You are on page 1of 14

Lovely Professional University, Punjab

Course Code Course Title Course Planner


PTE202 DRILLING TECHNOLOGY 25133::Adityam Dutta

Course Outcomes :Through this course students should be able to

CO1 :: describe oil and gas well drilling operations.


CO2 :: memorize the field equipment's used in drilling practices.
CO3 :: apply fundamental equations and calculations used in drilling engineering.
CO4 :: analyze the nature of difficulties and predict solutions to the problems in drilling.

Reference Books ( R )
Sr No Title Author Publisher Name
R-1 DRILLING ENGINEERING DR. J. J. AZAR AND DR. NOT MENTIONED
G. ROBELLO SAMUEL

Relevant Websites ( RW )
Sr No (Web address) (only if relevant to the course) Salient Features
RW-1 https://www.google.co.in/url? Equivalent circulating density (ECD) flow models.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwikqa7rn
cXYAhWKrI8KHStxDSAQFggtMAA&url=http%3A%2F
%2Fwww.glossary.oilfield.slb.com%2FTerms%2Fe
%2Fequivalent_circulating_density.aspx&usg=AOvVaw1cSRl3aftkqJrdoGstu7pE
RW-2 https://www.google.co.in/url? Fluid flow and pressure drop across bit nozzles.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwiMsuiin
cXYAhXFuY8KHTguD10QFggoMAA&url=http%3A%2F
%2Fwww.drillingformulas.com%2Fpressure-drop-across-a-bit
%2F&usg=AOvVaw1gOrtkF5f8nh3BKpFLzvB2
RW-3 https://www.google.co.in/url? Pressure losses in pipe and annulus during drilling operations.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwjCvPLf
nMXYAhWBqI8KHVh1CX8QFggtMAA&url=http%3A%2F
%2Fwww.drillingformulas.com%2Funderstand-pressure-loss-frictional-pressure-in-
drilling-system%2F&usg=AOvVaw149XLXdRDyTN_HJMupS7pQ

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
RW-4 https://www.google.co.in/url? Types of fluids and its flow.
sa=t&rct=j&q=&esrc=s&source=web&cd=7&cad=rja&uact=8&ved=0ahUKEwiYmPO
fnMXYAhUjTI8KHWL0BeEQFghPMAY&url=http%3A%2F
%2Fwww.brighthubengineering.com%2Fhydraulics-civil-engineering%2F47264-
classification-of-fluid-flow-based-on-flow-pattern
%2F&usg=AOvVaw2ZjwxFc2rKm_Gq26zb-e6c
RW-5 https://www.google.co.in/url? Fluid flow and associated pressures in the rotary rig circulating system.
sa=t&rct=j&q=&esrc=s&source=web&cd=7&cad=rja&uact=8&ved=0ahUKEwijid7K
m8XYAhUPSI8KHUcLCRoQFghXMAY&url=http%3A%2F%2Fwww.google.com
%2Fpatents%2FUS9097085&usg=AOvVaw1zVniNZY7KupSIyrPqpjG2
RW-6 https://www.google.co.in/url? Volume and weight-related calculations of mud during drilling.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwiOsvfh
msXYAhXLNo8KHXD_AagQFggoMAA&url=http%3A%2F%2Fwww.springer.com
%2Fcda%2Fcontent%2Fdocument%2Fcda_downloaddocument%2F9783319631899-
c2.pdf%3FSGWID%3D0-0-45-1613822-
p181018203&usg=AOvVaw0kKqA2oZLCti_fjn_IWDCg
RW-7 https://www.google.co.in/url? Mud density and hydrostatic pressure calculations.
sa=t&rct=j&q=&esrc=s&source=web&cd=15&cad=rja&uact=8&ved=0ahUKEwjW_N
2kmsXYAhUBOo8KHYifB98QFghtMA4&url=http%3A%2F
%2Fwww.drillingformulas.com%2Funderstand-hydrostatic-pressure
%2F&usg=AOvVaw09srvaKY9ws_GvbcfdqR0R
RW-8 https://www.google.co.in/url? Mud conditioning system.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwibxIHp
mcXYAhXFvY8KHTW4DI4QFggoMAA&url=http%3A%2F
%2Foilfield.gnsolidscontrol.com%2Fdrilling-mud-fluid-conditioning-systems
%2F&usg=AOvVaw2t_tnX8eY1CUUs70QFocVW
RW-9 https://www.google.co.in/url? Rheology of mud, additives and mud contamination.
sa=t&rct=j&q=&esrc=s&source=web&cd=9&cad=rja&uact=8&ved=0ahUKEwiOj7Kb
mcXYAhUJTo8KHbAFD4oQFghpMAg&url=http%3A%2F%2Fwww.eng.cu.edu.eg
%2Fusers%2Faelsayed%2FMud
%2520engineering.pdf&usg=AOvVaw2D6kpsBaZh5gs0-PMYjeBt
RW-10 https://www.google.co.in/url? Drilling fluids - its functions and types, compositions and properties of
sa=t&rct=j&q=&esrc=s&source=web&cd=8&cad=rja&uact=8&ved=0ahUKEwjOzLm mud.
_mMXYAhUjTI8KHWL0BeEQFghiMAc&url=http%3A%2F%2Fwiki.aapg.org
%2FDrilling_fluid&usg=AOvVaw2v4aICwht53KFhgTbgQkmT
RW-11 https://www.google.co.in/url? Field problems pertaining to cementation job and cement slurry
sa=t&rct=j&q=&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=0ahUKEwiy7ZvK calculations.
l8XYAhVMo48KHabRCLIQFgguMAE&url=http%3A%2F%2Fpetrowiki.org
%2FCementing_operations&usg=AOvVaw1q7mihTdLl34tzH5liSGPW
RW-12 https://www.google.co.in/url? Methods of cementing and cementing accessories.
sa=t&rct=j&q=&esrc=s&source=web&cd=11&cad=rja&uact=8&ved=0ahUKEwj0yJz
mlsXYAhWILY8KHfs0CZ8QFghnMAo&url=https%3A%2F%2Fwww.scribd.com
%2Fdocument%2F293526978%2FCementing-cement-evaluation-
pdf&usg=AOvVaw1QluzVX1gcEFtv1ph_-U98

