@ HyuNDAr FoRMwoRK sDN BHD (No:e7s,6s-X)

Our Ref: HFSB/SB/SCPIS/1 I 05 1 5lWS

llth May 2015 SALES CONTRACT


Southern Builders Sdn. Bhd. Tel No: 07-335 5977
Suite 01-03, Level 1, North Wing, Fax No: 01-332 5977
Pasar Borong Pandan, Kangkar Terbrau, Email: skyhabitatl63@gmail.com
81100, Johor Bahru, Kuala Lumpur Email: jbcc@gmatl.com
Email : mfk.tahir@gmail. com
Attention: Mr. Mohamad Fathi Kamil Bin Mohd Tahir

Dear Sir,
RE: SALES OF " Type A o'or'o Type B " SCP ( Self Climbine Platform)
Proiect: ( Komtar Hotel ) I Blk of 20 Levels (338 units) Lot 14350, Jalan Tun Abdul Razak. Johor Bahru.
We are pleased to submit our sales contract for SCP (Self Climbing Platform) System based on typical tower
area only as follow:
Block Hotel Typical tower starting from Lerrel 10 to level 32 as follow :
Floorcoveredl Totaltloor perimeter: 150.00m
23 Leuels 77.2n TotalAreacovered: 115g0.00m,
from 110 - 132 Height:
Floor Height : 3.3m (level 10-12 ; 3.5m and Level 32: 4.0m )

Option: (1) or (2 ) + ( 3&4 )+{5}


{1):SalesPrice@scP
Twe "A " Heaw Dutv Twe "8" Medium Dutv

Framework €werage of Floors 2% Levels lm' TA Leuels lm'


Block Hotel Total Framework Price RM 1,050,000.00 RM 90.67 RM 975,000.00 RM 84.20

Total RM 1,050,000.00 Total RM 975,000.00

Tvoe "A " Heaw Dutv TvDe "B" liledirm Duhr

Framework Coverage of Floors 314 Levels tm' 3X levels lm'


Block Hotet Total Framework Price RM 1,200,000.00 RM103.63 RM 1,125,000.00 RM 97.15

Total RM 1,200,000.00 RM 1,125,0m.00

{ 2 } I Sales with goods return @ scP

Type "A " Heavy Duty Type "8" Medium Duty

13th months 13th months


2% Levels period : 2% levels period:
tramework Coverage of Floors
12 Monthj
lm' onwards rental / 12 Months
lm' onwards rental /
month month

Block Hotel Total Framework Price RM 735,000.00 RM 63.47 RM61,250.m RM 682,500.00 RM 58.94 RM55,875.00

Total RM 735,0m.00 RM 582,500.00

Tvoe "A " HeavY Dutv Type "B" Medium Duty

13th months 13th months


3% levels period : 31{ levels period :
Framework Coverage of Floors
12 Months
lm' onwards rental / 12 Months
lm' onwards rental f
marth month

Block Hotel Total Framework Pric€ RM 840,000.00 RM 72.54 RM70,000.00 RM 787,500.00 Rtv 58.01 RM65,625.00

Total RM 840,000.00 RM 787,500.00

No. 10-2, Jalan Danau Lumayan 1, Bandar Sri Permaisuri, Cheras, 56000 Kuala Lumpur, Malaysia.
Tel : + 603-9171 3166 Fax : * 603-9171 6166
E-mail : hyundaiform@gmail.com Website : www.hyrndaiform.com page 1of 4
@ HyuNDAr FoRMwoRK sDN BHD (No:e75r65-X)

( 3 ) . Charges for Erection & Dismantle per block as follow :

2% levels 3% Levels
Block Hotel lmz Block Hotel lmZ
Each Time Erection RM 33,000.00 RM2.85 RM 35,000.00 RM3.02
Each Time Dismantle RM 33,000.00 RM2.85 RM 35,000.00 RM3.02

{4}. Monthly Service Charges for Liftting & Decending per block as follow :

For Level ol 2 % & 3 % Coverage Minimium 6 months 7 months onwards

Technical staffs supervision rate per month @ RM 10,000.00 Per Block RM 8,000.00 Per Block

Remarks : L) Main Con has to Provide 10 part time workers as and when required for installation / Dismantle and
other assistans works.
2) For Embedment services, we will provide free embedment for 3 levels starting from Level 1, after which will be
taking over by main-con to continue the services.
3) The Monthly service charges will only be started upon completion of installation works.
4) ln the event if there is any shortfall or access payment, either party has to reimbursed for the different.
( 5 ) . Sales with goods return @ SLP ( Self Loading Platform) as follow :

Self Loading Platform I nv 80,000.00 | / set

Note for item (5) : Must purchase together with either option (1) or (2) of our SCP (Self Climbing Platform) and we will provide
free service for Liftting / Decending arrangement.

Quotation
Exclude: Unloading, Mobile / Tower Crane, Temporary Platform to support installation work, 50 mm G.I
Pipe & coupling for bracing pu{posed, fabric netting, basic tools, screw / accessories, machinery,
lubricants, pvc pipe / sheet, tape, hole patching materials, power supply (including cable) etc.

Notes: Price quoted is based on your drawing and are subject to final measurement on the actual
Framework area. The SCP system is applied at typical floors only. Lifting services will start
from the date of erection completed of each biock.

