Chapter 1
Commissioning
Commissioning Commissioning
Item Equipment/System Complete—
Required— Required—
Date
Y/N Y/N
1. Permanent power to fire alarm (FA) system
2. Test booklet/list of devices on site
3. Sequence of operations posted
Chapter 3
Chapter 1
System Integrated System
Commissioning
Commissioning Commissioning
Item Equipment/System Complete—
Required— Required—
Date
Y/N Y/N
30. Flow devices and tampers
Chapter 2
31. Special extinguishing systems, e.g., preaction
and deluge systems
32. Signage on FA panels, doors to rooms with FA
panels inside inspected
33. Notification devices
Chapter 3
34. Instrumentation for testing and monitoring
35. Terminal devices for electrical systems
Chapter 4
Chapter 5
Appendix B
Appendix B
The approval section that follows can be used if applicable to the planning process. Approval can be granted by the
Owner/representative, Design Team, or CxP depending on the Owner’s requirements.
I have reviewed the required items and plans and verified that they meet the project requirements:
Appendix B