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
RW-13 https://www.google.co.in/url? Cementation operations- functions of cement and its classification,
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwiOs72Q strength retrogradation and cement additives.
lsXYAhUQ148KHTNNBdQQFggoMAA&url=http%3A%2F%2Fwww.eng.cu.edu.eg
%2Fusers%2Faelsayed
%2FCementing.pdf&usg=AOvVaw3eyUQDCXbNUFrF3i7A8Vg5
RW-14 https://www.google.co.in/url? Casing design and it's related numerical problems.
sa=t&rct=j&q=&esrc=s&source=web&cd=7&cad=rja&uact=8&ved=0ahUKEwjFoJG-
lcXYAhUMMo8KHTjtANQQFghOMAY&url=http%3A%2F%2Fwww.ptil.no
%2Fgetfile.php%2F131354%2Fz%2520Konvertert%2FHelse%252C%2520milj
%25C3%25B8%2520og%2520sikkerhet%2FSikkerhet%2520og%2520arbeidsmilj
%25C3%25B8%2FDokumenter
%2Fberntodshell2.pdf&usg=AOvVaw0R6vQ4YuYjVQ2X_qh6RqUR
RW-15 https://www.google.co.in/url? API grades of the casing and its properties, threads and couplings.
sa=t&rct=j&q=&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=0ahUKEwiNgorql
MXYAhUDro8KHd2jAIYQFggvMAE&url=http%3A%2F%2Fwww.api.org%2F~
%2Fmedia%2Ffiles%2Fcertification%2Fmonogram-apiqr%2Fprogram-updates%2F5ct-
9th-edition-purch-guidelines-r1-
20120429.pdf&usg=AOvVaw0_MxFXpHlffWrlBonGaMGF
RW-16 https://www.google.co.in/url? Casing – its functions and types
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwiV3pam
lMXYAhVEMY8KHeF8AAgQFggoMAA&url=http%3A%2F%2Fpetrowiki.org
%2FCasing_and_tubing&usg=AOvVaw3s6gAVGp0_FwZ27wWG9Dgv
RW-17 https://www.google.co.in/url? Coring and fishing tools and their operations.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwih4dPL
k8XYAhUEQo8KHY4ZDHgQFggoMAA&url=http%3A%2F%2Fwww.slb.com%2F~
%2Fmedia%2FFiles%2Ffishingsidetracking%2Fproduct_sheets
%2Ffishing_tools_services_catalog.pdf&usg=AOvVaw3aoicdxAUkf9oW32z2jJzD
RW-18 https://www.google.co.in/url? Well control - well control equipment BOP and different techniques of
sa=t&rct=j&q=&esrc=s&source=web&cd=7&cad=rja&uact=8&ved=0ahUKEwjZpLb7 well control,
ksXYAhUDwI8KHegcDV0QFghMMAY&url=http%3A%2F%2Fwww.iwcf.org
%2Fprogrammes%2Fdrilling-well-
control&usg=AOvVaw0IBX3DESFWKcp4zepowsoC
RW-19 https://www.google.co.in/url? Downhole motors, survey equipment, and rotary survey system.
sa=t&rct=j&q=&esrc=s&source=web&cd=8&cad=rja&uact=8&ved=0ahUKEwj63fWv
ksXYAhUJvI8KHSU-B2YQFghAMAc&url=http%3A%2F%2Fwww.slb.com
%2Fservices%2Fdrilling%2Fdrilling_services_systems%2Fdirectional_drilling
%2Fsurveying.aspx&usg=AOvVaw0YWg_fmZExc6eua8OsPOky
RW-20 https://www.google.co.in/url? The terminology and basic mathematics used in directional wells.
sa=t&rct=j&q=&esrc=s&source=web&cd=3&cad=rja&uact=8&ved=0ahUKEwiEwtba
kcXYAhUHOY8KHQLGBLYQFggzMAI&url=https%3A%2F%2Fwww.scribd.com
%2Fdocument%2F264326507%2FBasic-Terminology-Directional-
Drilling&usg=AOvVaw0fAlvfmINW9TiMRmARTF4o
RW-21 https://www.google.co.in/url? Introduction to multilateral drilling techniques.
sa=t&rct=j&q=&esrc=s&source=web&cd=4&cad=rja&uact=8&ved=0ahUKEwjqpc2uj
MTYAhXGNY8KHX9RA9MQFghAMAM&url=http%3A%2F%2Fwww.slb.com%2F-
%2Fmedia%2FFiles%2Fresources%2Foilfield_review%2Fdefining_series
%2FDefining-Multilateral-Wells.pdf%3Fla%3Den%26hash
%3D730D37E002832607122133A9D5A2E62F555EF545&usg=AOvVaw3dZo5P_MAf
bXBYykc2vpL2
An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
RW-22 https://www.google.co.in/url? Introduction to directional drilling and horizontal drilling.
sa=t&rct=j&q=&esrc=s&source=web&cd=4&cad=rja&uact=8&ved=0ahUKEwiN4NW
Si8TYAhUJO48KHUa_CbAQFgg5MAM&url=https%3A%2F
%2Fwww.petroskills.com%2Fblog%2Fentry%2F00_totm%2Fintroduction-to-
directional-drilling&usg=AOvVaw1lhh08em8MFjYdluGAaxnY
RW-23 https://www.google.co.in/url? Hole problems -lost circulation, kick etc
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwiF98vpi
cTYAhVKQo8KHUiaA7gQFggoMAA&url=http%3A%2F%2Fwildwell.com
%2Fliterature-on-demand%2Fliterature%2Ftraining-tools%2Fcirculation-and-well-
control.pdf&usg=AOvVaw2DLup1g4PuaUb3lTMx3iJb
RW-24 https://www.google.co.in/url? Geometry of a stuck pipe and remedial methods.
sa=t&rct=j&q=&esrc=s&source=web&cd=3&cad=rja&uact=8&ved=0ahUKEwj86p3si
MTYAhXERY8KHUCCBusQFgg2MAI&url=http%3A%2F
%2Fwww.drillingformulas.com%2Fstuck-pipe-prevention-book
%2F&usg=AOvVaw1zJgoWs2PRDL_RDbSC73-z
RW-25 https://www.google.co.in/url? Problems concerned with drilling fluid and drill pipe stuck up.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwi7u82ii
MTYAhUHS48KHW1eBl8QFggoMAA&url=http%3A%2F%2Fpetrowiki.org
%2FStuck_pipe&usg=AOvVaw3lBiu_5rGdtmRXy72ZN4p0
RW-26 https://www.google.co.in/url? Problems concerned with drilling fluid and drill pipe stuck up.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwiTye-
Jh8TYAhUIrI8KHfusBOwQFggoMAA&url=http%3A%2F%2Fpetrowiki.org
%2FStuck_pipe&usg=AOvVaw3lBiu_5rGdtmRXy72ZN4p0
RW-27 https://www.google.co.in/url? Circulation system - mud pumps, numerical related to mud pumps of
sa=t&rct=j&q=&esrc=s&source=web&cd=3&cad=rja&uact=8&ved=0ahUKEwj1r969h circulation system.
MTYAhUQT48KHRYxCU8QFggvMAI&url=https%3A%2F%2Fwww.elsevier.com
%2Fbooks%2Fapplied-drilling-circulation-systems%2Fguo%2F978-0-12-381957-
4&usg=AOvVaw2GkV9CYYO5QKB2UdGyfBj0
RW-28 https://www.google.co.in/url? Application of bit and dull bit gradation.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwjsxLTe
g8TYAhVEvI8KHUrHDScQFggoMAA&url=http%3A%2F%2Fwww.halliburton.com
%2Fpublic%2Fsdbs%2Fsdbs_contents%2FData_Sheets
%2FH03086.pdf&usg=AOvVaw1n4VbYlFQyRgp-x-TfOJmL
RW-29 https://www.google.co.in/url? Application of drill bit, and dull bit gradation.
sa=t&rct=j&q=&esrc=s&source=web&cd=2&cad=rja&uact=8&ved=0ahUKEwie19ON
g8TYAhWBgI8KHQuwB_gQFggzMAE&url=http%3A%2F%2Fwww.slb.com
%2Fservices%2Fdrilling%2Fdrill_bits.aspx&usg=AOvVaw2a-iou1_C26iEFUjv4eQo3
RW-30 https://www.google.co.in/url? Drilling bit and IADC classification of bit.
sa=t&rct=j&q=&esrc=s&source=web&cd=8&cad=rja&uact=8&ved=0ahUKEwi0rqHV
gcTYAhVGKY8KHXyRATEQFghWMAc&url=http%3A%2F%2Fwww.iadc.org
%2Fwp-content%2Fuploads%2F2015%2F08%2Fpreview-
bits.pdf&usg=AOvVaw3MmiUaFT0UijJ7sjKem2pb
RW-31 https://www.google.co.in/url? Various factors affecting ROP.
sa=t&rct=j&q=&esrc=s&source=web&cd=3&cad=rja&uact=8&ved=0ahUKEwj8xcW
KgMTYAhUKo48KHcYQDoMQFgg3MAI&url=http%3A%2F%2Foges.info
%2Flibrary%2F137110%2FFACTORS-AFFECTING-
ROP&usg=AOvVaw0Li3toYKLvkJeTSulx_QQz