1) Payment Term: Sales : Deposit: 30% of Sales value payable by Telegraphic Transfer (TT)
Bank Draft within Seven (7) working days from the date of Purchase
Order.
: Balance 65% af Sales value payable by Irrevocable Transferable
At Sight Letter of Credit (LC) within 30 days before materials arrived to site.
Balance af 5o/o upon completion of installation at site.

2) Letter of Credit: Irrevocable Letter of Credit At Sight.


( for Sales Only ) Expiry Date: To provide additional 15 days from the last shipment date.
Shipment - Partial & transshipment allowed. +l- Ten (10%) percent tolerance on
quantity and of sales value.

No. l0-2, Jalan Danau Lumayan 1, Bandar Sri Permaisuri, Cheras, 56000 Kuala Lumpur, Malaysia.
Tel : + 603-9171 3166 Fax : * 603-9171 6166
E-mail : hyundaiform@gmail.com Website : www.hyundaiform.com page 2 of 4
@ HyuNDAr FoRMwoRK sDN BHD (No:e7s,65-X)

3) Price: All Price quoted in Ringgit Malaysia deliver to site exclude unloading & GST.

a) Goods & Service Tax: Hyundai Formwork Sdn. Bhd. shall be entitled to impose (6%) Goods &
Services Tax rate on the invoice value in compliance with the implementation
of the Goods & Service Tax by the Malaysia Government effective 1tt April
2015.

5) Delivery Period: 90 days from the date of approved shell plan stamp and Signed for the first
block, Batrance of SCP for other block would be on site progressively over a
further period of 2-3 weeks time frame.

6) Maintenance Servtces: 12 months warranty for all the parts and accessories.

7) Commencement Period : The date of commencement is applied on 15 days from the date of final delivery
( for Sales with of completed set of Self Climbing Platform Equipment at the project site or the
Goods Returned Only) date of commencement of first set up of Self Climbing Platform Equipment
Whichever comes earlier.

8) Usage Period: Option for Sales with Goods Retuned contract period is for 12 months. If
(for Sales with the fuli set of Equipment returned less than 12 months, the total usage rate
Goods Returned Only) still be charged at full amount.

9) Termination Notice: To terminate or end of the usage period service, the main contractor must give
(for Sales with Goods us a letter of notice at least I Month (30 days) before the end of Contract.
Returned Only) The usage period shall be reasonable and agreed by both sides.

10) Goods returned Upon completion of the first project, you have to returned the Full Set
( for Sales with Framework to us within 1 month to our designated factory within Malaysia.
Goods Returned Only) Arrangement of return & transport expenses are bear by Purchaser / Hirer.

11) Lost or Damaged Item: In the event if The Self-Climbing Platform Set quantities are short, missing or (
for (Sales with damaged when returned, these shorted or damaged items will be charged as sold
Goods Retumed Only) unit.

12) Main Con Provide : Working area for our equipment, scaffolding, hoisting, crane and forklift for
& site offrce for our technical staffs,
assistant of installation work, site store
accommodation & transport for all our technical staffs and workers, electric
supply (including wiring) connect to our system.

13) Site Insurance: Main contractor must provide insurance as follow:

A) Cover the lost or damaged of SCP materials. In the event if main contractor
did not buy the insurance, then the lost or damaged items willbe charged as
sold units.
B) Cover our workers during the whole operation of works at your site.

14) Working Hours On a normal working day (Monday to Saturday), our working hours is from
8.00 am to 5.00 pm. Any overtime or work on public holiday / Sunday shall be
claimed according to labour law rate.

No. l0-2, Jalan Danau Lumayan 1, Bandar Sri Permaisuri, Cheras, 56000 Kuala Lumpur, Malaysia.
Tel: + 603-91713166 Fax: *
603-9171 6166
E-mail : hyundaiform@gmail.com Website : www.hyrndaiform.com page 3 of 4
@ HyuNDAr FoRMwoRK sDN BHD (No:e75,65-x)

15) Cancellation Charges: 30% will be charged within 30 days from the date of P.O, thereafter will be
considered sold.
16) Work Idling: Any changes in drawings or delay in work schedules at site will be charged as
work idling.

17) Variable Order: Framework production will start 7 days upon contract signed. Any changes in
drawing received after 7 days will be charged as V.O.

18) Future Projects Design, refurbishment and monthly storage charges of framework can be
arranged with reasonable charges.

19) Validity date: 15 days from date of this quotation.

Looking forward for your favorable confirmation and hope to hear from you soon. Please do not hesitate to
call the undersigned for further discussion.

Yours faithfully,

HYLINDAI FORMWORK SDN BHD We confirm and accept the SCP option:
forLevel: 2%Optiont. or Option2
for Level: 3% Option I or Option 2

Authorised Sign & Co. Chop


Sales Engineer Name :
HIP:012-387 9633
Position :

Date:

HYUNDAI FORMWORK SDN BHD

/l
-t
i/I

J*rt "1t",
Sean Seah
General Manager
HIP: 012-2A6 2626" 016-368 6606

No. 10-2, Jalan Danau Lumayan 1, Bandar Sri Permaisuri, Cheras, 56000 Kuala Lumpur, Malaysia.
Tel: + 603-9171 3166 Fax: *
603-9177 6166
E-mail : hyundaiform@gmail.com Website : www.hyundaiform.com page 4 of 4