Doc. Ref.

: SECO/SHE/F-002
Rev. No.: 01
PERMIT TO WORK Issue Date: 21.10.2019

PTW #: DATE ISSUED: TIME ISSUED:


29.03.2021 11.00 am
SECTION A (Permit Request)
WORKERS/CONTRACTOR NAME
FASTCOLL CORPORATION SDN BHD
JOB DESCRIPTION (detail)
TEST RUN ECS EQUIPMENT

PROJECT / LOCATION
KVMRT SSP Line / Location
CYBERJAYA STATION (CTER)

TYPE OF WORK
Working at height (W.A.H) with checklist Lifting with checklist Equipment Installation
Hot Work with checklist Elevated Work Excavation (1.5 m >)
Confined Space with checklist Live Electrical Work Others (please specify):
PERSONNAL PROTECTIVE EQUIPMENT
Safety Helmet Safety Shoes / Boots Hi Visibility Vest
Hand Protection (please specify): Ear Protection(please specify): Fall Protection (please specify):
Eye Protection (please specify): Respiratory Protection (please specify): Others (please specify): Face Mask
MACHINERY / EQUIPMENT / PLANT USAGE
Scaffolding Excavator / Backhoe Air Compressor
Crane (please specify): Power Tools Generator Set (please specify):
MEWP(please specify): Hand Tools Other (please specify): LADDER
WORKING HAZARD
Working at Height Dust / Fibress (health hazard) Breathing Air
Floor Opening Electrical Shock Heat (exposure to high temp)
Electrical Shock Ergonomic (Body Posture) Other (please specify):
PERMIT REQUESTED BY
Name Date Signature
AHMAD SHAH BIN ZAINAL 29.03.2021
ID:L49748 / 019-3550603

SECTION B (to be approve by SECO Project Team Engineer / Manager)


PERMIT APPROVED BY

Signature PERMIT VALIDITY

Name Date
Designation Time
SECTION C (Permit Closing)
Job Complete Job Pending Housekeeping
Equipment / Material Stored Other (please specify): …………………………………………………………………………………………………………………………………...
Requestor Signature Approval Signature
(to be approve by SECO Project Team Engineer / Manager)

Name: Name:
Date: Date:
Time: Time:
Doc. Ref.: SECO/SHE/F-002
Rev. No.: 01
PERMIT TO WORK Issue Date: 21.10.2019

SECTION D
(FOR SAFETY SECO/PDP/MRT PERSONNEL USE ONLY)