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
RW-32 https://www.google.co.in/url? Drilling operations, problems and solutions.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwj33OC
Z_8PYAhUDNI8KHRqOCdgQFggoMAA&url=http%3A%2F%2Fpetrowiki.org
%2FPEH%3ADrilling_Problems_and_Solutions&usg=AOvVaw06-
xDFeJVfIVGqThHFj5L7
RW-33 https://www.google.co.in/url? Horsepower calculations for draw-works and rotary system.
sa=t&rct=j&q=&esrc=s&source=web&cd=6&cad=rja&uact=8&ved=0ahUKEwiZ3dCr
_sPYAhVEK48KHSTkDEAQFghGMAU&url=http%3A%2F%2Fwww.oil-india.com
%2Fpdf%2Ftenders%2Flimited
%2FDoc_CDG8715L13.pdf&usg=AOvVaw1tU7YtoFAEeF07dSNqfDJQ
RW-34 https://www.google.co.in/url? Types of onshore and offshore rigs with its selection criteria.
sa=t&rct=j&q=&esrc=s&source=web&cd=4&cad=rja&uact=8&ved=0ahUKEwjQvL7I
_cPYAhWLYo8KHTP9BZYQFgg9MAM&url=http%3A%2F%2Fwww.unimasr.net
%2Fums%2Fupload%2Fnewuploads%2Fuploads2009%2FuploadsOct
%2FUniMasr.com_d8d5f84f7f85ab04e9f487f6c0186382.pdf&usg=AOvVaw2nyvD-
LkOZCL85Tp2GEBnJ
RW-35 https://www.google.co.in/url? Drilling fluid circulation system.
sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&uact=8&ved=0ahUKEwj00rDk
_MPYAhUV148KHdvKDGwQFggtMAA&url=http%3A%2F
%2Fwww.oilngasdrilling.com%2Fdrilling-rig-circulating-
system.html&usg=AOvVaw2LCoNzHha5yLuvuWmkGLGO
RW-36 https://www.google.co.in/url? Hoisting and rotary system.
sa=t&rct=j&q=&esrc=s&source=web&cd=12&cad=rja&uact=8&ved=0ahUKEwisnJO
L-8PYAhUdTI8KHWGCArIQFgheMAs&url=http%3A%2F%2Faoscoly.com%2Fweb
%2Fpdf%2Fdrilling_rigs%2Fhoisting-system-and-rotary-
equipment.pdf&usg=AOvVaw2lrWzCla3_EVpFbQYyxaMY
RW-37 https://www.google.co.in/url? Power generation system for drilling rigs.
sa=t&rct=j&q=&esrc=s&source=web&cd=3&cad=rja&uact=8&ved=0ahUKEwiopsag-
sPYAhUcR48KHY3IDbMQFgg0MAI&url=http%3A%2F
%2Fwww.oilngasdrilling.com%2Fdrilling-rig-power-
system.html&usg=AOvVaw3mGN4lKtVE0haoR3lbyGnC
RW-38 https://www.google.co.in/url? Introduction to oil and gas drilling hardware system.
sa=t&rct=j&q=&esrc=s&source=web&cd=6&cad=rja&uact=8&ved=0ahUKEwioi9Sn-
cPYAhUGuY8KHSWdDCIQFghIMAU&url=http%3A%2F%2Fblog.indelac.com
%2Fintroduction-to-oil-gas-offshore-drilling&usg=AOvVaw2Haq2GUg6-
Pksgmxq1LJPV
Audio Visual Aids ( AV )
Sr No (AV aids) (only if relevant to the course) Salient Features
AV-1 https://www.youtube.com/watch?v=tyB3W2v7g10 Equivalent circulating density (ECD) flow models.
AV-2 https://www.youtube.com/watch?v=oUd4WxjoHKY Fluid flow and pressure drop across bit nozzles.
AV-3 https://www.youtube.com/watch?v=w7n0srAzm8g Pressure losses in pipe and annulus during drilling operations
AV-4 https://www.youtube.com/watch?v=6kTvQEMwOfM Types of fluids and its flow
AV-5 https://www.youtube.com/watch? Fluid flow and associated pressures in the rotary rig circulating system
v=nvMeIBnVsKw&list=PLbMVogVj5nJQJ9mEUoQj8EPyhH1QMYPh6

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
AV-6 https://www.youtube.com/watch?v=56S7pb-SVyo Drilling fluids - its functions and types, compositions and properties of
mud.
AV-7 https://www.youtube.com/watch?v=nsf2Qut2Ywk Field problems pertaining to cementation job and cement slurry
calculations.
AV-8 https://www.youtube.com/watch?v=NTXBTYiFkKY Methods of cementing and cementing accessories.
AV-9 https://www.youtube.com/watch?v=7ZWlvlo9bOI Cementation operations- functions of cement and its classification,
strength retrogradation and cement additives
AV-10 https://www.youtube.com/watch?v=724KdR1YwNM Casing design and it's related numerical problems.
AV-11 https://www.youtube.com/watch?v=oeyIcjR_zkw API grades of the casing and its properties, threads and couplings
AV-12 https://www.youtube.com/watch?v=74UOvKCt_Zg Casing – its functions and types.
AV-13 https://www.youtube.com/watch?v=Y5J9gCqGWJU Coring and fishing tools and their operations.
AV-14 https://www.youtube.com/watch?v=VW3yULTG9NY Well control - well control equipment BOP and different techniques of
well control,
AV-15 https://www.youtube.com/watch?v=9TEyYRAu2Uk Downhole motors, survey equipment, rotary survey system.
AV-16 https://www.youtube.com/watch?v=46jli_SCUjY The terminology and basic mathematics used in directional wells
AV-17 https://www.youtube.com/watch?v=IrkMpSHAN8c Introduction to multilateral drilling techniques.
AV-18 https://www.youtube.com/watch?v=gPcpYqEGfTs Introduction to directional drilling and horizontal drilling.
AV-19 https://www.youtube.com/watch?v=WzARQchATOI Hole problems -lost circulation, kick etc
AV-20 https://www.youtube.com/watch?v=o1F_QO8w_-w Geometry of a stuck pipe and remedial methods.
AV-21 https://www.youtube.com/watch?v=HNDuYPZ9e2Q Problems concerned with drilling fluid and drill pipe stuck up.
AV-22 https://www.youtube.com/watch?v=KovWXkppGOQ Circulation system - mud pumps, numerical related to mud pumps of
circulation system
AV-23 https://www.youtube.com/watch?v=1d9oXQSXPfo Application of bit and dull bit gradation.
AV-24 https://www.youtube.com/watch?v=EGbnCWng0Hg Drilling bit and IADC classification of bit.
AV-25 https://www.youtube.com/watch?v=-7u4GR9M0yg Various factors affecting ROP in drilling.
AV-26 https://www.youtube.com/watch?v=HPb7wpiMxuQ Drilling operations, problems and solutions.
AV-27 https://www.youtube.com/watch?v=yHfnL43H48g Horsepower calculations for draw-works and rotary system.
AV-28 https://www.youtube.com/watch?v=-OIKe3fX1l4 Types of onshore and offshore rigs with its selection criteria.
AV-29 https://www.youtube.com/watch?v=KovWXkppGOQ Drilling fluid circulation system.
AV-30 https://www.youtube.com/watch?v=i01q7xT_tmY Hoisting and rotary system.
AV-31 https://www.youtube.com/watch?v=i0qUkxR1Irk Hoisting and rotary system.
AV-32 https://www.youtube.com/watch?v=io6DYFRzlTs Power generation system for drilling rigs.
AV-33 https://www.youtube.com/watch?v=SfazJ6P_g7w Introduction to oil and gas drilling hardware system.
AV-34 https://www.youtube.com/watch?v=NYMv-8H4nBU Volume and weight-related calculations of mud during drilling.

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
LTP week distribution: (LTP Weeks)
Weeks before MTE 7
Weeks After MTE 7
Spill Over (Lecture) 7

Detailed Plan For Lectures


Week Lecture Broad Topic(Sub Topic) Chapters/Sections of Other Readings, Lecture Description Learning Outcomes Pedagogical Tool Live Examples
Number Number Text/reference Relevant Websites, Demonstration/
books Audio Visual Aids, Case Study /
software and Virtual Images /
Labs animation / ppt
etc. Planned
Week 1 Lecture 1 Introduction to drilling and R-1 RW-38 Lecture-1: Zero lecture Lecture 1: Students Lecture delivery
drilling rigs(introduction to AV-33 for the introduction to will be conversant with power point
oil and gas drilling hardware the Course objectives, with the course presentations,
system) structure, and details of
objectives and videos,
academic tasks. academic details. animations, and
Lecture 2: Students discussion.
Lecture-2: Introduction will be introduced to
to oil and gas drilling the basic concept and
operations and hardware importance of oil and
system. gas well drilling
along with the
hardware components
to the students.
Lecture 2 Introduction to drilling and R-1 RW-38 Lecture-1: Zero lecture Lecture 1: Students Lecture delivery
drilling rigs(introduction to AV-33 for the introduction to will be conversant with power point
oil and gas drilling hardware the Course objectives, with the course presentations,
system) structure, and details of
objectives and videos,
academic tasks. academic details. animations, and
Lecture 2: Students discussion.
Lecture-2: Introduction will be introduced to
to oil and gas drilling the basic concept and
operations and hardware importance of oil and
system. gas well drilling
along with the
hardware components
to the students.
Lecture 3 Introduction to drilling and R-1 RW-37 Describe the power The student will learn Lecture delivery
drilling rigs(power AV-32 generation system for the various sources of with power point
generation system for drilling rigs. power generation for presentations,
drilling rigs) drilling rigs. videos,
animations, and
discussion.

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
Week 2 Lecture 4 Introduction to drilling and R-1 RW-36 Introduction to the The students gain Lecture delivery
drilling rigs(hoisting and AV-30 hoisting and rotary knowledge of the with power point
rotary system) AV-31 system and their hoisting and rotary presentations,
components. system used in oil videos,
and gas well drilling. animations, and
discussion.
Lecture 5 Introduction to drilling and R-1 RW-35 Introduction to drilling The students will Lecture delivery
drilling rigs(drilling fluid AV-29 fluid circulation system. gain knowledge of with power point
circulation system) the drilling fluid presentations,
circulation system. videos, animations,
and discussion.
Lecture 6 Introduction to drilling and R-1 RW-34 Describe the types of The students will be Lecture delivery
drilling rigs(types of onshore AV-28 onshore and offshore able to analyze types with power point
and offshore rigs with its rigs with its selection of onshore and presentations,
selection criteria) criteria. offshore rigs with its videos,
selection criteria animations, and
discussion.
Week 3 Lecture 7 Introduction to drilling and R-1 RW-33 Describe the methods of The students will be Lecture delivery
drilling rigs(horsepower AV-27 horsepower calculations able to calculate the with power point
calculations for draw-works for draw-works and horsepower required presentations,
and rotary system.) rotary system. for draw-works and videos,
rotary system for animations, and
drilling. discussion.
Lecture 8 Mud engineering(drilling R-1 RW-10 Introduction to drilling The students will be Lecture delivery
fluids - its functions and AV-6 fluids - its functions and able to understand the with videos,
types, compositions and types, compositions and drilling fluids - its animations, and
properties of mud) properties of mud. functions and types, discussion.
compositions and
properties of mud.
Lecture 9 Mud engineering(rheology R-1 RW-9 Discuss the rheology of The students gain Lecture delivery
of mud, additives and mud mud, additives and mud knowledge of the with videos,
contamination) contamination. rheology of mud, animations, and
additives and mud discussion.
contamination
Week 4 Lecture 10 Mud engineering(mud R-1 RW-8 Introduce the mud The students will be Lecture delivery
conditioning system) RW-27 conditioning system and able to understand the with videos,
its components. mud conditioning animations, and
system and its discussion.
components.
Lecture 11 Mud engineering(mud and R-1 RW-7 Discuss mud density and The students will be Lecture delivery
hydrostatic pressure hydrostatic pressure able to solve with videos,
calculations) calculations. numericals related to animations, and
mud density and discussion.
hydrostatic pressure
calculations.

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
Week 4 Lecture 12 Mud engineering(volume R-1 RW-6 Discuss the volume and The students will be Lecture delivery
and weight-related AV-34 weight-related able to solve volume with videos,
calculations of mud during calculations of mud and weight-related animations, and
drilling.) during drilling. calculations of mud discussion.
during drilling.
Week 5 Lecture 13 Mud engineering(circulation R-1 AV-22 Introduce the circulation The students will be Lecture delivery
system - mud pumps, system - mud pumps, able to understand the with videos,
numerical related to mud and describe numerical circulation system - animations, and
pumps of circulation system) related to mud pumps of mud pumps and solve discussion.
circulation system. numerical related to
mud pumps of
circulation system.
Lecture 14 Drilling operations and R-1 RW-31 Describe the drilling The students will be Lecture delivery
difficulties(drilling RW-32 operations problems and able to analyze the with power point
operations, problems and AV-25 solutions along with the drilling operations presentations,
solutions, factors affecting AV-26 factors affecting ROP. problems and predict videos,
ROP) the solutions along animations, and
with the factors discussion.
affecting ROP.
Lecture 15 Online Assignment
Week 6 Lecture 16 Drilling operations and R-1 RW-28 Introduction to drilling The students will Lecture delivery
difficulties(drilling bit and RW-29 bit and IADC gain knowledge of with power point
IADC classification of bit, RW-30 classification of bit, drilling bit and IADC presentations,
application of bit, dull bit AV-23 Applications of bit and classification of bit videos,
gradation) AV-24 dull bit gradation. along with the animations, and
applications of bit discussion.
and dull bit
gradation.
Lecture 17 Drilling operations and R-1 RW-24 Describe the problems The students will be Lecture delivery
difficulties(problems RW-25 concerned with drilling able to analyze the with videos,
concerned with drilling fluid RW-26 fluid and drill pipe stuck problems concerned animations, and
and drill pipe stuck up, AV-21 up, Analyze the with drilling fluid and discussion.
geometry of a stuck pipe and AV-20 geometry of a stuck pipe drill pipe stuck up,
remedial methods.) and remedial methods. the geometry of a
stuck pipe and
propose the remedial
methods.
Lecture 18 Drilling operations and R-1 RW-24 Describe the problems The students will be Lecture delivery
difficulties(problems RW-25 concerned with drilling able to analyze the with videos,
concerned with drilling fluid RW-26 fluid and drill pipe stuck problems concerned animations, and
and drill pipe stuck up, AV-21 up, Analyze the with drilling fluid and discussion.
geometry of a stuck pipe and AV-20 geometry of a stuck pipe drill pipe stuck up,
remedial methods.) and remedial methods. the geometry of a
stuck pipe and
propose the remedial
methods.

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
Week 7 Lecture 19 Drilling operations and R-1 RW-23 Discuss the hole The students will be Lecture delivery
difficulties(hole problems - AV-19 problems -lost able to find the faced with power point
lost circulation, kick etc.) circulation, kick etc. hole problems and presentations,
propose the solutions videos,
to -lost circulation, animations, and
kick etc. discussion.

SPILL OVER
Week 7 Lecture 20 Spill Over
Lecture 21 Spill Over

MID-TERM
Week 8 Lecture 22 Casing and cementation R-1 RW-15 Describe the casing – its The students gain the Lecture delivery
(casing – its functions and RW-16 functions and types, API knowledge of casing with videos,
types, API grades of the AV-11 grades of the casing and – its functions and and discussion
casing and its properties, AV-12 its properties, along with types, API grades of
threads and couplings) the threads and the casing and its
couplings. properties, along with
the threads and
couplings.
Lecture 23 Casing and cementation R-1 RW-14 Discuss the casing The students learn to Lecture delivery
(casing design and it's AV-10 design and it's related design the casing and with videos,
related numerical problems) numerical problems. it's related numerical and discussion
problems
Lecture 24 Casing and cementation R-1 RW-13 Introduction to The students gain Lecture delivery
(cementation operations- AV-9 cementation operations- knowledge with videos,
functions of cement and its functions of cement and cementation animations, and
classification) its classification, operations- functions discussion.
strength retrogradation of cement and its
and cement additives. classification,
strength
retrogradation, and
cement additives.
Casing and cementation R-1 RW-13 Introduction to The students gain Lecture delivery
(strength retrogradation and AV-9 cementation operations- knowledge with videos,
cement additives) functions of cement and cementation animations, and
its classification, operations- functions discussion.
strength retrogradation of cement and its
and cement additives. classification,
strength
retrogradation, and
cement additives.

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
Week 9 Lecture 25 Casing and cementation R-1 RW-13 Introduction to The students gain Lecture delivery
(cementation operations- AV-9 cementation operations- knowledge with videos,
functions of cement and its functions of cement and cementation animations, and
classification) its classification, operations- functions discussion.
strength retrogradation of cement and its
and cement additives. classification,
strength
retrogradation, and
cement additives.
Casing and cementation R-1 RW-13 Introduction to The students gain Lecture delivery
(strength retrogradation and AV-9 cementation operations- knowledge with videos,
cement additives) functions of cement and cementation animations, and
its classification, operations- functions discussion.
strength retrogradation of cement and its
and cement additives. classification,
strength
retrogradation, and
cement additives.
Lecture 26 Casing and cementation R-1 RW-12 Describe the methods of The students will be Lecture delivery
(methods of cementation and AV-8 cementation and able to describe with videos,
cementing accessories) cementing accessories. methods of animations, and
cementation and discussion.
cementing
accessories.
Lecture 27 Casing and cementation R-1 RW-11 Discuss the field The students will be Lecture delivery
(field problems pertaining to AV-7 problems pertaining to able to understand with videos,
cementation job and cement cementation job and field problems animations, and
slurry calculations.) cement slurry pertaining to discussion.
calculations. cementation job and
cement slurry
calculations.
Week 10 Lecture 28 Rig hydraulics(fluid flow R-1 RW-5 Introduction to fluid The students will Lecture delivery
and associated pressures in AV-5 flow and associated gain knowledge of with videos,
the rotary rig circulating pressures in the rotary fluid flow and animations, and
system) rig circulating system associated pressures discussion.
in the rotary rig
circulating system
Lecture 29 Rig hydraulics(types of R-1 RW-4 Discuss the various The students will be Lecture delivery
fluids and its flow) AV-4 types of fluids and its able to analyze types with videos,
flow. of fluids and its flow. animations, and
discussion.
Lecture 30 Rig hydraulics(pressure R-1 RW-3 Describe the pressure The students will Lecture delivery
losses in pipe and annulus AV-3 losses in pipe and gain knowledge of with videos,
during drilling operations) annulus during drilling pressure losses in animations, and
operations. pipe and annulus discussion.
during drilling
operations.

