nov
12 Dec

Inspector Prottoy Chakrabarty


Fire Safety Officer
NRN KNITTING & GARMENTS LTD
181 Jamgora, Ashulia, Savar, Dhaka
FIRE EQUIPMENTS INSPECTION CHECK LIST

FIRE
FIRE HAND LOCK GAS FIRE
Month ESCAPE
BLANKET GLOVES
HELMET SHOES STRECHER
CUTTER MASK BITTER
HOOK SIGN
MASK

JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

Inspector Prottoy Chakrabarty


Fire Safety Officer
NRN KNITTING & GARMENTS LTD
181 Jamgora, Ashulia, Savar, Dhaka

Emergency & exit light Maintenance Checklist Month of June 2020

Sl. No Description Yes No N/A

A functional test has been conducted on every required


1 emergency lighting system at 30-day intervals for a minimum
of 30 seconds.

An annual test has been conducted on every required


2 battery-powered emergency & exit lighting system for not
less than 90 minutes. Equipment shall be fully operational
for the duration of the test.

3
Exit signs shall be visually inspected for operation of the
illumination sources at intervals not to exceed 30 days.

AC power supply to each emergency & exit light has been


4 disconnected

Battery backup, output voltage and line voltage to remote


5 fixtures has been checked.

Each emergency & exit light and lens has been cleaned if
6 required.

7 Beam has been adjusted for proper alignment if required.

Testing lable on emrgency light and exit light and testing log
8 has been placed on the log book

A minimum illumination level (By Emergency Light) of 10lux


9 for all corridors, exit doors and stairways has been checked
properly. Aisles shall be provided with a minimum
illumination level of 2.5 lux.

Inspector Prottoy Chakrabarty


Fire Safety Officer
NRN KNITTING & GARMENTS LTD
181 Jamgora, Ashulia, Savar, Dhaka
Monthly fire door inspection checklist Month of October 2020

Door Door Door Smoke Hold Vision Lock & Panic Door
SRL No Door Location Leaf Fram Hinges Closer Seals Open Panel Latch Push Bar Coordinator Signature Remarks
device
1 Ground floor store beside stair 1
2 Ground floor store front side
3 Ground floor stair 3
4 Ground floor Bonded warehouse
5 Ground floor Boiler
6 Ground floor Sub Staion
7 Ground floor Gnerator room
8 1st floor beside stair 1
9 1st floor beside Stair 2
10 1st floor beside Stair 3
11 2nd floor beside stair 1
12 2nd floor beside Stair 2
13 2nd floor beside Stair 3
14 3rd floor beside stair 1
15 3rd floor beside Stair 2
16 3rd floor beside Stair 3
17 4th floor beside stair 1
18 4th floor beside Stair 2
19 4th floor beside Stair 3
20 5th floor beside stair 1
21 5th floor beside Stair 2
22 5th floor beside Stair 3
23 6th floor beside stair 1
24 6th floor beside Stair 2
25 6th floor beside Stair 3
26 7th floor beside stair 1
27 7th floor beside Stair 2
28 7th floor beside Stair 3
Inspector Prottoy Chakrabarty
Fire Safety Officer
NRN KNITTING & GARMENTS LTD
181 Jamgora, Ashulia, Savar, Dhaka
Monthly fog light inspection checklist Month of March 2020

Light Battery Power


Floor Location Quantity Switch Wiring Back Up Connection Signature Remarks

GF

1st Floor

2nd Floor

3rd Floor

4th Floor

5th Floor

6th Floor

7th Floor

Inspector Prottoy Chakrabarty


Fire Safety Officer
Hose Box Hose Box
Number Number
01 02

Hose Box Hose Box


Number Number
03 04
Hose Box Hose Box
Number Number
05 06

Hose Box Hose Box


Number Number
07 08
Hose Box Hose Box
Number Number
09 10

Hose Box Hose Box


Number Number
11 12
Hose Box Hose Box
Number Number
13 14

Hose Box Hose Box


Number Number
15 16
Hose Box Hose Box
Number Number
17 18

Hose Box Hose Box


Number Number
19 20
Hose Box Hose Box
Number Number
21 22

Hose Box Hose Box


Number Number
23 24
NRN KNITTING & GARMENTS LTD.
181 jamgora, Ashuhlia, Savar, Dhaka

Hose Box & Landing valve Address

Hose box Landing valve


SRL Floor Location Remarks
Number number

Beside time section 1

Beside 01 number stair 2


1 GF
Beside generator room 3

east side in accessories room 4

Beisde 01 number stair 5

2 1st Beside 02 number stair 6

beside 03 number stair 7

Beisde 01 number stair 8

3 2nd Beside 02 number stair 9

beside 03 number stair 10

Beisde 01 number stair 11

4 3rd Beside 02 number stair 12

beside 03 number stair 13

Beisde 01 number stair 14

5 4th Beside 02 number stair 15

beside 03 number stair 16

Beisde 01 number stair 17

6 5th Beside 02 number stair 18

beside 03 number stair 19

Beisde 01 number stair 20

7 6th Beside 02 number stair 21


7 6th

beside 03 number stair 22

Beisde 01 number stair 23

8 7th Beside 02 number stair 24

beside 03 number stair 25

You might also like