Chapter 1
Commissioning
Commissioning Commissioning
Item Equipment/System Complete—
Required— Required—
Date
Y/N Y/N
1. Landscape irrigation systems
2. Static pressure devices
Chapter 3
3. Backflow preventers
4. Flowmeters
5. Weather-based or soil-moisture-based
controllers and timers
6. Sprinklers
Chapter 4
7. Rainfall sensors
8. Soil moisture sensors
9. The use of drip/microirrigation
10. Hydrozoning
Chapter 5
Appendix B
Appendix B
The approval section that follows can be used if applicable to the planning process. Approval can be granted by the
Owner/representative, Design Team, or CxP depending on the Owner’s requirements.
Appendix B
I have reviewed the required items and plans and verified that they meet the project requirements:
Owner or Owner’s Representative Name: ___________________________________________________________
Company Name: ______________________________________________________________________________
Signature: _____________________________________________ Date: _________________________________