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
Week 11 Lecture 31 Rig hydraulics(pressure R-1 RW-3 Describe the pressure The students will Lecture delivery
losses in pipe and annulus AV-3 losses in pipe and gain knowledge of with videos,
during drilling operations) annulus during drilling pressure losses in animations, and
operations. pipe and annulus discussion.
during drilling
operations.
Lecture 32 Rig hydraulics(fluid flow R-1 RW-2 Describe the fluid flow The students will Lecture delivery
and pressure drop across bit AV-2 and pressure drop across analyze fluid flow with videos,
nozzles) bit nozzles. and pressure drop animations, and
across bit nozzles discussion.
Lecture 33 Rig hydraulics(equivalent R-1 RW-1 Define and describe The students will be Lecture delivery
circulating density (ECD) AV-1 equivalent circulating able to understand with videos,
flow models.) density (ECD) flow equivalent circulating animations, and
models. density (ECD) flow discussion.
models.
Week 12 Lecture 34 Drilling techniques and R-1 RW-22 Introduction to The students will Lecture delivery
types of well, well control, AV-18 directional, horizontal gain knowledge of with videos,
coring, and fishing and multilateral drilling directional, animations, and
(introduction to directional, techniques. horizontal and discussion.
horizontal and multilateral multilateral drilling
drilling techniques) techniques and their
uses.
Lecture 35 Online Assignment
Lecture 36 Drilling techniques and R-1 RW-20 Describe the types of The students will be Lecture delivery
types of well, well control, AV-16 wells and their able to analyze the with videos,
coring, and fishing(types of applications, and types of wells and animations, and
wells and their applications) analyze the terminology their applications, discussion.
and basic mathematics along with the
used in directional terminology and
wells. basic mathematics
used in directional
wells.
Week 13 Lecture 37 Drilling techniques and R-1 RW-21 Describe the types of The students will be Lecture delivery
types of well, well control, AV-17 wells and their able to analyze the with videos,
coring, and fishing(the applications, and types of wells and and discussion
terminology and basic analyze the terminology their applications,
mathematics used in and basic mathematics along with the
directional wells) used in directional terminology and
wells. basic mathematics
used in directional
wells.
Lecture 38 Drilling techniques and R-1 RW-19 Describe the various The students gain the Lecture delivery
types of well, well control, AV-15 downhole motors, knowledge of various with videos,
coring, and fishing survey equipment, downhole motors, and discussion
(downhole motors, survey rotary survey system survey equipment,
equipment, rotary survey used in directional rotary survey system
system) drilling. used in directional
drilling techniques.

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
Week 13 Lecture 39 Drilling techniques and R-1 RW-18 Describe well control, The students will be Lecture delivery
types of well, well control, AV-14 well control equipment able to define well with videos,
coring, and fishing(well BOP and different control - well control and discussion
control - well control techniques of well equipment BOP and
equipment BOP and control, coring and different techniques
different techniques of well fishing tools and of well control,
control) coring and fishing
tools and their
operations.
Week 14 Lecture 40 Drilling techniques and R-1 RW-17 Describe well control, The students will be Lecture delivery
types of well, well control, AV-13 well control equipment able to define well with videos,
coring, and fishing(coring BOP and different control - well control and discussion
and fishing tools and their techniques of well equipment BOP and
operations.) control, coring and different techniques
fishing tools and their of well control,
operations.Describe well coring and fishing
control, tools and their
well control equipment operations.
BOP and different
techniques of well
control, coring and
fishing tools and their
operations.

SPILL OVER
Week 14 Lecture 41 Spill Over
Lecture 42 Spill Over
Week 15 Lecture 43 Spill Over
Lecture 44 Spill Over
Lecture 45 Spill Over

Plan for Tutorial: (Please do not use these time slots for syllabus coverage)

Tutorial No. Lecture Topic Type of pedagogical tool(s) planned


(case analysis,problem solving test,role play,business game etc)

Tutorial1 Drilling rig power calculations Problem Solving


Tutorial2 Static and dynamic crown loads Problem Solving
Tutorial3 Drilling mud density and hydro-static pressure calculations Problem Solving
Tutorial4 Drilling mud density modification calculations Problem Solving
Tutorial5 Drill pipe stuck calculations Problem Solving

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.
Tutorial6 Drill mud fluid lost calculations Problem Solving
Tutorial7 Numerical on hole problems Problem Solving
After Mid-Term
Tutorial8 Casing string design - Burst resistance Problem Solving
Tutorial9 casing string design - Collapse resistance Problem Solving
Tutorial10 Cement slurry properties calculations Problem Solving
Tutorial11 Pressure loss calculations - Bingham plastic model Problem Solving
Tutorial12 Pressure loss calculations - Power-law model Problem Solving
Tutorial13 J Type directional well trajectory calculations Case Analysis,Problem Solving
Tutorial14 S - type directional well trajectory calculations Case Analysis,Problem Solving

An instruction plan is only a tentative plan. The teacher may make some changes in his/her teaching plan. The students are advised to use syllabus for preparation of all examinations. The students are expected to keep themselves
updated on the contemporary issues related to the course. Upto 20% of the questions in any examination/Academic tasks can be asked from such issues even if not explicitly mentioned in the instruction plan.