Professional Documents
Culture Documents
: HDEC-MECH-2019-001
GENERAL PERMIT Date: 28 March 2019
Contractor Name: HDEC
Permit Work Activity; Installation Warehouse Method Statement: Required ☐ Yes ☐ No
SECTION 1 WORK REQUEST
PTW Issuing Authority: Ilmansyah Badge No.:
Contact No. 081374666085 Work Location: Near Office DSS
SECTION 2 ACTIVITY SPECIFIC DETAILS
Activity Hazards Control Measures
SEE JSA
SECTION 3 PROTECTIVE EQUIPMENT
☐ Clothing ☐ Ear Plug / Ear Muff ☐ Full Body Harness ☐ PersonalH2S Detector
☐ Safety Helmet ☐ Dust / Gas Mask ☐ Lifeline ☐ Others ( Specify)
☐ Safety Shoes ☐ Gloves ( ___________ ) ☐ Fire Extinguisher
☐ Eye Protection ☐ Face Shield ☐ Respirator /SCBA
SECTION 4 ADDITIONAL PERMIT REQUIRED
☐ Not Applicable ☐ Confined Space Entry ☐ Excavation ☐ Hot Work
☐ Non-Critical Lift ☐ Critical Lifting ☐ Non-Destructive Testing ☐ Others (Specify)
SECTION 5 APPROVAL
HDEC Construction team Signature: Date:
HDEC Safety Team Signature: Date:
Permit Start Date: 29 March 2019 Permit Finish Date: 04 April 2019
Section 6 PERMIT EXTENSION APPROVALS
PTW Issuing Authority Signature: Valid Until: